| State | QLD |
|---|
| Date of Visit | 24/08/2022 |
|---|
| Technician's Name | John Goncalves |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 67410 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in QLD | cairns |
|---|
|
|
|---|
| Location Name | Cairns |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | Biennial Test (once every two years) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| RCD Details (Biennial) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| Db1 |
1 |
Y |
29 |
39.2 |
P |
|
|
| Db1 |
2 |
Y |
29 |
39 |
P |
|
|
| Db1 |
3 |
Y |
28.8 |
38.8 |
P |
|
|
| Db1 |
4 |
Y |
29 |
39 |
P |
|
|
| Db1 |
5 |
Y |
28.8 |
29 |
P |
|
|
| Db1 |
6 |
Y |
29 |
39 |
P |
|
|
| Db1 |
7 |
Y |
23.1 |
15.3 |
P |
|
|
| Db1 |
14 |
Y |
29 |
39 |
P |
|
|
| Db1 |
15 |
Y |
23.9 |
383 |
P |
|
|
| Db1 |
16 |
Y |
45.5 |
42.6 |
P |
|
|
| Db1 |
17 |
Y |
29.2 |
39 |
P |
|
|
| Db1 |
18 |
Y |
29 |
38.8 |
P |
|
|
| Db1 |
22 |
Y |
22.9 |
33.1 |
P |
|
|
| Db1 |
23 |
Y |
29 |
39.2 |
P |
|
|
| Db1 |
24 |
Y |
28.4 |
18.4 |
P |
|
|
| Db1 |
25 |
Y |
28.8 |
18.2 |
P |
|
|
| Db1 |
26 |
Y |
29 |
29 |
P |
|
|
| Db1 |
27 |
Y |
23.1 |
18 |
P |
|
|
| Db1 |
28 |
Y |
31.1 |
19.3 |
P |
|
|
| Db1 |
34 |
Y |
29 |
39 |
P |
|
|
| Db1 |
35 |
Y |
29 |
39 |
P |
|
|
| Db1 |
58 |
Y |
27.5 |
28 |
P |
|
|
| Db1 |
59 |
Y |
29 |
39 |
P |
|
|
| Db1 |
63 |
Y |
29.2 |
39 |
P |
|
|
| Db1 |
64 |
Y |
29 |
39.2 |
P |
|
|
| Db1 |
65 |
Y |
29.2 |
39 |
P |
|
|
| Db1 |
69 |
Y |
29.2 |
17.2 |
P |
|
|
| Db sr2 |
11 |
Y |
28.6 |
18.6 |
P |
|
|
| Db sr2 |
13 |
Y |
- |
- |
F |
Faulty |
Y |
| Db sr2 |
15 |
Y |
28.5 |
18.6 |
P |
|
|
| Db sr2 |
17 |
Y |
28.4 |
18.5 |
P |
|
|
| Db sr2 |
19 |
Y |
29 |
18.9 |
P |
|
|
| Db sr2 |
2 |
Y |
18.4 |
18.4 |
P |
|
|
| Db sr2 |
4 |
Y |
28.6 |
18.9 |
P |
|
|
| Db sr2 |
6 |
Y |
28.6 |
18.6 |
P |
|
|
| Db sr2 |
8 |
Y |
28.6 |
18.9 |
P |
|
|
| Db sr2 |
10 |
Y |
28.6 |
18.9 |
P |
|
|
| Db sr2 |
12 |
Y |
23.5 |
15.5 |
P |
|
|
| Db sr2 |
14 |
Y |
23.9 |
15.9 |
P |
|
|
| Dbx |
1 |
Y |
28.8 |
28.6 |
P |
|
|
| Dbx |
3 |
Y |
29.7 |
14.2 |
P |
|
|
| Dbx |
5 |
Y |
29.2 |
39.2 |
P |
|
|
| Dbx |
7 |
Y |
22.9 |
13.1 |
P |
|
|
| Dbx |
11 |
Y |
23.7 |
15 |
P |
|
|
| Dbx |
13 |
Y |
29 |
39 |
P |
|
|
| Dbx |
15 |
Y |
28.8 |
29 |
P |
|
|
| Dbx |
17 |
Y |
28.8 |
39 |
P |
|
|
| Dbx |
19 |
Y |
29 |
39 |
P |
|
|
| Dbx |
21 |
Y |
28.8 |
39 |
P |
|
|
| Dbx |
23 |
Y |
29.2 |
39 |
P |
|
|
| Dbx |
25 |
Y |
28.8 |
28.8 |
P |
|
|
| Dbx |
27 |
Y |
7.2 |
17.8 |
P |
|
|
| Dbx |
29 |
Y |
28.8 |
38.8 |
P |
|
|
| Dbx |
31 |
Y |
29.7 |
34.7 |
P |
|
|
| Dbx |
33 |
Y |
28.8 |
38.8 |
P |
|
|
| Dbx |
35 |
Y |
23.7 |
14.8 |
P |
|
|
| Dbx |
2 |
Y |
28.8 |
38.8 |
P |
|
|
| Dbx |
4 |
Y |
29 |
39.2 |
P |
|
|
| Dbx |
6 |
Y |
23.7 |
33.9 |
P |
|
|
| Dbx |
8 |
Y |
23.3 |
13.6 |
P |
|
|
| Dbx |
10 |
Y |
29 |
39.2 |
P |
|
|
| Dbx |
12 |
Y |
71.6 |
39 |
P |
|
|
| Dbx |
14 |
Y |
28.8 |
39 |
P |
|
|
| Dbx |
16 |
Y |
23.3 |
18.6 |
P |
|
|
| Dbx |
18 |
Y |
29 |
19.1 |
P |
|
|
| Dbx |
20 |
Y |
29 |
39.2 |
P |
|
|
| Dbx |
22 |
Y |
23.7 |
33.9 |
P |
|
|
| Dbx |
24 |
Y |
27.6 |
14.8 |
P |
|
|
| Dbx |
26 |
Y |
29.2 |
39.4 |
P |
|
|
| Dbx |
28 |
Y |
29.2 |
39.2 |
P |
|
|
| Dbx |
30 |
Y |
23.5 |
33.5 |
P |
|
|
| Dbx |
32 |
Y |
23.3 |
33.3 |
P |
|
|
| Dbx |
34 |
Y |
24.2 |
15.3 |
P |
|
|
| Dbx |
Dyson dinrail |
Y |
169.9 |
161 |
P |
|
|
| Dbx 2 |
1 |
Y |
23.7 |
14.8 |
P |
|
|
| Dbx 2 |
3 |
Y |
23.3 |
14.8 |
P |
|
|
| Dbx 2 |
5 |
Y |
28.8 |
19.3 |
P |
|
|
| Dbx 2 |
7 |
Y |
23.7 |
14.6 |
P |
|
|
| Dbx 2 |
9 |
Y |
23.3 |
18.9 |
P |
|
|
| Dbx 2 |
11 |
Y |
23.3 |
14.2 |
P |
|
|
| Dbx 2 |
13 |
Y |
24.4 |
18.4 |
P |
|
|
| Dbx 2 |
15 |
Y |
28.6 |
18.4 |
P |
|
|
| Dbx 2 |
17 |
Y |
28.6 |
18.9 |
P |
|
|
| Dbx 2 |
19 |
Y |
28.2 |
18.6 |
P |
|
|
| Dbx 2 |
21 |
Y |
28.6 |
18.6 |
P |
|
|
| Dbx 2 |
23 |
Y |
24.8 |
16.1 |
P |
|
|
| Dbx 2 |
2 |
Y |
28.6 |
17.4 |
P |
|
|
| Dbx 2 |
4 |
Y |
29.9 |
20.8 |
P |
|
|
| Dbx 2 |
6 |
Y |
28.8 |
18.9 |
P |
|
|
| Dbx 2 |
8 |
Y |
29.4 |
20.3 |
P |
|
|
| Dbx 2 |
10 |
Y |
23.5 |
13.3 |
P |
|
|
| Dbx 2 |
12 |
Y |
24.2 |
15 |
P |
|
|
| Dbx 2 |
14 |
Y |
23.1 |
14.2 |
P |
|
|
| Dbx 2 |
16 |
Y |
24.4 |
18.6 |
P |
|
|
| Dbx 2 |
18 |
Y |
28.6 |
18.6 |
P |
|
|
| Dbx 2 |
20 |
Y |
28.4 |
18.4 |
P |
|
|
| Dbx 2 |
22 |
Y |
28.2 |
18.4 |
P |
|
|
| Dbx 2 |
24 |
Y |
28.6 |
18.6 |
P |
|
|
| Db5 |
4 |
Y |
8.3 |
17.6 |
P |
|
|
| Db5 |
5 |
Y |
8.5 |
15.7 |
P |
|
|
| Db5 |
6 |
Y |
8.1 |
13.1 |
P |
|
|
| Db5 |
7 |
Y |
6.4 |
14.2 |
P |
|
|
| Db5 |
8 |
Y |
8.7 |
18.6 |
P |
|
|
| Db5 |
13 |
Y |
8.5 |
15.7 |
P |
|
|
| Db5 |
14 |
Y |
8.9 |
16.3 |
P |
|
|
| Db5 |
15 |
Y |
8.3 |
13.1 |
P |
|
|
| Db5 |
16 |
Y |
8.5 |
15.3 |
P |
|
|
| Db5 |
17 |
Y |
6.8 |
12.7 |
P |
|
|
| Db5 |
18 |
Y |
7.8 |
12.9 |
P |
|
|
| Db5 |
19 |
Y |
8.7 |
15.5 |
P |
|
|
| Db5 |
20 |
Y |
9.1 |
18.4 |
P |
|
|
| Db5 |
21 |
Y |
7.6 |
16.3 |
P |
|
|
| Db5 |
22 |
Y |
8.5 |
15 |
P |
|
|
| Db5 |
23 |
Y |
15 |
15.3 |
P |
|
|
| Db5 |
24 |
Y |
6.4 |
14.2 |
P |
|
|
|
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB1 |
1 |
R |
Y |
Y |
Y |
P |
|
|
|
|
2 |
R |
Y |
Y |
Y |
P |
|
|
|
|
3 |
R |
Y |
Y |
Y |
P |
|
|
|
|
4 |
R |
Y |
Y |
Y |
P |
|
|
|
|
5 |
R |
Y |
Y |
Y |
P |
|
|
|
|
6 |
R |
Y |
N |
Y |
F |
Failed 90 min test |
Y |
N |
|
7 |
R |
Y |
Y |
Y |
P |
|
|
|
|
8 |
R |
Y |
Y |
Y |
P |
|
|
|
|
9 |
R |
Y |
Y |
Y |
P |
|
|
|
|
10 |
R |
Y |
Y |
Y |
P |
|
|
|
|
11 |
R |
Y |
Y |
Y |
P |
|
|
|
|
12 |
R |
Y |
Y |
Y |
P |
|
|
|
|
13 |
R |
Y |
Y |
Y |
P |
|
|
|
|
14 |
R |
Y |
Y |
Y |
P |
|
|
|
|
15 |
R |
Y |
Y |
Y |
P |
|
|
|
|
16 |
R |
Y |
Y |
Y |
P |
|
|
|
|
17 |
R |
Y |
Y |
Y |
P |
|
|
|
|
18 |
R |
Y |
Y |
Y |
P |
|
|
|
|
19 |
R |
Y |
Y |
Y |
P |
|
|
|
|
20 |
R |
Y |
Y |
Y |
P |
|
|
|
|
21 |
S |
Y |
Y |
Y |
P |
|
|
|
|
22 |
R |
Y |
Y |
Y |
P |
|
|
|
|
23 |
R |
Y |
Y |
Y |
P |
|
|
|
|
24 |
R |
Y |
Y |
Y |
P |
|
|
|
|
25 |
S |
Y |
Y |
Y |
P |
|
|
|
|
26 |
S |
Y |
Y |
Y |
P |
|
|
|
|
27 |
S |
Y |
Y |
Y |
P |
|
|
|
|
28 |
S |
Y |
Y |
Y |
P |
|
|
|
|
29 |
S |
Y |
Y |
Y |
P |
|
|
|
|
30 |
S |
Y |
Y |
Y |
P |
|
|
|
|
31 |
R |
Y |
Y |
Y |
P |
|
|
|
|
32 |
R |
Y |
Y |
Y |
P |
|
|
|
|
33 |
R |
Y |
Y |
Y |
P |
|
|
|
|
34 |
R |
Y |
Y |
Y |
P |
|
|
|
|
35 |
R |
Y |
Y |
Y |
P |
|
|
|
|
36 |
R |
Y |
Y |
Y |
P |
|
|
|
|
37 |
R |
Y |
Y |
Y |
P |
|
|
|
|
38 |
R |
Y |
Y |
Y |
P |
|
|
|
|
60 |
R |
Y |
Y |
Y |
P |
|
|
|
|
61 |
R |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
40 |
Y |
Y |
Y |
P |
|
|
|
|
41 |
Y |
Y |
Y |
P |
|
|
|
|
42 |
Y |
Y |
Y |
P |
|
|
|
|
43 |
Y |
Y |
Y |
P |
|
|
|
|
44 |
Y |
Y |
Y |
P |
|
|
|
|
45 |
Y |
Y |
Y |
P |
|
|
|
|
45 |
Y |
Y |
Y |
P |
|
|
|
|
46 |
Y |
Y |
Y |
P |
|
|
|
|
47 |
Y |
Y |
Y |
P |
|
|
|
|
48 |
Y |
Y |
Y |
P |
|
|
|
|
49 |
Y |
Y |
Y |
P |
|
|
|
|
50 |
Y |
N |
Y |
F |
Failed 90 min test |
Y |
N |
|
51 |
Y |
Y |
Y |
P |
|
|
|
|
52 |
Y |
Y |
Y |
P |
|
|
|
|
53 |
Y |
Y |
Y |
P |
|
|
|
|
54 |
Y |
Y |
Y |
P |
|
|
|
|
55 |
Y |
Y |
Y |
P |
|
|
|
|
56 |
Y |
Y |
Y |
P |
|
|
|
|
57 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| LED highways lights |
Y |
| Down lights LED |
Y |
| LED Batten |
Y |
| LED strip lighting - displays CFL's |
Y |
| Large round downlights-fluro- Tiolets only |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| Exit light |
#50 |
1 |
Failed 90 min test |
Y |
N |
N |
Supplied and installed 1x exit fitting. |
| Recessed Emergency light |
#6 |
1 |
Failed 90 min test |
Y |
N |
N |
Supplied and installed 1x Recessed Emergency light, Access equipment required to complete works safely. |
| RCBO 13 |
DB SR2 |
1 |
Failed trip test |
Y |
N |
N |
Replaced. |
|
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Next Test Due in 6 months | 24/02/2022 |
|---|
| |
|---|
| |