StateQLD
Date of Visit24/08/2022
Technician's NameJohn Goncalves
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number67410
EmailEmail hidden; Javascript is required.
The Good Guys Site in QLDcairns

Location NameCairns
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
Db1 1 Y 29 39.2 P
Db1 2 Y 29 39 P
Db1 3 Y 28.8 38.8 P
Db1 4 Y 29 39 P
Db1 5 Y 28.8 29 P
Db1 6 Y 29 39 P
Db1 7 Y 23.1 15.3 P
Db1 14 Y 29 39 P
Db1 15 Y 23.9 383 P
Db1 16 Y 45.5 42.6 P
Db1 17 Y 29.2 39 P
Db1 18 Y 29 38.8 P
Db1 22 Y 22.9 33.1 P
Db1 23 Y 29 39.2 P
Db1 24 Y 28.4 18.4 P
Db1 25 Y 28.8 18.2 P
Db1 26 Y 29 29 P
Db1 27 Y 23.1 18 P
Db1 28 Y 31.1 19.3 P
Db1 34 Y 29 39 P
Db1 35 Y 29 39 P
Db1 58 Y 27.5 28 P
Db1 59 Y 29 39 P
Db1 63 Y 29.2 39 P
Db1 64 Y 29 39.2 P
Db1 65 Y 29.2 39 P
Db1 69 Y 29.2 17.2 P
Db sr2 11 Y 28.6 18.6 P
Db sr2 13 Y - - F Faulty Y
Db sr2 15 Y 28.5 18.6 P
Db sr2 17 Y 28.4 18.5 P
Db sr2 19 Y 29 18.9 P
Db sr2 2 Y 18.4 18.4 P
Db sr2 4 Y 28.6 18.9 P
Db sr2 6 Y 28.6 18.6 P
Db sr2 8 Y 28.6 18.9 P
Db sr2 10 Y 28.6 18.9 P
Db sr2 12 Y 23.5 15.5 P
Db sr2 14 Y 23.9 15.9 P
Dbx 1 Y 28.8 28.6 P
Dbx 3 Y 29.7 14.2 P
Dbx 5 Y 29.2 39.2 P
Dbx 7 Y 22.9 13.1 P
Dbx 11 Y 23.7 15 P
Dbx 13 Y 29 39 P
Dbx 15 Y 28.8 29 P
Dbx 17 Y 28.8 39 P
Dbx 19 Y 29 39 P
Dbx 21 Y 28.8 39 P
Dbx 23 Y 29.2 39 P
Dbx 25 Y 28.8 28.8 P
Dbx 27 Y 7.2 17.8 P
Dbx 29 Y 28.8 38.8 P
Dbx 31 Y 29.7 34.7 P
Dbx 33 Y 28.8 38.8 P
Dbx 35 Y 23.7 14.8 P
Dbx 2 Y 28.8 38.8 P
Dbx 4 Y 29 39.2 P
Dbx 6 Y 23.7 33.9 P
Dbx 8 Y 23.3 13.6 P
Dbx 10 Y 29 39.2 P
Dbx 12 Y 71.6 39 P
Dbx 14 Y 28.8 39 P
Dbx 16 Y 23.3 18.6 P
Dbx 18 Y 29 19.1 P
Dbx 20 Y 29 39.2 P
Dbx 22 Y 23.7 33.9 P
Dbx 24 Y 27.6 14.8 P
Dbx 26 Y 29.2 39.4 P
Dbx 28 Y 29.2 39.2 P
Dbx 30 Y 23.5 33.5 P
Dbx 32 Y 23.3 33.3 P
Dbx 34 Y 24.2 15.3 P
Dbx Dyson dinrail Y 169.9 161 P
Dbx 2 1 Y 23.7 14.8 P
Dbx 2 3 Y 23.3 14.8 P
Dbx 2 5 Y 28.8 19.3 P
Dbx 2 7 Y 23.7 14.6 P
Dbx 2 9 Y 23.3 18.9 P
Dbx 2 11 Y 23.3 14.2 P
Dbx 2 13 Y 24.4 18.4 P
Dbx 2 15 Y 28.6 18.4 P
Dbx 2 17 Y 28.6 18.9 P
Dbx 2 19 Y 28.2 18.6 P
Dbx 2 21 Y 28.6 18.6 P
Dbx 2 23 Y 24.8 16.1 P
Dbx 2 2 Y 28.6 17.4 P
Dbx 2 4 Y 29.9 20.8 P
Dbx 2 6 Y 28.8 18.9 P
Dbx 2 8 Y 29.4 20.3 P
Dbx 2 10 Y 23.5 13.3 P
Dbx 2 12 Y 24.2 15 P
Dbx 2 14 Y 23.1 14.2 P
Dbx 2 16 Y 24.4 18.6 P
Dbx 2 18 Y 28.6 18.6 P
Dbx 2 20 Y 28.4 18.4 P
Dbx 2 22 Y 28.2 18.4 P
Dbx 2 24 Y 28.6 18.6 P
Db5 4 Y 8.3 17.6 P
Db5 5 Y 8.5 15.7 P
Db5 6 Y 8.1 13.1 P
Db5 7 Y 6.4 14.2 P
Db5 8 Y 8.7 18.6 P
Db5 13 Y 8.5 15.7 P
Db5 14 Y 8.9 16.3 P
Db5 15 Y 8.3 13.1 P
Db5 16 Y 8.5 15.3 P
Db5 17 Y 6.8 12.7 P
Db5 18 Y 7.8 12.9 P
Db5 19 Y 8.7 15.5 P
Db5 20 Y 9.1 18.4 P
Db5 21 Y 7.6 16.3 P
Db5 22 Y 8.5 15 P
Db5 23 Y 15 15.3 P
Db5 24 Y 6.4 14.2 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 1 R Y Y Y P
2 R Y Y Y P
3 R Y Y Y P
4 R Y Y Y P
5 R Y Y Y P
6 R Y N Y F Failed 90 min test Y N
7 R Y Y Y P
8 R Y Y Y P
9 R Y Y Y P
10 R Y Y Y P
11 R Y Y Y P
12 R Y Y Y P
13 R Y Y Y P
14 R Y Y Y P
15 R Y Y Y P
16 R Y Y Y P
17 R Y Y Y P
18 R Y Y Y P
19 R Y Y Y P
20 R Y Y Y P
21 S Y Y Y P
22 R Y Y Y P
23 R Y Y Y P
24 R Y Y Y P
25 S Y Y Y P
26 S Y Y Y P
27 S Y Y Y P
28 S Y Y Y P
29 S Y Y Y P
30 S Y Y Y P
31 R Y Y Y P
32 R Y Y Y P
33 R Y Y Y P
34 R Y Y Y P
35 R Y Y Y P
36 R Y Y Y P
37 R Y Y Y P
38 R Y Y Y P
60 R Y Y Y P
61 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
40 Y Y Y P
41 Y Y Y P
42 Y Y Y P
43 Y Y Y P
44 Y Y Y P
45 Y Y Y P
45 Y Y Y P
46 Y Y Y P
47 Y Y Y P
48 Y Y Y P
49 Y Y Y P
50 Y N Y F Failed 90 min test Y N
51 Y Y Y P
52 Y Y Y P
53 Y Y Y P
54 Y Y Y P
55 Y Y Y P
56 Y Y Y P
57 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
LED highways lights Y
Down lights LED Y
LED Batten Y
LED strip lighting - displays CFL's Y
Large round downlights-fluro- Tiolets only Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Exit light #50 1 Failed 90 min test Y N N Supplied and installed 1x exit fitting.
Recessed Emergency light #6 1 Failed 90 min test Y N N Supplied and installed 1x Recessed Emergency light, Access equipment required to complete works safely.
RCBO 13 DB SR2 1 Failed trip test Y N N Replaced.
Site Status SelectorStore now fully compliant
Next Test Due in 6 months24/02/2022