Partner NameSturdie Trade Services
StateVIC
Date of Visit02/09/2022
Technician's NameNathan McBain
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number67206
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICgeelong

Location NameGeelong
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB 1 Section A 01 Y 28 18 P
DB 1 Section A 03 Y 28 18 P
DB 1 Section A 05 Y 28 18 P
DB 1 Section A 07 Y 25 16 P
DB 1 Section A 09 Y 26 15 P
DB 1 Section A 11 Y 29 18 P
DB 1 Section A 13 Y 32 23 P
DB 1 Section A 15 Y 25 16 P
DB 1 Section A 17 Y 23 18 P
DB 1 Section A 19 Y 25 17 P
DB 1 Section A 21 Y 25 16 P
DB 1 Section A 23 Y 24 15 P
DB 1 Section A 25 Y 24 34 P
DB 1 Section A 27 Y 24 34 P
DB 1 Section A 29 Y 25 17 P
DB 1 Section A 31 Y 28 22 P
DB 1 Section A 33 Y 7 7 P
DB 1 Section A 35 Y 18 7 P
DB 1 Section A 36 Y 17 7 P
DB 1 Section A 44 Y 19 9 P
DB 1 Section A 46 Y 19 9 P
DB 1 Section A 48 Y 20 10 P
DB 1 Section B 01 Y 28 18 P
DB 1 Section B 02 Y 28 18 P
DB 1 Section B 03 Y 28 18 P
DB 1 Section B 04 Y 24 15 P
DB 1 Section B 05 Y 28 18 P
DB 1 Section B 06 Y 28 18 P
DB 1 Section B 07 Y 25 17 P
DB 1 Section B 08 Y 25 16 P
DB 1 Section B 09 Y 25 16 P
DB 1 Section B 10 Y 25 17 P
DB 1 Section B 11 Y 28 18 P
DB 1 Section B 12 Y 28 18 P
DB 1 Section B 13 Y 28 18 P
DB 1 Section B 14 Y 28 18 P
DB 1 Section B 15 Y 25 16 P
DB 1 Section B 16 Y 28 18 P
DB 1 Section B 17 Y 24 15 P
DB 1 Section B 18 Y 23 23 P
DB 1 Section B 19 Y 28 18 P
DB 1 Section B 20 Y 28 18 P
DB 1 Section B 21 Y 28 18 P
DB 1 Section B 22 Y 28 18 P
DB 1 Section B 23 Y 28 18 P
DB 1 Section B 24 Y 23 15 P
DB 1 Section B 25 Y 28 18 P
DB 1 Section B 26 Y 31 22 P
DB 1 Section B 27 Y 29 19 P
DB 1 Section B 29 Y 28 18 P
DB 1 Section B 31 Y 24 15 P
DB 1 Section B 33 Y 24 16 P
DB 1 Section B 35 Y 25 17 P
DB 3 1 Y 17 24 P
DB 3 3 Y 19 136 P
DB 3 5 Y 19 86 P
DB 3 14 Y 29 19 P
DB 3 23 Y 25 18 P
DB 3 24 Y 25 18 P
DB 3 25 Y 24 15 P
DB 3 26 Y 28 18 P
DB 3 27 Y 24 14 P
DB 3 28 Y 28 19 P
DB 3 29 Y 24 16 P
DB 3 30 Y 29 22 P
DB 3 31 Y 29 19 P
DB 3 32 Y 28 18 P
DB 3 33 Y 16 16 P
DB 3 34 Y 28 18 P
DB 3 35 Y 28 18 P
DB 3 36 Y 25 18 P
DB 3 37 Y 28 18 P
DB 3 38 Y 29 18 P
DB 3 40 Y 25 17 P
DB 3 42 Y 29 18 P
DB 3 45 Y 25 16 P
DB 3 47 Y 24 16 P
DB 2 3 Y 74 16 P
DB 2 5 Y 24 16 P
DB 2 7 Y 109 82 P
DB 2 9 Y 25 65 P
DB 2 11 Y 25 16 P
DB 2 13 Y 24 15 P
DB 2 15 Y 30 20 P
DB 2 17 Y 27 18 P
DB 2 19 Y 25 17 P
DB 2 21 Y 27 17 P
DB 2 23 Y 26 18 P
DB 2 25 Y 24 16 P
DB 2 27 Y 24 16 P
DB 2 29 Y 25 16 P
DB 2 31 Y 28 18 P
DB 2 32 Y 30 20 P
DB 2 33 Y 11 20 P
DB 2 34 Y 24 16 P
DB 2 35 Y 28 18 P
DB 2 37 Y 24 15 P
DB 2 39 Y 29 23 P
DB 2 40 Y 27 19 P
DB 2 41 Y 25 16 P
DB 2 42 Y 25 18 P
DB 2 43 Y 26 17 P
DB 2 44 Y 28 18 P
DB 2 45 Y 32 25 P
DB 2 46 Y 28 17 P
DB 2 47 Y 28 33 P
DB 2 48 Y 25 18 P
DB 2 49 Y 25 18 P
DB 2 51 Y 28 18 P
DB 2 53 Y 28 18 P
DB 2 55 Y 28 18 P
DB 2 56 Y 24 17 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-1 1 S Y N Y F Failed battery test Y N
DB-1 2 R Y Y Y P
DB-1 3 S Y Y Y P
DB-1 4 S Y Y Y P
DB-1 5 S Y Y Y P
DB-1 6 S Y Y Y P
DB-1 7 S Y Y Y P
DB-1 8 S Y Y Y P
DB-1 9 S Y Y Y P
DB-1 10 S Y Y Y P
DB-1 19 R Y Y Y P
DB-1 11 S Y Y Y P
DB-1 12 S Y Y Y P
DB-1 13 S Y Y Y P
DB-1 14 S Y Y Y P
DB-1 15 S Y Y Y P
DB-1 16 S Y Y Y P
DB-1 17 S Y Y Y P
DB-1 18 S Y Y Y P
DB-1 19 S Y Y Y P
DB-1 20 S Y Y Y P
DB-1 21 S Y Y Y P
DB-1 22 R Y Y Y P
DB-1 23 R Y Y Y P
DB-1 24 S Y Y Y P
DB-1 25 S Y Y Y P
DB-1 26 S Y Y Y P
DB-1 27 S Y N Y F Failed battery test Y N
DB-1 28 S Y N Y F Failed battery test Y N
DB-1 29 S Y Y Y P
DB-1 30 S Y Y Y P
DB-1 31 S Y Y Y P
DB-1 32 S Y N Y F Failed battery test Y N
DB-1 33 R Y Y Y P
DB-1 34 R Y Y Y P
DB-1 35 S Y Y Y P
DB-1 36 S Y Y Y P
DB-1 37 S Y Y Y P
DB-1 38 S Y Y Y P
DB-1 39 S Y Y Y P
DB-1 40 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-1 1 Y Y Y P
DB-1 2 Y Y Y P
DB-1 3 Y Y Y P
DB-1 4 Y Y Y P
DB-1 5 Y Y Y P
DB-1 6 Y Y Y P
DB-1 7 Y Y Y P
DB-1 8 Y Y Y P
DB-1 9 Y Y Y P
DB-1 10 Y Y Y P
DB-1 11 Y Y Y P
DB-1 12 Y Y Y P
DB-1 13 Y Y Y P
DB-1 14 Y Y Y P
DB-1 15 Y Y Y P
DB-1 16 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Hi-bay lights Y
36W Twin batten lights Y
50W halogen down lights Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
TEST AND TAG STORE 80+ TEST AND TAG INDATE, NEXT TEST DUE 03 MARCH 2023 N N N OBSERVATION
EM32 UPSTAIRES LUNCHROOM 1 FAILED 90MIN DISCHARGE TEST Y N N REPLACED
RACK LED SIGN LIGHTING FRIDGES 4 NO STARTER SOCKET OR PB4 INSTALLED ON 4 × BAYS N N N OBSERVATION. ISSUE RAISED DURING RELAY. INSTALL STARTER SOCKET AND PB4S ON 4 × FRIDGE BAYS
LED RACK SIGN BRACKETS 1 FAILED TO ILLUMINATE Y N N RECONNECTED
BUNKER LIGHT EXTERNAL FRONT OF STORE RHS FROM FRONT ENTRANCE 1 FAILED TO ILLUMINATE N N N ORDER AND REPLACE FITTING, OTHER EXTERNAL BUNKERS HAVE ALREADY BEEN REPLACED WITH SE7089 BK 55W 5000K SAL. ADDED TO FORTNIGHTLY REPAIRS LIST.
70MM LED DOWNLIGHT TV AREA 3 FAILED TO ILLUMINATE Y N N REPLACED
SOLT LEDS WASHING MACHINE SOLT 1 LEDS FLASHING N N N OBSERVATION. INVESTIGATED, POWER CORRECT AT PB4 , ISSUE POSSIBLY WITH INCORRECT POWERSUPPLY OR FAULTY FITTINGS.
EM1 F AND P WASHING MACHINE 1 FAILED BATTERY TEST Y N N REPLACED
EM28 UPSTAIRES HALLWAY 1 FAILED BATTERY TEST Y N N REPLACED
EM27 TOP OF STAIRWELL 1 FAILED BATTERY TEST Y N N REPLACED
POLE FILLER SWITCHBOARD 5 MISSING Y N N REPLACED POLE FILLERS
Site Status SelectorStore now fully compliant
Next Test Due in 6 months02/03/2023