| Partner Name | Built Services |
|---|
| State | NSW |
|---|
| Date of Visit | 06/09/2022 |
|---|
| Technician's Name | Peter Tsoukarellis |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 66876 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in NSW | chatswood |
|---|
|
|
|---|
| Location Name | Chatswood |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | Biennial Test (once every two years) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| RCD Details (Biennial) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB11 |
1 |
Y |
59 |
48 |
P |
|
|
|
3 |
Y |
550 |
550 |
F |
>300ms |
N |
|
5 |
Y |
550 |
550 |
F |
>300ms |
N |
|
7 |
Y |
550 |
550 |
F |
>300ms |
N |
|
9 |
Y |
550 |
550 |
F |
>300ms |
N |
|
11 |
Y |
550 |
550 |
F |
>300ms |
N |
|
13 |
Y |
550 |
550 |
F |
>300ms |
N |
|
15 |
Y |
550 |
550 |
F |
>300ms |
N |
|
17 |
Y |
550 |
550 |
F |
>300ms |
N |
|
19 |
Y |
550 |
550 |
F |
>300ms |
N |
|
21 |
Y |
550 |
550 |
F |
>300ms |
N |
|
23 |
Y |
550 |
550 |
F |
>300ms |
N |
|
25 |
Y |
550 |
550 |
F |
>300ms |
N |
|
27 |
Y |
550 |
550 |
F |
>300ms |
N |
|
29 |
Y |
550 |
550 |
F |
>300ms |
N |
|
31 |
Y |
550 |
550 |
F |
>300ms |
N |
|
33 |
Y |
550 |
550 |
F |
>300ms |
N |
|
37 |
Y |
24 |
16 |
P |
|
|
|
39 |
Y |
550 |
550 |
F |
>300ms |
N |
|
41 |
Y |
550 |
550 |
F |
>300ms |
N |
|
43 |
Y |
550 |
550 |
F |
>300ms |
N |
|
47 |
Y |
29 |
19 |
P |
|
|
|
49 |
Y |
29 |
36 |
P |
|
|
|
51 |
Y |
25 |
35 |
P |
|
|
|
53 |
Y |
15 |
25 |
P |
|
|
|
55 |
Y |
14 |
27 |
P |
|
|
|
57 |
Y |
17 |
27 |
P |
|
|
|
59 |
Y |
19 |
29 |
P |
|
|
|
2 |
Y |
550 |
550 |
F |
>300ms |
N |
|
4 |
Y |
550 |
550 |
F |
>300ms |
N |
|
6 |
Y |
550 |
550 |
F |
>300ms |
N |
|
8 |
Y |
550 |
550 |
F |
>300ms |
N |
|
10 |
Y |
550 |
550 |
F |
>300ms |
N |
|
12 |
Y |
550 |
550 |
F |
>300ms |
N |
|
14 |
Y |
550 |
550 |
F |
>300ms |
N |
|
16 |
Y |
550 |
550 |
F |
>300ms |
N |
|
18 |
Y |
550 |
550 |
F |
>300ms |
N |
|
20 |
Y |
31 |
21 |
P |
|
|
|
22 |
Y |
550 |
550 |
F |
>300ms |
N |
|
24 |
Y |
550 |
550 |
F |
>300ms |
N |
|
26 |
Y |
550 |
550 |
F |
>300ms |
N |
|
28 |
Y |
550 |
550 |
F |
>300ms |
N |
|
30 |
Y |
550 |
550 |
F |
>300ms |
N |
|
32 |
Y |
550 |
550 |
F |
>300ms |
N |
|
34 |
Y |
550 |
550 |
F |
>300ms |
N |
|
36 |
Y |
550 |
550 |
F |
>300ms |
N |
|
38 |
Y |
550 |
550 |
F |
>300ms |
N |
|
40 |
Y |
550 |
550 |
F |
>300ms |
N |
|
42 |
Y |
550 |
550 |
F |
>300ms |
N |
|
44 |
Y |
550 |
550 |
F |
>300ms |
N |
|
46 |
Y |
550 |
550 |
F |
>300ms |
N |
|
48 |
Y |
33 |
26 |
P |
|
|
|
50 |
Y |
550 |
550 |
F |
>300ms |
N |
|
52 |
Y |
27 |
38 |
P |
|
|
|
54 |
Y |
48 |
37 |
P |
|
|
| DB 01 |
1 |
Y |
550 |
550 |
F |
>300ms |
N |
|
3 |
Y |
550 |
550 |
F |
>300ms |
N |
|
5 |
Y |
550 |
550 |
F |
>300ms |
N |
|
7 |
Y |
550 |
550 |
F |
>300ms |
N |
|
9 |
Y |
550 |
550 |
F |
>300ms |
N |
|
11 |
Y |
550 |
550 |
F |
>300ms |
N |
|
13 |
Y |
27 |
23 |
P |
|
|
|
17 |
Y |
9 |
19 |
P |
|
|
|
2 |
Y |
550 |
550 |
F |
>300ms |
N |
|
4 |
Y |
550 |
550 |
F |
>300ms |
N |
|
6 |
Y |
550 |
550 |
F |
>300ms |
N |
|
8 |
Y |
550 |
550 |
F |
>300ms |
N |
|
10 |
Y |
29 |
19 |
P |
|
|
|
12 |
Y |
550 |
550 |
F |
>300ms |
N |
|
14 |
Y |
550 |
550 |
F |
>300ms |
N |
|
16 |
Y |
550 |
550 |
F |
>300ms |
N |
|
18 |
Y |
550 |
550 |
F |
>300ms |
N |
|
28 |
Y |
550 |
550 |
F |
>300ms |
N |
| DB 02 |
10 |
Y |
9 |
19 |
P |
|
|
|
13 |
Y |
9 |
19 |
P |
|
|
|
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB1 |
EM1 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM2 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM3 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM4 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM5 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM6 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM7 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM8 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM9 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM10 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM11 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM8a |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM9a |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM10a |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM11a |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM12a |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM13a |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM14a |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM15a |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM16a |
R |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB1 |
EX1 |
Y |
N |
Y |
F |
Failed 90 Min Test |
Y |
N |
| DB1 |
EX2 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EX3 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EX4 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EX5 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EX6 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EX7 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EX8 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EX12 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EX16 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| High Bays Halo Globe |
Y |
| 2 x 8W Fluoro |
Y |
| 50mm LED Downlight |
Y |
| 1200mm Fluoro Troffer |
Y |
| Fluorescent T5 Fluoro Pelmet Lights |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| RCBO |
DB11 |
42 |
Does not trip |
N |
TBA |
TBA |
Need to be replaced. Added to fortnightly repairs list. |
| RCBO |
DB01 |
15 |
Does not trip |
N |
TBA |
TBA |
Need to be replaced. Added to fortnightly repairs list. |
| Exit Light #1 |
Main entrance |
1 |
Failed 90 Min Test |
Y |
N |
N |
Replaced with new. |
| Fluro Light |
Mobile plans sign |
1 |
Faulty |
N |
TBA |
TBA |
Recommend replacing with 5x 900mm linkables. Added to fortnightly repairs list. |
| Fluro Light |
Action / DSLR cameras sign |
1 |
Faulty |
N |
TBA |
TBA |
Recommend replacing with 5x 900mm linkables. Added to fortnightly repairs list. |
| Fluro Light |
Bluetooth speakers sign |
1 |
Faulty |
N |
TBA |
TBA |
Recommend replacing with 5x 900mm linkables. Added to fortnightly repairs list. |
| Fluro Light |
Side by side fridges sign |
1 |
Faulty |
N |
TBA |
TBA |
Recommend replacing with 5x 900mm linkables. Added to fortnightly repairs list. |
| Fluro Light |
Ice & water fridges sign |
1 |
Faulty |
N |
TBA |
TBA |
Recommend replacing with 5x 900mm linkables. Added to fortnightly repairs list. |
| Fluro Light |
Heating & cooling sign |
1 |
Faulty |
N |
TBA |
TBA |
Recommend replacing with 3x 900mm linkables. Added to fortnightly repairs list. |
| Emergency Lights |
Warehouse |
N/A |
No emergency lights in the warehouse. |
N |
N |
N |
Observation only. |
| Emergency Lights |
Shop Floor |
4 |
Recommend replacing with double fittings |
N |
N |
N |
Observation only. |
| Emergency Lighting Plan |
Maintenance Folder |
1 |
Not accurate |
N |
N |
N |
To be updated during next audit. |
|
|---|
| Site Status Selector | Completed but with repairs required |
|---|
| Next Test Due in 6 months | 06/03/2023 |
|---|
| |
|---|
| |