Partner NameSturdie Trade Services
StateVIC
Date of Visit21/09/2022
Technician's NameNathan McBain
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number67212
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICnunawading

Location NameNunawading
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB-7/2 12 Y 32 32 P
DB-7/2 14 Y 33 34 P
DB-7/2 16 Y 33 31 P
DB-7/2 18 Y 33 33 P
DB-7/2 20 Y 32 34 P
DB-7/2 22 Y 31 32 P
DB-7/2 24 Y 32 32 P
DB-7/2 26 Y 32 33 P
DB-7/2 28 Y 33 29 P
DB-7/2 30 Y 33 39 P
DB-7/2 32 Y 40 33 P
DB-7/2 34 Y 37 33 P
DB-7/2 36 Y 40 33 P
DB-7/2 38 Y 33 40 P
DB-7/2 40 Y 31 31 P
DB-7/2 42 Y 32 33 P
DB-7/2 44 Y 32 32 P
DB-7/2 46 Y 31 32 P
DB-7/2 48 Y 32 32 P
DB-7/2 54 Y 29 30 P
DB-7/2 56 Y 29 31 P
DB-7/2 58 Y 32 33 P
DB-7/2 60 Y 32 32 P
DB-7/2 62 Y 31 36 P
DB-7/2 64 Y 31 31 P
DB-7/2 66 Y 31 30 P
DB-7/2 68 Y 32 32 P
DB-7/4 1 Y 33 38 P
DB-7/4 3 Y 32 37 P
DB-7/4 5 Y 32 30 P
DB-7/4 7 Y 31 31 P
DB-7/4 9 Y 29 30 P
DB-7/4 10 Y 31 33 P
DB-7/4 11 Y 37 35 P
DB-7/4 12 Y 38 37 P
DB-7/4 13 Y 32 41 P
DB-7/4 14 Y 32 31 P
DB-7/4 15 Y 32 40 P
DB-7/4 16 Y 37 37 P
DB-7/4 17 Y 32 32 P
DB-7/4 18 Y 31 33 P
DB-7/4 19 Y 32 33 P
DB-7/4 21 Y 31 31 P
DB-7/4 22 Y 30 37 P
DB-7/4 23 Y 31 30 P
DB-7/4 24 Y 29 36 P
DB-7/4 29 Y 28 21 P
DB-7/4 32 Y 31 32 P
DB-7/4 33 Y 29 31 P
DB-7/4 34 Y 38 41 P
DB-7/4 35 Y 31 31 P
DB-7/4 36 Y 33 34 P
DB-7/4 37 Y 33 33 P
DB-7/4 38 Y 37 39 P
DB-7/4 39 Y 30 38 P
DB-7/4 40 Y 41 39 P
DB-7/4 41 Y 28 21 P
DB-7/4 42 Y 35 35 P
DB-7/4 43 Y 32 39 P
DB-7/4 44 Y 33 32 P
DB-7/1 4 Y 29 37 P
DB-7/1 6 Y 29 37 P
DB-7/1 8 Y 33 31 P
DB-7/1 10 Y 32 32 P
DB-7/1 12 Y 33 31 P
DB-7/1 14 Y 33 34 P
DB-7/1 16 Y 29 37 P
DB-7/1 22 Y 47 32 P
DB-7/1 24 Y 31 31 P
DB-7/1 25 Y 30 37 P
DB-7/1 26 Y 38 32 P
DB-7/1 28 Y 31 30 P
DB-7/1 30 Y 40 33 P
DB-7/1 31 Y 29 18 P
DB-7/1 32 Y 31 31 P
DB-7/1 33 Y 09 18 P
DB-7/1 34 Y 31 31 P
DB-7/1 35 Y 09 18 P
DB-7/1 36 Y 28 21 P
DB-7/1 44 Y 19 17 P
DB-7/1 46 Y 07 17 P
DB-7/1 48 Y 07 17 P
DB-7/1 50 Y 31 31 P
DB-7/1 52 Y 37 32 P
DB-7/1 54 Y 30 30 P
DB-7/1 56 Y 29 39 P
DB-7/1 58 Y 33 32 P
DB-7/1 60 Y 32 33 P
DB-7/1 62 Y 31 39 P
DB-7/1 64 Y 30 31 P
DB-7/1 66 Y 31 31 P
DB-7/1 68 Y 31 40 P
DB-7/1 70 Y 32 33 P
DB-7/1 72 Y 33 32 P
DB-7/3 1 Y 33 31 P
DB-7/3 3 Y 33 33 P
DB-7/3 5 Y 37 39 P
DB-7/3 7 Y 33 38 P
DB-7/3 9 Y 32 32 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-7/2 2 S Y Y Y P
3 S Y Y Y P
4 S Y Y Y P
7 S Y Y Y P
8 S Y Y Y P
9 S Y Y Y P
11 S Y Y Y P
12 S Y Y Y P
14 S Y Y Y P
DB-7/1 15 S Y Y Y P
19 S Y Y Y P
21 S Y Y Y P
22 S Y Y Y P
23 S Y Y Y P
25 S Y Y Y P
26 S Y Y Y P
27 S Y Y Y P
DB-7/4 29 R Y Y Y P
30 R Y Y Y P
31 R Y Y Y P
32 R Y Y Y P
34 R Y Y Y P
DB-7/1 38 S Y Y Y P
DB-7/4 41 S Y Y Y P
43 R Y Y Y P
45 R Y Y Y P
46 R Y Y Y P
47 R Y Y Y P
48 R Y Y Y P
DB-7/3 50 S Y Y Y P
51 S Y Y Y P
53 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-7/2 1 Y Y Y P
5 Y Y Y P
6 Y Y Y P
10 Y Y Y P
13 Y Y Y P
16 Y Y Y P
DB-7/1 17 Y Y Y P
20 Y Y Y P
24 Y Y Y P
DB-7/4 28 Y Y Y P
DB-7/1 33 Y Y Y P
35 Y Y Y P
36 Y Y Y P
37 Y Y Y P
39 Y Y Y P
DB-7/4 40 Y Y Y P
42 Y Y Y P
44 Y Y Y P
DB-7/3 49 Y Y Y P
52 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
LED Hi-Bay lights Y
Double diffused 36W fluorescent lights Y
Single diffused 36W fluorescent lights Y
Double bare 36W fluorescent lights Y
Single bare 36W fluorescent lights Y
70mm downlights Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
MIXED EMERGENCY/GL CIRCUIT DB-7/3 BASEMENT STOREROOM 3 × EMERGENCY AND 2 × EXIT DUE TO MIXED CIRUITS UNSAFE TO TURN ALL LIGHTING OFF TO TEST EMERGENCY LIGHTS N TBA TBA RE-ATTENDED TO TEST EMERGENCY LIGHTS. NO TEST UNIT INSTALLED. QUOTE TO REWIRE EMERGENCYS ON OWN CIRCUIT, SPARE RCBO CBI SF1EL 20A IN SWITCHBOARD. ALL WORK SURFACEWORK, CEILING HEIGHT 3480MM.ADDED TO FORTNIGHTLY REPAIRS LIST.
38W/840 CAGED BATTEN STAIRS TO EXIT DOOR,BETWEEN LIFT AND DB 1 FITTING FAILED TO ILLUMINATE N Y N REPLACE WITH LED BATTEN, DAVIS LED BATTENS EXISTING IN STORE ROOM. REPLACE BEFORE TRADE DUE TO ALL LIGHTS NEEDING TO BE ISOLATED. ADDED TO FORTNIGHTLY REPAIRS LIST.
TEST AND TAG STORE 80+ TEST AND TAG IN-DATE, NEXT TEST DUE 07 MARCH 2023 N N N OBSERVATION
RACK LIGHT BOX FRIDGES 1 RACK FAILED TO ILLUMINATE Y N N
KINSMAN PENDANT LIGHTS KINSMAN 2 GLOBES FAILED TO ILLUMINATE Y N N
RACK LIGHT BOX FLOOR CARE 2 RACK FAILED TO ILLUMINATE Y N N
Site Status SelectorStore now fully compliant
Next Test Due in 6 months21/03/2023