Carry out push button test and record the results below.
RCD Details (Biennial)
Distribution Board No.
Circuit No.
Push Button (YorN)
0 Degrees
180 Degrees
Pass / Fail (PorF)
Fault?
Repaired on Site (YorN)
DB-7/2
12
Y
32
32
P
DB-7/2
14
Y
33
34
P
DB-7/2
16
Y
33
31
P
DB-7/2
18
Y
33
33
P
DB-7/2
20
Y
32
34
P
DB-7/2
22
Y
31
32
P
DB-7/2
24
Y
32
32
P
DB-7/2
26
Y
32
33
P
DB-7/2
28
Y
33
29
P
DB-7/2
30
Y
33
39
P
DB-7/2
32
Y
40
33
P
DB-7/2
34
Y
37
33
P
DB-7/2
36
Y
40
33
P
DB-7/2
38
Y
33
40
P
DB-7/2
40
Y
31
31
P
DB-7/2
42
Y
32
33
P
DB-7/2
44
Y
32
32
P
DB-7/2
46
Y
31
32
P
DB-7/2
48
Y
32
32
P
DB-7/2
54
Y
29
30
P
DB-7/2
56
Y
29
31
P
DB-7/2
58
Y
32
33
P
DB-7/2
60
Y
32
32
P
DB-7/2
62
Y
31
36
P
DB-7/2
64
Y
31
31
P
DB-7/2
66
Y
31
30
P
DB-7/2
68
Y
32
32
P
DB-7/4
1
Y
33
38
P
DB-7/4
3
Y
32
37
P
DB-7/4
5
Y
32
30
P
DB-7/4
7
Y
31
31
P
DB-7/4
9
Y
29
30
P
DB-7/4
10
Y
31
33
P
DB-7/4
11
Y
37
35
P
DB-7/4
12
Y
38
37
P
DB-7/4
13
Y
32
41
P
DB-7/4
14
Y
32
31
P
DB-7/4
15
Y
32
40
P
DB-7/4
16
Y
37
37
P
DB-7/4
17
Y
32
32
P
DB-7/4
18
Y
31
33
P
DB-7/4
19
Y
32
33
P
DB-7/4
21
Y
31
31
P
DB-7/4
22
Y
30
37
P
DB-7/4
23
Y
31
30
P
DB-7/4
24
Y
29
36
P
DB-7/4
29
Y
28
21
P
DB-7/4
32
Y
31
32
P
DB-7/4
33
Y
29
31
P
DB-7/4
34
Y
38
41
P
DB-7/4
35
Y
31
31
P
DB-7/4
36
Y
33
34
P
DB-7/4
37
Y
33
33
P
DB-7/4
38
Y
37
39
P
DB-7/4
39
Y
30
38
P
DB-7/4
40
Y
41
39
P
DB-7/4
41
Y
28
21
P
DB-7/4
42
Y
35
35
P
DB-7/4
43
Y
32
39
P
DB-7/4
44
Y
33
32
P
DB-7/1
4
Y
29
37
P
DB-7/1
6
Y
29
37
P
DB-7/1
8
Y
33
31
P
DB-7/1
10
Y
32
32
P
DB-7/1
12
Y
33
31
P
DB-7/1
14
Y
33
34
P
DB-7/1
16
Y
29
37
P
DB-7/1
22
Y
47
32
P
DB-7/1
24
Y
31
31
P
DB-7/1
25
Y
30
37
P
DB-7/1
26
Y
38
32
P
DB-7/1
28
Y
31
30
P
DB-7/1
30
Y
40
33
P
DB-7/1
31
Y
29
18
P
DB-7/1
32
Y
31
31
P
DB-7/1
33
Y
09
18
P
DB-7/1
34
Y
31
31
P
DB-7/1
35
Y
09
18
P
DB-7/1
36
Y
28
21
P
DB-7/1
44
Y
19
17
P
DB-7/1
46
Y
07
17
P
DB-7/1
48
Y
07
17
P
DB-7/1
50
Y
31
31
P
DB-7/1
52
Y
37
32
P
DB-7/1
54
Y
30
30
P
DB-7/1
56
Y
29
39
P
DB-7/1
58
Y
33
32
P
DB-7/1
60
Y
32
33
P
DB-7/1
62
Y
31
39
P
DB-7/1
64
Y
30
31
P
DB-7/1
66
Y
31
31
P
DB-7/1
68
Y
31
40
P
DB-7/1
70
Y
32
33
P
DB-7/1
72
Y
33
32
P
DB-7/3
1
Y
33
31
P
DB-7/3
3
Y
33
33
P
DB-7/3
5
Y
37
39
P
DB-7/3
7
Y
33
38
P
DB-7/3
9
Y
32
32
P
THERMOGRAPHIC TEST RESULTS
THERMOGRAPHIC TEST RESULTS
SF43 Exit/Emergency
SF43 EXIT/EMERGENCY LIGHTING
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
Check timers for correct operation and timing
Switched Socket Outlets
Carry out visual check on SSOs for signs of misuse, blackening or deterioration
Check and report any outlets with multiple power boards overloading
Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No.
ID No.
Surface mounted or recessed? (SorR)
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DB-7/2
2
S
Y
Y
Y
P
3
S
Y
Y
Y
P
4
S
Y
Y
Y
P
7
S
Y
Y
Y
P
8
S
Y
Y
Y
P
9
S
Y
Y
Y
P
11
S
Y
Y
Y
P
12
S
Y
Y
Y
P
14
S
Y
Y
Y
P
DB-7/1
15
S
Y
Y
Y
P
19
S
Y
Y
Y
P
21
S
Y
Y
Y
P
22
S
Y
Y
Y
P
23
S
Y
Y
Y
P
25
S
Y
Y
Y
P
26
S
Y
Y
Y
P
27
S
Y
Y
Y
P
DB-7/4
29
R
Y
Y
Y
P
30
R
Y
Y
Y
P
31
R
Y
Y
Y
P
32
R
Y
Y
Y
P
34
R
Y
Y
Y
P
DB-7/1
38
S
Y
Y
Y
P
DB-7/4
41
S
Y
Y
Y
P
43
R
Y
Y
Y
P
45
R
Y
Y
Y
P
46
R
Y
Y
Y
P
47
R
Y
Y
Y
P
48
R
Y
Y
Y
P
DB-7/3
50
S
Y
Y
Y
P
51
S
Y
Y
Y
P
53
R
Y
Y
Y
P
HTML Block
EXIT LIGHTS
Distribution Board No.
ID No.
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DB-7/2
1
Y
Y
Y
P
5
Y
Y
Y
P
6
Y
Y
Y
P
10
Y
Y
Y
P
13
Y
Y
Y
P
16
Y
Y
Y
P
DB-7/1
17
Y
Y
Y
P
20
Y
Y
Y
P
24
Y
Y
Y
P
DB-7/4
28
Y
Y
Y
P
DB-7/1
33
Y
Y
Y
P
35
Y
Y
Y
P
36
Y
Y
Y
P
37
Y
Y
Y
P
39
Y
Y
Y
P
DB-7/4
40
Y
Y
Y
P
42
Y
Y
Y
P
44
Y
Y
Y
P
DB-7/3
49
Y
Y
Y
P
52
Y
Y
Y
P
SF44 General Lighting & Works
SF44 GENERAL LIGHTING & WORKS
General Checklist
Check correct operation of all luminaries
Report on any faulty luminaries/control gear
Provide costing to repair/replace
HTML Block
General Operation/Additional items
Check with Store Manager to ensure there are no other issues
Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au
Yes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten)
Existing (YorN)
LED Hi-Bay lights
Y
Double diffused 36W fluorescent lights
Y
Single diffused 36W fluorescent lights
Y
Double bare 36W fluorescent lights
Y
Single bare 36W fluorescent lights
Y
70mm downlights
Y
Are there any Warranty items needing to be repaired?
No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
MIXED EMERGENCY/GL CIRCUIT
DB-7/3 BASEMENT STOREROOM
3 × EMERGENCY AND 2 × EXIT
DUE TO MIXED CIRUITS UNSAFE TO TURN ALL LIGHTING OFF TO TEST EMERGENCY LIGHTS
N
TBA
TBA
RE-ATTENDED TO TEST EMERGENCY LIGHTS. NO TEST UNIT INSTALLED. QUOTE TO REWIRE EMERGENCYS ON OWN CIRCUIT, SPARE RCBO CBI SF1EL 20A IN SWITCHBOARD. ALL WORK SURFACEWORK, CEILING HEIGHT 3480MM.ADDED TO FORTNIGHTLY REPAIRS LIST.
38W/840 CAGED BATTEN
STAIRS TO EXIT DOOR,BETWEEN LIFT AND DB
1 FITTING
FAILED TO ILLUMINATE
N
Y
N
REPLACE WITH LED BATTEN, DAVIS LED BATTENS EXISTING IN STORE ROOM. REPLACE BEFORE TRADE DUE TO ALL LIGHTS NEEDING TO BE ISOLATED. ADDED TO FORTNIGHTLY REPAIRS LIST.
TEST AND TAG
STORE
80+
TEST AND TAG IN-DATE, NEXT TEST DUE 07 MARCH 2023
N
N
N
OBSERVATION
RACK LIGHT BOX
FRIDGES
1 RACK
FAILED TO ILLUMINATE
Y
N
N
KINSMAN PENDANT LIGHTS
KINSMAN
2 GLOBES
FAILED TO ILLUMINATE
Y
N
N
RACK LIGHT BOX
FLOOR CARE
2 RACK
FAILED TO ILLUMINATE
Y
N
N
Site Status Selector
Store now fully compliant
Next Test Due in 6 months
21/03/2023
The Built Services Group seeks to apply innovation and technology for greater client services, business efficiencies and thinking Green.