StateACT
Date of Visit21/09/2022
Technician's NameWill Andrews
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number67327
EmailEmail hidden; Javascript is required.
The Good Guys Site in ACTbelconnen

Location NameBelconnen
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB2 4 Y 32 28 P
5 Y 35 28 P
6 Y 32 26 P
7 Y 37 31 P
8 Y 38 34 P
9 Y 28 28 P
10 Y 34 33 P
11 Y 34 28 P
12 Y 29 28 P
13 Y 32 30 P
14 Y 32 34 P
15 Y 37 37 P
16 Y 40 38 P
17 Y 37 28 P
18 Y 29 29 P
19 Y 30 30 P
20 Y 34 33 P
21 Y 35 33 P
23 Y 36 27 P
24 Y 29 26 P
Sub Board 3 1 Y 39 38 P
2 Y 36 29 P
4 Y 33 33 P
6 Y 39 35 P
7 Y 36 36 P
8 Y 37 28 P
9 Y 30 34 P
10 Y 36 36 P
11 Y 40 38 P
12 Y 42 34 P
13 Y 34 29 P
15 Y 36 32 P
19 Y 38 38 P
Distribution Board 1 1 Y 28 26 P
2 Y 32 28 P
3 Y 34 34 P
4 Y 37 33 P
5 Y 37 36 P
6 Y 31 29 P
7 Y 33 28 P
8 Y 28 29 P
9 Y 39 39 P
10 Y 40 37 P
11 Y 41 39 P
12 Y 37 34 P
13 Y 42 40 P
14 Y 40 40 P
15 Y 37 36 P
16 Y 34 28 P
17 Y 37 36 P
18 Y 34 29 P
19 Y 39 34 P
21 Y 41 35 P
22 Y 33 28 P
23 Y 32 27 P
25 Y 34 32 P
26 Y 40 40 P
27 Y 42 32 P
28 Y 29 29 P
29 Y 37 37 P
30 Y 38 34 P
31 Y 34 33 P
32 Y 29 26 P
33 Y 32 28 P
34 Y 38 31 P
35 Y 32 31 P
36 Y 34 26 P
42 Y 36 33 P
43 Y 39 39 P
44 Y 40 37 P
45 Y 41 41 P
46 Y 34 29 P
47 Y 37 34 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB2 L1-24 R Y Y Y P
DB2 L1-22 R Y Y Y P
Db2 L1-20 R Y Y Y P
Db2 L1-19 R Y Y Y P
Db2 L1-21 R N N N F Failed 90 min test Y N
Sub Board 3 L1-1 S Y Y Y P
5 S (2x36w em batten) N N N F Failed 90 min test Y N
3 R Y Y Y P
2 R Y Y Y P
1 R Y Y Y P
Db1 9 S Y Y Y P
Db1 8 S Y Y Y P
Db1 6 S Y Y Y P
Db1 7 S Y Y Y P
Db1 15 S Y Y Y P
Db1 16 S Y Y Y P
Db1 14 S Y Y Y P
Db1 G15 S Y Y Y P
Db1 14 S Y Y Y P
Db1 13 S Y Y Y P
Db1 12 S Y Y Y P
10 S Y Y Y P
11 S Y Y Y P
Db1 G20 Fluro (s) N N N F Failed 90 min test Y N
Db1 18 R Y Y Y P
Db1 21 Fluro (s) Y Y Y P
Db1 22 Fluro (s) Y Y Y P
Db1 20 Fluro (s) Y Y Y P
Db1 19 Fluro (s) Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB2 1 Y Y Y P
DB2 2 Y Y Y P
Sub Board 3 3 Y Y Y P
18 Y Y Y P
4 Y Y Y P
5 Y Y Y P
Db1 9 Y Y Y P
Db1 10 Y Y Y P
Db3 8 Y Y Y P
Db3 7 Y Y Y P
Db3 6 N N N F Failed 90 min test Y N
Db1 5 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
1x36 bare battens Y
2 x 36w bare and diffused battens Y
2 x 18w proffer lights Y
2 x36 troffers Y
2x 28w troffers Y
90mm led downlights Y
Rectangular metal halide shop lighters Y
400w external flood lights Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Emergency Light (R) L1-21 1 Failed 90 min test Y N N
Emergency Batten 5 1 Failed 90 min test Y N N
Emergency (S) G20 1 Failed 90 min test Y N N
Exit Light 6 1 Failed 90 min test Y N N
Light Boxes Throughout Store 31 All Boxes are out and power continuously trips as all these light boxes are faulty N N TBA Replace all tubes in light boxes with 11w LED Linkable Lights, added to fortnightly repairs report.
Satellite Counter Top Mezzanine 1 Has been shifted forward and as such the dropper power has been dislodged and is hanging and needs to be secured and straightened N N TBA Straighten and repair dropper power to Sat counter, added to fortnightly repairs report.
Site Status SelectorStore now fully compliant
Next Test Due in 6 months23/03/2023