| Partner Name | Built Electrical QLD |
|---|
| State | QLD |
|---|
| Date of Visit | 28/09/2022 |
|---|
| Technician's Name | Gregory Jones |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 67441 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in QLD | kawana_waters_warehouse |
|---|
|
|
|---|
| Location Name | Kawana Waters Warehouse |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | Biennial Test (once every two years) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| RCD Details (Biennial) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| Db1 |
1 |
Y |
17 |
20 |
P |
|
|
| Db1a |
L1 |
Y |
22 |
17 |
P |
|
|
|
L2 |
Y |
22 |
16 |
P |
|
|
|
L3 |
Y |
22 |
12 |
P |
|
|
|
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| Db1 |
1 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | No |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| Hi Bays |
Y |
| 2 x 36W Troffers |
Y |
| Dux Clipper |
Y |
| 1 x 36W Bare Batten Emergency |
Y |
| 2 x 36W Diffused Emergency |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| Switchboard legend |
Warehouse |
1 |
No switchboard legend |
N |
N |
N |
Added onto fortnightly repair list. |
| Emergency test facility |
Warehouse |
1 |
No emergency test facility |
N |
N |
N |
Added onto fortnightly repair list. |
| Emergency plan |
Warehouse |
1 |
No emergency plan |
N |
N |
N |
Added onto fortnightly repair list. |
| Emergency lights not connected |
Warehouse |
3 |
No power to lights as per last epm |
N |
N |
N |
Added onto fortnightly repair list. |
| Led highbay |
Warehouse |
1 |
Led highbay not working scissor required |
N |
N |
N |
Access equipment required. As per Lauren monitor until next EPM . |
|
|---|
| Site Status Selector | Completed but with repairs required |
|---|
| Next Test Due in 6 months | 28/03/2023 |
|---|
| |
|---|
| |