Partner Name | Built Services |
---|
State | SA |
---|
Date of Visit | 29/09/2022 |
---|
Technician's Name | Antonio Portolesi |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 67288 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in SA | noarlunga |
---|
|
|
---|
Location Name | Noarlunga |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB SHOP |
W3 |
Y |
29 |
20 |
P |
|
|
DB SHOP |
B5 |
Y |
31 |
29 |
P |
|
|
DB SHOP |
R7 |
Y |
29 |
20 |
P |
|
|
DB SHOP |
W9 |
Y |
29 |
19 |
P |
|
|
DB SHOP |
B11 |
Y |
29 |
19 |
P |
|
|
DB SHOP |
R13 |
Y |
29 |
19 |
P |
|
|
DB SHOP |
W15 |
Y |
29 |
19 |
P |
|
|
DB SHOP |
B17 |
Y |
30 |
20 |
P |
|
|
DB SHOP |
R19 |
Y |
31 |
21 |
P |
|
|
DB SHOP |
W21 |
Y |
28 |
18 |
P |
|
|
DB SHOP |
B23 |
Y |
31 |
21 |
P |
|
|
DB SHOP |
R25 |
Y |
30 |
21 |
P |
|
|
DB SHOP |
W27 |
Y |
31 |
21 |
P |
|
|
DB SHOP |
B29 |
Y |
31 |
21 |
P |
|
|
DB SHOP |
R31 |
Y |
31 |
21 |
P |
|
|
DB SHOP |
W33 |
Y |
29 |
19 |
P |
|
|
DB SHOP |
B35 |
Y |
30 |
20 |
P |
|
|
DB SHOP |
R37 |
Y |
31 |
21 |
P |
|
|
DB SHOP |
W39 |
Y |
26 |
16 |
P |
|
|
DB SHOP |
B41 |
Y |
27 |
15 |
P |
|
|
DB SHOP |
R43 |
Y |
28 |
18 |
P |
|
|
DB SHOP |
B47 |
Y |
29 |
20 |
P |
|
|
DB SHOP |
R49 |
Y |
29 |
20 |
P |
|
|
DB SHOP |
W10 |
Y |
29 |
19 |
P |
|
|
DB SHOP |
B12 |
Y |
24 |
14 |
P |
|
|
DB SHOP |
R14 |
Y |
30 |
20 |
P |
|
|
DB SHOP |
W16 |
Y |
29 |
19 |
P |
|
|
DB SHOP |
B18 |
Y |
30 |
20 |
P |
|
|
DB SHOP |
W22 |
Y |
24 |
14 |
P |
|
|
DB SHOP |
B24 |
Y |
30 |
20 |
P |
|
|
DB SHOP |
R26 |
Y |
31 |
21 |
P |
|
|
DB SHOP |
B30 |
Y |
26 |
16 |
P |
|
|
DB SHOP |
R32 |
Y |
23 |
13 |
P |
|
|
DB SHOP |
B36 |
Y |
29 |
19 |
P |
|
|
DB SHOP |
R38 |
Y |
29 |
19 |
P |
|
|
DB SHOP |
W40 |
Y |
28 |
20 |
P |
|
|
DB SHOP |
B42 |
Y |
23 |
18 |
P |
|
|
DB SHOP |
R44 |
Y |
29 |
19 |
P |
|
|
DB SHOP |
B48 |
Y |
29 |
19 |
P |
|
|
DB SHOP |
R50 |
Y |
34 |
22 |
P |
|
|
DB SHOP |
W52 |
Y |
31 |
21 |
P |
|
|
DB SHOP |
B54 |
Y |
29 |
21 |
P |
|
|
DB SHOP |
R56 |
Y |
31 |
19 |
P |
|
|
DB SHOP |
B60 |
Y |
29 |
21 |
P |
|
|
DB SHOP |
R62 |
Y |
31 |
16 |
P |
|
|
DB SHOP |
W64 |
Y |
26 |
14 |
P |
|
|
DB SHOP |
B66 |
Y |
23 |
14 |
P |
|
|
DB SHOP |
R68 |
Y |
24 |
14 |
P |
|
|
DB SHOP |
W70 |
Y |
28 |
19 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
MSB |
1 |
R |
Y |
Y |
Y |
P |
|
|
|
MSB |
2 |
R |
Y |
Y |
Y |
P |
|
|
|
MSB |
3 |
R |
Y |
Y |
Y |
P |
|
|
|
MSB |
4 |
R |
Y |
Y |
Y |
P |
|
|
|
MSB |
5 |
R |
Y |
Y |
Y |
P |
|
|
|
MSB |
6 |
R |
Y |
Y |
Y |
P |
|
|
|
MSB |
11 |
R |
Y |
Y |
Y |
P |
|
|
|
MSB |
12 |
S |
Y |
Y |
Y |
P |
|
|
|
MSB |
13 |
R |
Y |
Y |
Y |
P |
|
|
|
MSB |
14 |
R |
Y |
Y |
Y |
P |
|
|
|
MSB |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
MSB |
16 |
R |
Y |
Y |
Y |
P |
|
|
|
MSB |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
MSB |
7 |
Y |
Y |
Y |
P |
|
|
|
MSB |
8 |
Y |
Y |
Y |
P |
|
|
|
MSB |
9 |
Y |
Y |
Y |
P |
|
|
|
MSB |
10 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
1200mm LED surface mount double batten |
Y |
Linkables |
Y |
90mm Downlights |
Y |
Single batten 36w fluorescent |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 29/03/2023 |
---|
| |
---|
| |