Partner NameSturdie Trade Services
StateVIC
Date of Visit30/09/2022
Technician's NameNathan McBain
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number67215
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICSpringvale

Location NameSpringvale
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB-1 13 Y 27 17 P
DB-1 15 Y 28 19 P
DB-1 16 Y 28 18 P
DB-1 17 Y 28 18 P
DB-1 18 Y 24 18 P
DB-1 19 Y 28 23 P
DB-1 20 Y 28 19 P
DB-1 26 Y 28 18 P
DB-1 28 Y 28 18 P
DB-1 30 Y 26 18 P
DB-1 31 Y 29 19 P
DB-1 32 Y 29 19 P
DB-1 33 Y 29 19 P
DB-1 34 Y 29 19 P
DB-1 36 Y 28 18 P
DB-1 49 Y 26 17 P
DB-1 50 Y 30 17 P
DB-1 51 Y 25 17 P
DB-1 52 Y 25 18 P
DB-1 53 Y 25 17 P
DB-1 54 Y 25 17 P
DB-2 04 Y 28 38 P
DB-2 08 Y 28 38 P
DB-2 09 Y 28 38 P
DB-2 10 Y 28 38 P
DB-2 11 Y 28 39 P
DB-2 12 Y 28 38 P
DB-2 13 Y 28 38 P
DB-2 14 Y 28 38 P
DB-2 15 Y 29 20 P
DB-2 16 Y 28 38 P
DB-2 17 Y 28 38 P
DB-2 18 Y 28 20 P
DB-2 19 Y 28 19 P
DB-2 20 Y 28 38 P
DB-2 21 Y 28 38 P
DB-2 22 Y 28 38 P
DB-2 23 Y 28 38 P
DB-2 24 Y 28 20 P
DB-2 25 Y 28 38 P
DB-2 28 Y 28 38 P
DB-2 29 Y 28 38 P
DB-2 30 Y 28 38 P
DB-2 31 Y 28 38 P
DB-2 32 Y 28 38 P
DB-2 33 Y 28 38 P
DB-2 34 Y 28 38 P
DB-2 35 Y 28 38 P
DB-2 40 Y 28 38 P
DB-2 41 Y 28 20 P
DB-2 42 Y 28 38 P
DB-2 43 Y 28 19 P
DB-2 44 Y 28 38 P
DB-2 45 Y 28 38 P
DB-2 46 Y 28 19 P
DB-2 47 Y 28 20 P
DB-2 48 Y 28 20 P
DB-2 49 Y 28 19 P
DB-2 50 Y 28 38 P
DB-2 51 Y 28 38 P
DB-2 52 Y 28 38 P
DB-2 53 Y 28 38 P
DB-2 54 Y 28 38 P
DB-2 55 Y 28 38 P
DB-2 56 Y 29 39 P
DB-2 57 Y 28 38 P
DB-2 58 Y 28 20 P
DB-2 59 Y 28 38 P
DB-2 60 Y 28 38 P
DB-2 61 Y 31 40 P
DB-2 64 Y 28 19 P
DB-2 65 Y 28 38 P
DB-2 66 Y 28 38 P
DB-2 67 Y 28 38 P
DB-2 68 Y 28 19 P
DB-2 69 Y 28 38 P
DB-2 70 Y 28 38 P
DB-2 71 Y 28 38 P
DB-2 73 Y 28 38 P
DB-2 74 Y 28 38 P
DB-2 75 Y 28 38 P
DB-2 76 Y 28 38 P
DB-2 77 Y 28 38 P
DB-2 78 Y 28 20 P
DB-2 79 Y 28 38 P
DB-2 80 Y 28 38 P
DB-2 81 Y 28 38 P
DB-2 82 Y 28 20 P
DB-2 83 Y 28 20 P
DB-2 84 Y 28 38 P
DB-2 85 Y 28 38 P
DB-2 86 Y 28 38 P
DB-2 87 Y 28 38 P
DB-2 88 Y 28 38 P
DB-2 89 Y 186 178 P
DB-2 90 Y 181 179 P
DB-2 91 Y 181 181 P
DB-2 95 Y 30 21 P
DB-2 96 Y 30 40 P
DB-2 97 Y 28 23 P
DB-2 98 Y 30 40 P
DB-2 99 Y 29 39 P
DB-2 100 Y 29 39 P
DB-2 101 Y 30 40 P
DB-2 102 Y 30 23 P
DB-2 103 Y 28 38 P
DB-2 104 Y 28 38 P
DB-2 109 Y 28 38 P
DB-2 110 Y 28 38 P
DB-2 111 Y 28 38 P
DB-2 112 Y 28 20 P
DB-2 113 Y 28 38 P
DB-2 114 Y 28 21 P
DB-2 115 Y 28 38 P
DB-2 116 Y 28 38 P
DB-2 117 Y 28 38 P
DB-2 118 Y 28 38 P
DB-2 119 Y 28 19 P
DB-2 120 Y 28 38 P
DB-2 121 Y 31 41 P
DB-2 122 Y 23 45 P
DB-2 123 Y 29 21 P
DB-2 124 Y 28 38 P
DB-2 125 Y 31 34 P
DB-2 126 Y 30 25 P
DB-2 127 Y 28 21 P
DB-2 128 Y 28 38 P
DB-2 129 Y 28 19 P
DB-2 130 Y 28 38 P
DB-2 131 Y 28 20 P
DB-2 132 Y 28 38 P
DB-2 133 Y 28 21 P
DB-2 134 Y 28 38 P
DB-2 135 Y 28 38 P
DB-2 136 Y 28 21 P
DB-2 137 Y 28 20 P
DB-2 138 Y 28 21 P
DB-2 139 Y 28 38 P
DB-2 140 Y 28 38 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 S Y Y Y P
2 S Y Y Y P
3 S Y Y Y P
4 S Y Y Y P
5 S Y Y Y P
6 S Y Y Y P
7 S Y Y Y P
8 S Y Y Y P
9 S Y Y Y P
10 S Y Y Y P
11 S Y Y Y P
12 S Y Y Y P
13 R Y Y Y P
14 S Y Y Y P
15 S Y Y Y P
16 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 Y Y Y P
2 Y Y Y P
3 Y Y Y P
4 Y Y Y P
5 Y Y Y P
6 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
LED DAVIS BLACK UFO HIGHBAY Y
LED PANEL LIGHT 1200 × 300 Y
Are there any Warranty items needing to be repaired?Yes
Geotag photo(s)
  • Have you sent the Geotag photo(s) to maintenance@sturdie.com.au, referring to the Store Location in the email, e.g. Canberra City?
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
DB2 LEGEND DB2 1 OLD BUILT FORMAT N N N UPDATE AND INSTALL NEW LEGENDS. UPDATE DB LEGEND. NEW LEGEND DOES NOT NEED TO BE ODDS ONE SIDE AND EVENS OTHER SIDE. DB IN ORDER 1 THROUGH TO 14. Added to fortnightly repairs list.
DB1 LEGEND DB1 1 NO LEGEND INSTALLED N N N UPDATE AND INSTALL NEW LEGEND ESCUTCHEON LABELED. Added to fortnightly repairs list.
CB66 DB2 1 CIRCUIT TRIPPED Y N N RESET CB, AMP TESTED, CB66 8A ON START UP RUNNING AT 4A. (Washing machines miele lg whirlpool, asko). NOT TRIPPING WHILE ONSITE, IF FURTHER TRIPPING CONTINUES FURTHER INVESTIGATION REQUIRED.
CB67 DB2 1 CIRCUIT TRIPPED Y N N RESET CB , 11A ON START UP , RUNNING AT 6.0A. (Freestanding fridges). IF FURTHER TRIPPING CONTINUES, FURTH INVESTIGATION REQUIRED.
TEST AND TAG STORE 80+ TEST AND TAG IN-DATE, NEXT TEST DUE 17 FEB 2023 N N N OBSERVATION
PANEL LIGHTS OFFICE 2 LED PANEL LIGHT 1200× 300 BURNT / YELLOW N N N If repairs are required, please send through work request in the New Year once blackout period is complete.
LED BLACK HIGHBAY PRINTERS 1 FAILED TO ILLUMINATE N N N If repairs are required, please send through work request in the New Year once blackout period is complete.
Site Status SelectorStore now fully compliant
Next Test Due in 6 months30/03/2023