Carry out push button test and record the results below.
RCD Details (Biennial)
Distribution Board No.
Circuit No.
Push Button (YorN)
0 Degrees
180 Degrees
Pass / Fail (PorF)
Fault?
Repaired on Site (YorN)
DB-1
13
Y
27
17
P
DB-1
15
Y
28
19
P
DB-1
16
Y
28
18
P
DB-1
17
Y
28
18
P
DB-1
18
Y
24
18
P
DB-1
19
Y
28
23
P
DB-1
20
Y
28
19
P
DB-1
26
Y
28
18
P
DB-1
28
Y
28
18
P
DB-1
30
Y
26
18
P
DB-1
31
Y
29
19
P
DB-1
32
Y
29
19
P
DB-1
33
Y
29
19
P
DB-1
34
Y
29
19
P
DB-1
36
Y
28
18
P
DB-1
49
Y
26
17
P
DB-1
50
Y
30
17
P
DB-1
51
Y
25
17
P
DB-1
52
Y
25
18
P
DB-1
53
Y
25
17
P
DB-1
54
Y
25
17
P
DB-2
04
Y
28
38
P
DB-2
08
Y
28
38
P
DB-2
09
Y
28
38
P
DB-2
10
Y
28
38
P
DB-2
11
Y
28
39
P
DB-2
12
Y
28
38
P
DB-2
13
Y
28
38
P
DB-2
14
Y
28
38
P
DB-2
15
Y
29
20
P
DB-2
16
Y
28
38
P
DB-2
17
Y
28
38
P
DB-2
18
Y
28
20
P
DB-2
19
Y
28
19
P
DB-2
20
Y
28
38
P
DB-2
21
Y
28
38
P
DB-2
22
Y
28
38
P
DB-2
23
Y
28
38
P
DB-2
24
Y
28
20
P
DB-2
25
Y
28
38
P
DB-2
28
Y
28
38
P
DB-2
29
Y
28
38
P
DB-2
30
Y
28
38
P
DB-2
31
Y
28
38
P
DB-2
32
Y
28
38
P
DB-2
33
Y
28
38
P
DB-2
34
Y
28
38
P
DB-2
35
Y
28
38
P
DB-2
40
Y
28
38
P
DB-2
41
Y
28
20
P
DB-2
42
Y
28
38
P
DB-2
43
Y
28
19
P
DB-2
44
Y
28
38
P
DB-2
45
Y
28
38
P
DB-2
46
Y
28
19
P
DB-2
47
Y
28
20
P
DB-2
48
Y
28
20
P
DB-2
49
Y
28
19
P
DB-2
50
Y
28
38
P
DB-2
51
Y
28
38
P
DB-2
52
Y
28
38
P
DB-2
53
Y
28
38
P
DB-2
54
Y
28
38
P
DB-2
55
Y
28
38
P
DB-2
56
Y
29
39
P
DB-2
57
Y
28
38
P
DB-2
58
Y
28
20
P
DB-2
59
Y
28
38
P
DB-2
60
Y
28
38
P
DB-2
61
Y
31
40
P
DB-2
64
Y
28
19
P
DB-2
65
Y
28
38
P
DB-2
66
Y
28
38
P
DB-2
67
Y
28
38
P
DB-2
68
Y
28
19
P
DB-2
69
Y
28
38
P
DB-2
70
Y
28
38
P
DB-2
71
Y
28
38
P
DB-2
73
Y
28
38
P
DB-2
74
Y
28
38
P
DB-2
75
Y
28
38
P
DB-2
76
Y
28
38
P
DB-2
77
Y
28
38
P
DB-2
78
Y
28
20
P
DB-2
79
Y
28
38
P
DB-2
80
Y
28
38
P
DB-2
81
Y
28
38
P
DB-2
82
Y
28
20
P
DB-2
83
Y
28
20
P
DB-2
84
Y
28
38
P
DB-2
85
Y
28
38
P
DB-2
86
Y
28
38
P
DB-2
87
Y
28
38
P
DB-2
88
Y
28
38
P
DB-2
89
Y
186
178
P
DB-2
90
Y
181
179
P
DB-2
91
Y
181
181
P
DB-2
95
Y
30
21
P
DB-2
96
Y
30
40
P
DB-2
97
Y
28
23
P
DB-2
98
Y
30
40
P
DB-2
99
Y
29
39
P
DB-2
100
Y
29
39
P
DB-2
101
Y
30
40
P
DB-2
102
Y
30
23
P
DB-2
103
Y
28
38
P
DB-2
104
Y
28
38
P
DB-2
109
Y
28
38
P
DB-2
110
Y
28
38
P
DB-2
111
Y
28
38
P
DB-2
112
Y
28
20
P
DB-2
113
Y
28
38
P
DB-2
114
Y
28
21
P
DB-2
115
Y
28
38
P
DB-2
116
Y
28
38
P
DB-2
117
Y
28
38
P
DB-2
118
Y
28
38
P
DB-2
119
Y
28
19
P
DB-2
120
Y
28
38
P
DB-2
121
Y
31
41
P
DB-2
122
Y
23
45
P
DB-2
123
Y
29
21
P
DB-2
124
Y
28
38
P
DB-2
125
Y
31
34
P
DB-2
126
Y
30
25
P
DB-2
127
Y
28
21
P
DB-2
128
Y
28
38
P
DB-2
129
Y
28
19
P
DB-2
130
Y
28
38
P
DB-2
131
Y
28
20
P
DB-2
132
Y
28
38
P
DB-2
133
Y
28
21
P
DB-2
134
Y
28
38
P
DB-2
135
Y
28
38
P
DB-2
136
Y
28
21
P
DB-2
137
Y
28
20
P
DB-2
138
Y
28
21
P
DB-2
139
Y
28
38
P
DB-2
140
Y
28
38
P
THERMOGRAPHIC TEST RESULTS
THERMOGRAPHIC TEST RESULTS
SF43 Exit/Emergency
SF43 EXIT/EMERGENCY LIGHTING
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
Check timers for correct operation and timing
Switched Socket Outlets
Carry out visual check on SSOs for signs of misuse, blackening or deterioration
Check and report any outlets with multiple power boards overloading
Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No.
ID No.
Surface mounted or recessed? (SorR)
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
1
S
Y
Y
Y
P
2
S
Y
Y
Y
P
3
S
Y
Y
Y
P
4
S
Y
Y
Y
P
5
S
Y
Y
Y
P
6
S
Y
Y
Y
P
7
S
Y
Y
Y
P
8
S
Y
Y
Y
P
9
S
Y
Y
Y
P
10
S
Y
Y
Y
P
11
S
Y
Y
Y
P
12
S
Y
Y
Y
P
13
R
Y
Y
Y
P
14
S
Y
Y
Y
P
15
S
Y
Y
Y
P
16
S
Y
Y
Y
P
HTML Block
EXIT LIGHTS
Distribution Board No.
ID No.
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
1
Y
Y
Y
P
2
Y
Y
Y
P
3
Y
Y
Y
P
4
Y
Y
Y
P
5
Y
Y
Y
P
6
Y
Y
Y
P
SF44 General Lighting & Works
SF44 GENERAL LIGHTING & WORKS
General Checklist
Check correct operation of all luminaries
Report on any faulty luminaries/control gear
Provide costing to repair/replace
HTML Block
General Operation/Additional items
Check with Store Manager to ensure there are no other issues
Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au
Yes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten)
Existing (YorN)
LED DAVIS BLACK UFO HIGHBAY
Y
LED PANEL LIGHT 1200 × 300
Y
Are there any Warranty items needing to be repaired?
Yes
Geotag photo(s)
Have you sent the Geotag photo(s) to maintenance@sturdie.com.au, referring to the Store Location in the email, e.g. Canberra City?
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
DB2 LEGEND
DB2
1
OLD BUILT FORMAT
N
N
N
UPDATE AND INSTALL NEW LEGENDS. UPDATE DB LEGEND. NEW LEGEND DOES NOT NEED TO BE ODDS ONE SIDE AND EVENS OTHER SIDE. DB IN ORDER 1 THROUGH TO 14. Added to fortnightly repairs list.
DB1 LEGEND
DB1
1
NO LEGEND INSTALLED
N
N
N
UPDATE AND INSTALL NEW LEGEND ESCUTCHEON LABELED. Added to fortnightly repairs list.
CB66
DB2
1
CIRCUIT TRIPPED
Y
N
N
RESET CB, AMP TESTED, CB66 8A ON START UP RUNNING AT 4A. (Washing machines miele lg whirlpool, asko). NOT TRIPPING WHILE ONSITE, IF FURTHER TRIPPING CONTINUES FURTHER INVESTIGATION REQUIRED.
CB67
DB2
1
CIRCUIT TRIPPED
Y
N
N
RESET CB , 11A ON START UP , RUNNING AT 6.0A. (Freestanding fridges). IF FURTHER TRIPPING CONTINUES, FURTH INVESTIGATION REQUIRED.
TEST AND TAG
STORE
80+
TEST AND TAG IN-DATE, NEXT TEST DUE 17 FEB 2023
N
N
N
OBSERVATION
PANEL LIGHTS
OFFICE
2
LED PANEL LIGHT 1200× 300 BURNT / YELLOW
N
N
N
If repairs are required, please send through work request in the New Year once blackout period is complete.
LED BLACK HIGHBAY
PRINTERS
1
FAILED TO ILLUMINATE
N
N
N
If repairs are required, please send through work request in the New Year once blackout period is complete.
Site Status Selector
Store now fully compliant
Next Test Due in 6 months
30/03/2023
The Built Services Group seeks to apply innovation and technology for greater client services, business efficiencies and thinking Green.