Partner NameSturdie Trade Services
StateVIC
Date of Visit05/10/2022
Technician's NameNathan McBain
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number67218
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICessendon

Location NameEssendon
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB T-01 2 Y 32 23 P
DB T-01 4 Y 26 18 P
DB T-01 6 Y 26 17 P
DB T-01 8 Y 30 22 P
DB T-01 10 Y 29 19 P
DB T-01 12 Y 28 18 P
DB T-01 14 Y 27 16 P
DB T-01 16 Y 133 21 P
DB T-01 18 Y 25 17 P
DB T-01 20 Y 24 16 P
DB T-01 22 Y 180 27 P
DB T-01 24 Y 25 16 P
DB T-01 26 Y 177 16 P
DB T-01 28 Y 29 18 P
DB T-01 30 Y 28 18 P
DB T-01 32 Y 28 18 P
DB T-01 34 Y 28 19 P
DB T-01 36 Y 25 16 P
DB T-01 38 Y 28 18 P
DB T-01 40 Y 28 18 P
DB T-01 42 Y 28 18 P
DB T-01 44 Y 28 18 P
DB T-01 46 Y 25 16 P
DB T-01 48 Y 28 18 P
DB T-01 50 Y 28 18 P
DB T-01 52 Y 28 18 P
DB T-01 54 Y 28 18 P
DB T-01 56 Y 28 18 P
DB T-01 58 Y 28 18 P
DB T-01 83 Y 28 18 P
DB T-01 84 Y 29 18 P
DB1-1 1 Y 28 38 P
DB1-1 2 Y 28 19 P
DB1-1 3 Y 29 38 P
DB1-1 4 Y 28 38 P
DB1-1 5 Y 28 18 P
DB1-1 9 Y 30 40 P
DB1-1 10 Y 30 40 P
DB1-1 11 Y 30 40 P
DB1-1 13 Y 28 18 P
DB1-1 14 Y 29 19 P
DB1-1 15 Y 28 38 P
DB1-1 16 Y 29 19 P
DB1-1 17 Y 25 17 P
DB1-1 18 Y 26 17 P
DB1-2 1 Y 29 39 P
DB1-2 2 Y 28 38 P
DB1-2 3 Y 29 39 P
DB1-2 4 Y 30 40 P
DB1-2 5 Y 25 40 P
DB1-2 6 Y 68 45 P
DB1-2 7 Y 32 38 P
DB1-2 8 Y 28 38 P
DB1-2 9 Y 29 31 P
DB1-2 10 Y 28 40 P
DB1-2 11 Y 35 45 P
DB1-2 12 Y 23 38 P
DB1-2 13 Y 22 30 P
DB1-2 14 Y 22 30 P
DB1-2 17 Y 27 31 P
DB1-2 18 Y 28 38 P
DB1-2 22 Y 25 17 P
DB1-2 23 Y 25 16 P
DB1-2 24 Y 25 18 P
DB1-2 25 Y 28 18 P
DB1-2 27 Y 28 18 P
DB1-2 29 Y 25 17 P
DB1-2 31 Y 27 18 P
DB1-2 32 Y 25 16 P
DB1-2 34 Y 25 20 P
DB1-2 36 Y 42 19 P
DB1-2 38 Y 25 17 P
DB1-2 40 Y 28 18 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-1/1 1 S Y Y Y P
DB-1/1 2 S Y Y Y P
DB-1/1 3 S Y Y Y P
DB-1/1 4 S Y Y Y P
DB-1/1 5 S Y Y Y P
DB-1/1 6 S Y Y Y P
DB-1/1 7 S Y Y Y P
DB-1/1 8 S Y Y Y P
DB-1/1 9 S Y Y Y P
DB-1/1 10 S Y Y Y P
DB-1/1 11 S Y Y Y P
DB-1/1 12 S Y Y Y P
DB-1/1 13 S Y Y Y P
DB-1/1 14 S Y Y Y P
DB-1/1 15 S Y N Y F FAILED BATTERY TEST Y N
DB-1/1 16 S Y Y Y P
DB-1/1 17 R Y Y Y P
DB-1/1 18 R Y Y Y P
DB-1/1 19 R Y Y Y P
DB-1/1 20 R Y Y Y P
DB-1/1 21 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-1/1 1 Y Y Y P
DB-1/1 2 Y Y Y P
DB-1/1 3 Y Y Y P
DB-1/1 4 Y Y Y P
DB-1/1 5 Y Y Y P
DB-1/1 6 Y Y Y P
DB-1/1 7 Y Y Y P
DB-1/1 8 Y Y Y P
DB-1/1 9 Y Y Y P
DB-1/1 10 Y Y Y P
DB-1/1 11 Y Y Y P
DB-1/1 12 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Hi-bay lights Y
Square Hi-bay lights Y
LED downlights Y
Twin fluorescent lights Y
Are there any Warranty items needing to be repaired?Yes
WARRANTY
Defect Item Location of Item (on premises) Quantity Details of fault/problem Manufacturer Part Number Repaired on Site Comments
DAVIS HIGH BAY FRIDGES CLOSER TO WALL LG SIGNATURE DISPLAY 1 FAILED TO ILLUMINATE DAVIS - N SCISSOR LIFT REQUIRED, 7.2M AFL.
DAVIS HIGH BAY STEAMERS 1 FAILED TO ILLUMIMATE DAVIS - N SCISSOR LIFT REQUIRED 8.0M AFL
DAVIS HIGH BAY FRIDGES BETWEEN 2 × LG FRIDGES END CAPS 1 INTERMITTENT FAULT ON/OFF 4 TIMES WHILE ONSITE DAVIS - N SCISSOR LIFT REQUIRED 8.0 AFL
Geotag photo(s)
  • Have you sent the Geotag photo(s) to maintenance@sturdie.com.au, referring to the Store Location in the email, e.g. Canberra City?
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
TEST AND TAG STORE 80+ TEST AND TAG IN-DATE , NEXT TEST DUE 29 MARCH 2023 N N N OBSERVATION
DISPLAY LIGHTING VIALI KITCHEN WALL DISPLAY 3 FAILED TO ILLUMINATE Y N N
LED GLOBE KINSMAN 2 FAILED TO ILLUMINATE Y N N
DISPLAY LIGHTING TECHNIKA 1 FAILED TO ILLUMINATE Y N N REPLACE WITH TRI COLOUR SAL LED LINKABLE
EM15 AIRLOCK 1 FAILED BATT TEST Y N N
EXTERNAL TGG ILLUMINATED SIGN/LETTERS EXTERNAL FRONT 1 MAJORITY OF LETTERS FAILED TO ILLUMINATE N TBA TBA EWP REQUIRED TO ACCESS SIGN TO INVESTIGATE INTERNAL TO DETERMIN WHAT IS FAULTY. ALL WORK WOULD NEED TO BE DONE BEFORE TRADE DUE TO WORKING AT FRONT ENTRANCE. 9.0M TO BOTTOM OF SIGN. ADDED TO FORTNIGHTLY REPAIRS LIST.
CLIPSAL 56 SERIES EXTERNAL WEATHERPROFF 10A GPO EXTERNAL FRONT NEAR SINGLE MAN DOOR 1 FAULTY SWITCH Y N N
Site Status SelectorStore now fully compliant
Next Test Due in 6 months05/04/2023