Partner NameJamm Energy Pty Ltd
StateQLD
Date of Visit05/10/2022
Technician's NameJoshua Sommerfeld
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number67446
EmailEmail hidden; Javascript is required.
The Good Guys Site in QLDrockhampton

Location NameRockhampton
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DBT1 C1 13 Y 25 15 P
15 Y 23 15 P
17 Y 27 14 P
19 Y 25 19 P
21 Y 23 17 P
23 Y 28 15 P
25 Y 24 15 P
27 Y 23 15 P
31 Y 30 19 P
DBT1 C2 37 Y 29 39 P
39 Y 31 41 P
41 Y 23 33 P
DBT1 C1 14 Y 23 39 P
16 Y 23 33 P
18 Y 29 39 P
20 Y 29 39 P
22 Y 29 38 P
24 Y 23 33 P
26 Y 23 33 P
28 Y 29 39 P
30 Y 29 39 P
32 Y 25 35 P
34 Y 23 37 P
36 Y 29 39 P
38 Y 29 39 P
40 Y 29 39 P
42 Y 29 33 P
44 Y 28 15 P
46 Y 28 19 P
48 Y 24 17 P
DBT1 C3 1 Y 23 15 P
3 Y 29 39 P
5 Y 29 39 P
7 Y 29 39 P
9 Y 29 39 P
11 Y 29 39 P
13 Y 29 19 P
15 Y 29 39 P
17 Y 29 39 P
19 Y 29 39 P
21 Y 29 39 P
23 Y 29 39 P
25 Y 29 39 P
27 Y 29 39 P
29 Y 29 39 P
31 Y 29 39 P
33 Y 29 39 P
35 Y 29 39 P
37 Y 29 39 P
39 Y 29 39 P
47 Y 13 29 P
57 Y 24 34 P
2 Y 29 39 P
4 Y 23 33 P
6 Y 29 39 P
8 Y 29 39 P
10 Y 29 39 P
12 Y 23 33 P
14 Y 29 39 P
16 Y 29 19 P
18 Y 29 39 P
20 Y 29 39 P
22 Y 29 39 P
24 Y 29 39 P
26 Y 29 39 P
28 Y 29 39 P
30 Y 27 17 P
32 Y 29 39 P
34 Y 30 40 P
36 Y 29 39 P
38 Y 29 39 P
48 Y 10 20 P
58 Y 29 39 P
DB2 T1 1 Y 29 39 P
3 Y 29 39 P
5 Y 29 39 P
7 Y 29 39 P
9 Y 29 39 P
11 Y 29 39 P
13 Y 23 33 P
15 Y 23 33 P
17 Y 24 15 P
19 Y 29 39 P
21 Y 23 33 P
23 Y 29 39 P
25 Y 23 33 P
27 Y 29 39 P
29 Y 23 33 P
31 Y 23 37 P
2 Y 27 37 P
4 Y 29 39 P
8 Y 24 16 P
10 Y 24 16 P
12 Y 24 15 P
14 Y 23 16 P
16 Y 20 10 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 S Y Y Y F Failed 90 Min Test Y N
2 S Y Y Y F Failed 90 Min Test Y N
3 S Y Y Y F Failed 90 Min Test Y N
4 R Y Y Y P
6 R Y Y Y P
7 R Y Y Y P
8 S Y Y Y P
9 S Y Y Y P
10 S Y Y Y P
11 S Y Y Y P
12 S Y Y Y P
13 S Y Y Y P
14 S Y Y Y P
15 R Y Y Y P
16 R Y Y Y P
17 R Y Y Y P
18 R Y Y Y P
19 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 Y Y Y P
2 Y Y Y P
3 Y Y Y P
4 Y Y Y P
5 Y Y Y P
6 Y Y Y P
7 Y Y Y P
8 Y Y Y P
9 Y Y Y P
10 Y Y Y P
11 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
400W Metal Hallide Y
LED Strip Light blue Y
LED Panel Lights Y
2x28W WP Fittings Y
Dichroic Downlight Y
18W Emergency Light Y
2x36W Bare Battens Y
1x36W Bare Battens Y
2x36W WP Fittings Y
1000W/400W Flood Lights Y
70W Downlight Y
ES Surface Fitting Y
1x18W WPM Fitting Y
LED Downlights Y
Are there any Warranty items needing to be repaired?Yes
WARRANTY
Defect Item Location of Item (on premises) Quantity Details of fault/problem Manufacturer Part Number Repaired on Site Comments
LED Hi Bay Sales Floor 2 Not illuminating Davis Hi Bays N Awaiting materials will replace at 6M Audit
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Surface mount emergency fittings #1 #2 #3 3 Not illuminating Y N N
Led driver Perimeter of displays 16 Faulty driver N N N Observation only.
Light box Heating/cooling display 1 Burnt out N N N Added onto fortnightly repairs report.
Site Status SelectorQLD - Maintenance has been completed in accordance to ASS2293.2 and QDC MP6.1. - Store now fully compliant
Next Test Due in 6 months06/04/2023