Carry out push button test and record the results below.
RCD Details (Biennial)
Distribution Board No.
Circuit No.
Push Button (YorN)
0 Degrees
180 Degrees
Pass / Fail (PorF)
Fault?
Repaired on Site (YorN)
DB-1
1
Y
22
13
P
3
Y
22
11
P
5
Y
28
18
P
17
Y
24
15
P
19
Y
29
18
P
21
Y
26
17
P
23
Y
28
18
P
25
Y
28
18
P
29
Y
28
17
P
31
Y
28
18
P
33
Y
28
18
P
35
Y
25
16
P
37
Y
27
17
P
39
Y
24
15
P
41
Y
28
38
P
43
Y
25
15
P
50
Y
31
19
P
51
Y
24
33
P
52
Y
11
21
P
53
Y
29
19
P
54
Y
13
23
P
55
Y
28
18
P
57
Y
30
19
P
61
Y
87
15
P
63
Y
25
15
P
65
Y
13
24
P
67
Y
11
20
P
68
Y
25
17
P
69
Y
11
21
P
70
Y
28
18
P
72
Y
24
15
P
74
Y
28
19
P
75
Y
29
19
P
77
Y
29
19
P
79
Y
29
19
P
81
Y
25
17
P
84
Y
29
19
P
86
Y
29
18
P
88
Y
25
17
P
90
Y
28
18
P
92
Y
28
18
P
DB-2
1
Y
24
15
P
3
Y
24
14
P
5
Y
28
18
P
7
Y
24
15
P
15
Y
24
20
P
17
Y
27
17
P
19
Y
31
21
P
21
Y
26
16
P
23
Y
25
15
P
25
Y
28
18
P
27
Y
28
18
P
29
Y
28
18
P
31
Y
26
17
P
35
Y
24
15
P
37
Y
28
19
P
39
Y
25
17
P
41
Y
27
18
P
43
Y
24
16
P
45
Y
24
15
P
46
Y
24
15
P
47
Y
28
18
P
48
Y
25
16
P
49
Y
29
19
P
50
Y
28
18
P
51
Y
24
18
P
52
Y
29
19
P
53
Y
24
15
P
54
Y
28
18
P
56
Y
23
17
P
58
Y
28
18
P
DB-3
1
Y
34
15
P
3
Y
27
28
P
4
Y
28
18
P
5
Y
108
28
P
6
Y
30
20
P
7
Y
25
16
P
8
Y
27
18
P
9
Y
24
16
P
10
Y
25
16
P
11
Y
26
18
P
12
Y
24
16
P
13
Y
24
15
P
14
Y
29
19
P
15
Y
28
15
P
16
Y
188
19
P
17
Y
28
18
P
18
Y
28
18
P
19
Y
29
16
P
20
Y
28
37
P
22
Y
24
17
P
27
Y
27
20
P
29
Y
69
59
P
31
Y
29
18
P
33
Y
26
17
P
34
Y
28
20
P
35
Y
27
20
P
36
Y
24
16
P
37
Y
26
20
P
38
Y
28
18
P
39
Y
24
24
P
40
Y
29
21
P
41
Y
28
18
P
42
Y
26
18
P
43
Y
28
18
P
44
Y
28
18
P
45
Y
28
18
P
46
Y
28
18
P
47
Y
28
18
P
THERMOGRAPHIC TEST RESULTS
THERMOGRAPHIC TEST RESULTS
SF43 Exit/Emergency
SF43 EXIT/EMERGENCY LIGHTING
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
Check timers for correct operation and timing
Switched Socket Outlets
Carry out visual check on SSOs for signs of misuse, blackening or deterioration
Check and report any outlets with multiple power boards overloading
Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No.
ID No.
Surface mounted or recessed? (SorR)
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DB-2
2
R
Y
Y
Y
P
DB-2
4
S
Y
Y
Y
P
DB-2
5
S
Y
Y
Y
P
DB-2
6
S
Y
Y
Y
P
DB-2
7
S
Y
Y
Y
P
DB-2
10
S
Y
Y
Y
P
DB-2
11
S
Y
Y
Y
P
DB-2
12
S
Y
Y
Y
P
DB-2
13
S
Y
Y
Y
P
DB-2
15
S
Y
Y
Y
P
DB-2
18
S
Y
Y
Y
P
DB-2
20
S
Y
Y
Y
P
DB-2
21
S
Y
Y
Y
P
DB-2
22
S
Y
Y
Y
P
DB-2
23
S
Y
Y
Y
P
DB-2
25
R
Y
Y
Y
P
DB-2
28
R
Y
Y
Y
P
DB-2
30
R
Y
Y
Y
P
DB-2
31
R
Y
Y
Y
P
DB-2
33
R
Y
Y
Y
P
DB-2
34
R
Y
Y
Y
P
DB-2
35
R
Y
Y
Y
P
DB-2
36
R
Y
Y
Y
P
DB-2
37
R
Y
Y
Y
P
DB-2
39
R
Y
Y
Y
P
DB-2
40
R
Y
Y
Y
P
DB-2
42
R
Y
Y
Y
P
DB-2
43
R
Y
Y
Y
P
DB-2
44
R
Y
Y
Y
P
Unknown
45
R
Y
Y
Y
P
HTML Block
EXIT LIGHTS
Distribution Board No.
ID No.
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DB-2
1
Y
Y
Y
P
DB-2
3
Y
Y
Y
P
DB-2
8
Y
Y
Y
P
DB-2
9
Y
Y
Y
P
DB-2
14
Y
Y
Y
P
DB-2
16
Y
Y
Y
P
DB-2
17
Y
Y
Y
P
DB-2
19
Y
Y
Y
P
DB-2
24
Y
Y
Y
P
DB-2
26
Y
Y
Y
P
DB-2
27
Y
Y
Y
P
DB-2
29
Y
Y
Y
P
DB-2
32
Y
Y
Y
P
DB-2
38
Y
Y
Y
P
DB-2
41
Y
Y
Y
P
SF44 General Lighting & Works
SF44 GENERAL LIGHTING & WORKS
General Checklist
Check correct operation of all luminaries
Report on any faulty luminaries/control gear
Provide costing to repair/replace
HTML Block
General Operation/Additional items
Check with Store Manager to ensure there are no other issues
Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au
Yes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten)
Existing (YorN)
High bay LED lights
Y
LED downlights
Y
4ft LED lights
Y
Are there any Warranty items needing to be repaired?
No
WARRANTY
Defect Item
Location of Item (on premises)
Quantity
Details of fault/problem
Manufacturer
Part Number
Repaired on Site
Comments
High Bay
Computer Accessories
1
Faulty
Davis
-
N
Refer to job #70206
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
Down lights
Tv's
10
Failed
Y
N
N
Driver
Hisense display
1
Faulty driver
Y
N
N
Lamps
Front of store
4
Failed to luminate
Y
N
N
Lamp
Loading Dock
1
Failed to luminate
Y
N
N
RCBO 41
Switchboard
1
Tripping
Y
N
N
Power circuit overloaded with Miele and Samsung washing machines, disconnected multiply washes and circuit staying on. In future a new power circuit will need to be installed to separate displays. Added to fortnightly repairs report.
LED lighting
Microsoft display
1
Failed to luminate
Y
N
N
Gained access inside display and re- connected Led fitting that had come loose.
Circuit Breaker 30
Main switchboard
1
Tripping
Y
N
N
Disconnected faulty lights under eve and circuit is now staying on, lights have previously been report and need to be updated with LED panel lights. Added to fortnightly repairs report.
Site Status Selector
Store now fully compliant
Next Test Due in 6 months
07/03/2023