Partner NameSturdie Trade Services
StateVIC
Date of Visit06/10/2022
Technician's NameMatt Setches
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number67219
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICthomastown

Location NameThomastown
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB-1 1 Y 22 13 P
3 Y 22 11 P
5 Y 28 18 P
17 Y 24 15 P
19 Y 29 18 P
21 Y 26 17 P
23 Y 28 18 P
25 Y 28 18 P
29 Y 28 17 P
31 Y 28 18 P
33 Y 28 18 P
35 Y 25 16 P
37 Y 27 17 P
39 Y 24 15 P
41 Y 28 38 P
43 Y 25 15 P
50 Y 31 19 P
51 Y 24 33 P
52 Y 11 21 P
53 Y 29 19 P
54 Y 13 23 P
55 Y 28 18 P
57 Y 30 19 P
61 Y 87 15 P
63 Y 25 15 P
65 Y 13 24 P
67 Y 11 20 P
68 Y 25 17 P
69 Y 11 21 P
70 Y 28 18 P
72 Y 24 15 P
74 Y 28 19 P
75 Y 29 19 P
77 Y 29 19 P
79 Y 29 19 P
81 Y 25 17 P
84 Y 29 19 P
86 Y 29 18 P
88 Y 25 17 P
90 Y 28 18 P
92 Y 28 18 P
DB-2 1 Y 24 15 P
3 Y 24 14 P
5 Y 28 18 P
7 Y 24 15 P
15 Y 24 20 P
17 Y 27 17 P
19 Y 31 21 P
21 Y 26 16 P
23 Y 25 15 P
25 Y 28 18 P
27 Y 28 18 P
29 Y 28 18 P
31 Y 26 17 P
35 Y 24 15 P
37 Y 28 19 P
39 Y 25 17 P
41 Y 27 18 P
43 Y 24 16 P
45 Y 24 15 P
46 Y 24 15 P
47 Y 28 18 P
48 Y 25 16 P
49 Y 29 19 P
50 Y 28 18 P
51 Y 24 18 P
52 Y 29 19 P
53 Y 24 15 P
54 Y 28 18 P
56 Y 23 17 P
58 Y 28 18 P
DB-3 1 Y 34 15 P
3 Y 27 28 P
4 Y 28 18 P
5 Y 108 28 P
6 Y 30 20 P
7 Y 25 16 P
8 Y 27 18 P
9 Y 24 16 P
10 Y 25 16 P
11 Y 26 18 P
12 Y 24 16 P
13 Y 24 15 P
14 Y 29 19 P
15 Y 28 15 P
16 Y 188 19 P
17 Y 28 18 P
18 Y 28 18 P
19 Y 29 16 P
20 Y 28 37 P
22 Y 24 17 P
27 Y 27 20 P
29 Y 69 59 P
31 Y 29 18 P
33 Y 26 17 P
34 Y 28 20 P
35 Y 27 20 P
36 Y 24 16 P
37 Y 26 20 P
38 Y 28 18 P
39 Y 24 24 P
40 Y 29 21 P
41 Y 28 18 P
42 Y 26 18 P
43 Y 28 18 P
44 Y 28 18 P
45 Y 28 18 P
46 Y 28 18 P
47 Y 28 18 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-2 2 R Y Y Y P
DB-2 4 S Y Y Y P
DB-2 5 S Y Y Y P
DB-2 6 S Y Y Y P
DB-2 7 S Y Y Y P
DB-2 10 S Y Y Y P
DB-2 11 S Y Y Y P
DB-2 12 S Y Y Y P
DB-2 13 S Y Y Y P
DB-2 15 S Y Y Y P
DB-2 18 S Y Y Y P
DB-2 20 S Y Y Y P
DB-2 21 S Y Y Y P
DB-2 22 S Y Y Y P
DB-2 23 S Y Y Y P
DB-2 25 R Y Y Y P
DB-2 28 R Y Y Y P
DB-2 30 R Y Y Y P
DB-2 31 R Y Y Y P
DB-2 33 R Y Y Y P
DB-2 34 R Y Y Y P
DB-2 35 R Y Y Y P
DB-2 36 R Y Y Y P
DB-2 37 R Y Y Y P
DB-2 39 R Y Y Y P
DB-2 40 R Y Y Y P
DB-2 42 R Y Y Y P
DB-2 43 R Y Y Y P
DB-2 44 R Y Y Y P
Unknown 45 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-2 1 Y Y Y P
DB-2 3 Y Y Y P
DB-2 8 Y Y Y P
DB-2 9 Y Y Y P
DB-2 14 Y Y Y P
DB-2 16 Y Y Y P
DB-2 17 Y Y Y P
DB-2 19 Y Y Y P
DB-2 24 Y Y Y P
DB-2 26 Y Y Y P
DB-2 27 Y Y Y P
DB-2 29 Y Y Y P
DB-2 32 Y Y Y P
DB-2 38 Y Y Y P
DB-2 41 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
High bay LED lights Y
LED downlights Y
4ft LED lights Y
Are there any Warranty items needing to be repaired?No
WARRANTY
Defect Item Location of Item (on premises) Quantity Details of fault/problem Manufacturer Part Number Repaired on Site Comments
High Bay Computer Accessories 1 Faulty Davis - N Refer to job #70206
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Down lights Tv's 10 Failed Y N N
Driver Hisense display 1 Faulty driver Y N N
Lamps Front of store 4 Failed to luminate Y N N
Lamp Loading Dock 1 Failed to luminate Y N N
RCBO 41 Switchboard 1 Tripping Y N N Power circuit overloaded with Miele and Samsung washing machines, disconnected multiply washes and circuit staying on. In future a new power circuit will need to be installed to separate displays. Added to fortnightly repairs report.
LED lighting Microsoft display 1 Failed to luminate Y N N Gained access inside display and re- connected Led fitting that had come loose.
Circuit Breaker 30 Main switchboard 1 Tripping Y N N Disconnected faulty lights under eve and circuit is now staying on, lights have previously been report and need to be updated with LED panel lights. Added to fortnightly repairs report.
Site Status SelectorStore now fully compliant
Next Test Due in 6 months07/03/2023