| Date of Visit | 13/10/2022 |
|---|
| Technician's Name | Jesse Whittaker |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 67086 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in WA | osborne_park |
|---|
|
|
|---|
| Location Name | Osborne Park |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | Biennial Test (once every two years) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| RCD Details (Biennial) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB1 |
11R |
Y |
- |
- |
P |
|
|
|
11W |
Y |
- |
- |
P |
|
|
|
11B |
Y |
- |
- |
P |
|
|
|
13R |
Y |
- |
- |
P |
|
|
|
13W |
Y |
- |
- |
P |
|
|
|
13B |
Y |
- |
- |
P |
|
|
|
15R |
Y |
- |
- |
P |
|
|
|
15W |
Y |
- |
- |
P |
|
|
|
15B |
Y |
- |
- |
P |
|
|
|
17R |
Y |
- |
- |
P |
|
|
|
17W |
Y |
- |
- |
P |
|
|
|
17B |
Y |
- |
- |
P |
|
|
|
19R |
Y |
- |
- |
P |
|
|
|
19B |
Y |
- |
- |
P |
|
|
|
12R |
Y |
- |
- |
P |
|
|
|
12W |
Y |
- |
- |
P |
|
|
|
12B |
Y |
- |
- |
P |
|
|
|
14R |
Y |
- |
- |
P |
|
|
|
14W |
Y |
- |
- |
P |
|
|
|
14B |
Y |
- |
- |
P |
|
|
|
16R |
Y |
- |
- |
P |
|
|
|
16W |
Y |
- |
- |
P |
|
|
|
16B |
Y |
- |
- |
P |
|
|
|
18R |
Y |
- |
- |
P |
|
|
|
18W |
Y |
- |
- |
P |
|
|
|
18B |
Y |
- |
- |
P |
|
|
| SB1 |
1R |
Y |
- |
- |
P |
|
|
|
1W |
Y |
- |
- |
P |
|
|
|
1B |
Y |
- |
- |
P |
|
|
|
5R |
Y |
- |
- |
P |
|
|
|
5W |
Y |
- |
- |
P |
|
|
|
5B |
Y |
- |
- |
P |
|
|
|
7R |
Y |
- |
- |
P |
|
|
|
2R |
Y |
- |
- |
P |
|
|
|
2W |
Y |
- |
- |
P |
|
|
|
2B |
Y |
- |
- |
P |
|
|
|
4R |
Y |
- |
- |
P |
|
|
|
4W |
Y |
- |
- |
P |
|
|
|
4B |
Y |
- |
- |
P |
|
|
|
6R |
Y |
- |
- |
P |
|
|
|
6W |
Y |
- |
- |
P |
|
|
|
6B |
Y |
- |
- |
P |
|
|
|
8R |
Y |
- |
- |
P |
|
|
|
8W |
Y |
- |
- |
P |
|
|
|
8B |
Y |
- |
- |
P |
|
|
|
10R |
Y |
- |
- |
P |
|
|
|
10W |
Y |
- |
- |
P |
|
|
|
10B |
Y |
- |
- |
P |
|
|
|
12R |
Y |
- |
- |
P |
|
|
|
12W |
Y |
- |
- |
P |
|
|
|
12B |
Y |
- |
- |
P |
|
|
| SB2 |
3W |
Y |
- |
- |
P |
|
|
|
3B |
Y |
- |
- |
P |
|
|
|
5R |
Y |
- |
- |
P |
|
|
|
5B |
Y |
- |
- |
P |
|
|
|
9W |
Y |
- |
- |
P |
|
|
|
13W |
Y |
- |
- |
P |
|
|
|
13B |
Y |
- |
- |
P |
|
|
|
2R |
Y |
- |
- |
P |
|
|
|
2W |
Y |
- |
- |
P |
|
|
|
2B |
Y |
- |
- |
P |
|
|
|
4R |
Y |
- |
- |
P |
|
|
|
4W |
Y |
- |
- |
P |
|
|
|
4B |
Y |
- |
- |
P |
|
|
|
6R |
Y |
- |
- |
P |
|
|
|
6W |
Y |
- |
- |
P |
|
|
|
6B |
Y |
- |
- |
P |
|
|
|
8R |
Y |
- |
- |
P |
|
|
|
8W |
Y |
- |
- |
P |
|
|
|
8B |
Y |
- |
- |
P |
|
|
|
10R |
Y |
- |
- |
P |
|
|
|
10W |
Y |
- |
- |
P |
|
|
|
10B |
Y |
- |
- |
P |
|
|
|
14R |
Y |
- |
- |
P |
|
|
|
14W |
Y |
- |
- |
P |
|
|
|
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB1 |
2 |
R |
Y |
Y |
Y |
P |
|
|
|
|
3 |
R |
Y |
Y |
Y |
P |
|
|
|
|
4 |
R |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
14 |
R |
Y |
Y |
Y |
P |
|
|
|
|
15 |
R |
Y |
Y |
Y |
P |
|
|
|
|
16 |
S |
Y |
Y |
Y |
P |
|
|
|
|
17 |
S - Twin batten type |
Y |
Y |
Y |
P |
|
|
|
|
19 |
R |
Y |
Y |
Y |
P |
|
|
|
|
20 |
S |
Y |
Y |
Y |
P |
|
|
|
|
21 |
S |
Y |
Y |
Y |
P |
|
|
|
|
22 |
S |
Y |
Y |
Y |
P |
|
|
|
|
25 |
S |
Y |
Y |
Y |
P |
|
|
|
|
26 |
S |
Y |
Y |
Y |
P |
|
|
|
|
27 |
S |
Y |
Y |
Y |
P |
|
|
|
|
30 |
R |
Y |
Y |
Y |
P |
|
|
|
|
32 |
S |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB1 |
1 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
13 |
Y |
Y |
Y |
P |
|
|
|
|
18 |
Y |
Y |
Y |
P |
|
|
|
|
23 |
Y |
Y |
Y |
P |
|
|
|
|
24 |
Y |
Y |
Y |
P |
|
|
|
|
28 |
Y |
Y |
Y |
P |
|
|
|
|
29 |
Y |
Y |
Y |
P |
|
|
|
|
31 |
Y |
Y |
Y |
P |
|
|
|
|
33 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| 400W Hi-Bay Lights |
Y |
| 16y 18W Lights |
Y |
| Oyster Lights |
Y |
| 16y 36W Diffused Battens |
Y |
| LED Down Lights |
Y |
| Exit Lights |
Y |
| Spitfire Emergency Lights |
Y |
| 26y 36W Emergency Battens Diffused |
Y |
| Davis 4ft LED Batten |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Next Test Due in 6 months | 13/04/2022 |
|---|
| |
|---|
| |