Partner Name | Built Services |
---|
State | SA |
---|
Date of Visit | 02/11/2022 |
---|
Technician's Name | Antonio Portolesi |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 67289 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in SA | mile_end |
---|
|
|
---|
Location Name | Mile End |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB T8/9 |
R13 |
Y |
191 |
109 |
P |
|
|
DB T8/9 |
W13 |
Y |
13 |
13 |
P |
|
|
DB T8/9 |
B13 |
Y |
31 |
21 |
P |
|
|
DB T8/9 |
R15 |
Y |
43 |
21 |
P |
|
|
DB T8/9 |
W15 |
Y |
32 |
23 |
P |
|
|
DB T8/9 |
B19 |
Y |
15 |
14 |
P |
|
|
DB T8/9 |
R21 |
Y |
12 |
12 |
P |
|
|
DB T8/9 |
W21 |
Y |
11 |
11 |
P |
|
|
DB T8/9 |
B21 |
Y |
10 |
10 |
P |
|
|
DB T8/9 |
W23 |
Y |
10 |
10 |
P |
|
|
DB T8/9 |
B23 |
Y |
23 |
13 |
P |
|
|
DB T8/9 |
R25 |
Y |
27 |
18 |
P |
|
|
DB T8/9 |
W25 |
Y |
29 |
19 |
P |
|
|
DB T8/9 |
B25 |
Y |
29 |
19 |
P |
|
|
DB T8/9 |
R27 |
Y |
29 |
19 |
P |
|
|
DB T8/9 |
W27 |
Y |
29 |
19 |
P |
|
|
DB T8/9 |
B27 |
Y |
26 |
17 |
P |
|
|
DB T8/9 |
R14 |
Y |
29 |
19 |
P |
|
|
DB T8/9 |
W14 |
Y |
11 |
15 |
P |
|
|
DB T8/9 |
B16 |
Y |
27 |
13 |
P |
|
|
DB T8/9 |
R18 |
Y |
9 |
9 |
P |
|
|
DB T8/9 |
W18 |
Y |
9 |
9 |
P |
|
|
DB T8/9 |
B18 |
Y |
9 |
9 |
P |
|
|
DB T8/9 |
R20 |
Y |
9 |
9 |
P |
|
|
DB T8/9 |
W20 |
Y |
9 |
9 |
P |
|
|
DB T8/9 |
B20 |
Y |
9 |
9 |
P |
|
|
DB T8/9 |
R26 |
Y |
11 |
11 |
P |
|
|
DB T8/9 |
R30 |
Y |
24 |
14 |
P |
|
|
DB T8/9 |
W30 |
Y |
24 |
14 |
P |
|
|
DB T8/9 |
B30 |
Y |
21 |
14 |
P |
|
|
DB T8/9 |
B32 |
Y |
29 |
19 |
P |
|
|
DB T8/9 |
R34 |
Y |
29 |
19 |
P |
|
|
DB T8/9 |
W34 |
Y |
29 |
19 |
P |
|
|
DB T8/9 |
R29 |
Y |
10 |
13 |
P |
|
|
DB T8/9 |
W29 |
Y |
10 |
13 |
P |
|
|
DB T8/9 |
B29 |
Y |
10 |
13 |
P |
|
|
DB T8/9A |
R45 |
Y |
26 |
15 |
P |
|
|
DB T8/9A |
W45 |
Y |
11 |
10 |
P |
|
|
DB T8/9A |
B45 |
Y |
36 |
21 |
P |
|
|
DB T8/9A |
R59 |
Y |
24 |
14 |
P |
|
|
DB T8/9A |
W59 |
Y |
17 |
19 |
P |
|
|
DB T8/9A |
B59 |
Y |
11 |
11 |
P |
|
|
DB T8/9A |
R61 |
Y |
13 |
43 |
P |
|
|
DB T8/9A |
W61 |
Y |
13 |
13 |
P |
|
|
DB T8/9A |
B61 |
Y |
31 |
20 |
P |
|
|
DB T8/9A |
R63 |
Y |
11 |
11 |
P |
|
|
DB T8/9A |
W63 |
Y |
29 |
19 |
P |
|
|
DB T8/9A |
B63 |
Y |
29 |
19 |
P |
|
|
DB T8/9A |
R65 |
Y |
11 |
15 |
P |
|
|
DB T8/9A |
W65 |
Y |
29 |
19 |
P |
|
|
DB T8/9A |
B65 |
Y |
11 |
11 |
P |
|
|
DB T8/9A |
R67 |
Y |
27 |
18 |
P |
|
|
DB T8/9A |
W67 |
Y |
13 |
47 |
P |
|
|
DB T8/9A |
B67 |
Y |
16 |
16 |
P |
|
|
DB T8/9A |
W46 |
Y |
29 |
19 |
P |
|
|
DB T8/9A |
B46 |
Y |
30 |
18 |
P |
|
|
DB T8/9A |
R48 |
Y |
10 |
10 |
P |
|
|
DB T8/9A |
W48 |
Y |
10 |
10 |
P |
|
|
DB T8/9A |
B48 |
Y |
28 |
18 |
P |
|
|
DB T8/9A |
R50 |
Y |
10 |
11 |
P |
|
|
DB T8/9A |
W50 |
Y |
11 |
11 |
P |
|
|
DB T8/9A |
B50 |
Y |
12 |
11 |
P |
|
|
DB T8/9A |
R52 |
Y |
29 |
19 |
P |
|
|
DB T8/9A |
W52 |
Y |
10 |
11 |
P |
|
|
DB T8/9A |
B52 |
Y |
11 |
11 |
P |
|
|
DB T8/9A |
R54 |
Y |
11 |
11 |
P |
|
|
DB T8/9A |
W54 |
Y |
30 |
20 |
P |
|
|
DB T8/9A |
B54 |
Y |
11 |
20 |
P |
|
|
DB T8/9A |
R56 |
Y |
34 |
24 |
P |
|
|
DB T8/9A |
W56 |
Y |
12 |
12 |
P |
|
|
DB T8/9A |
B56 |
Y |
23 |
14 |
P |
|
|
DB T8/9A |
R58 |
Y |
13 |
13 |
P |
|
|
DB T8/9A |
B58 |
Y |
11 |
11 |
P |
|
|
DB T8/9A |
R60 |
Y |
11 |
11 |
P |
|
|
DB T8/9A |
B60 |
Y |
29 |
19 |
P |
|
|
DB T8/9A |
R62 |
Y |
23 |
14 |
P |
|
|
DB T8/9A |
W62 |
Y |
23 |
13 |
P |
|
|
DB T8/9A |
B62 |
Y |
29 |
19 |
P |
|
|
DB T8/9A |
R64 |
Y |
29 |
19 |
P |
|
|
DB T8/9A |
W64 |
Y |
10 |
10 |
P |
|
|
DB T8/9A |
B64 |
Y |
10 |
10 |
P |
|
|
DB T8/9A |
R66 |
Y |
29 |
10 |
P |
|
|
DB T8/9A |
W66 |
Y |
10 |
19 |
P |
|
|
DB T8/9A |
B66 |
Y |
11 |
10 |
P |
|
|
DB T8/9A |
R68 |
Y |
10 |
11 |
P |
|
|
DB T8/9A |
W68 |
Y |
33 |
23 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB T8/9 |
1 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
3 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
4 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
5 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
7 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
8 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
9 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
10 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
11 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
12 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
13 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
14 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
15 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
16 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
17 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
18 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
19 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
20 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
21 |
R |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
22 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
23 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
24 |
S |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
25 |
R |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
26 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB T8/9 |
1 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
2 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
3 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
4 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
5 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
6 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
7 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
8 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
9 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
10 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
11 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
12 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
13 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
14 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
15 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
16 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
17 |
Y |
Y |
Y |
P |
|
|
|
DB T8/9 |
18 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
LED FLURO 1200mm LONG |
Y |
90mm DOWNLIGHT W/WHITE |
Y |
ROUND UFO LED HIGHBAYS |
Y |
LOW BAYS |
Y |
LINKABLES |
Y |
RECESSED COMPACT FLUROS 120mm |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 02/05/2022 |
---|
| |
---|
| |