Partner Name | Sturdie Trade Services |
---|
State | VIC |
---|
Date of Visit | 08/11/2022 |
---|
Technician's Name | Nathan McBain |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 67230 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in VIC | ballarat |
---|
|
|
---|
Location Name | Ballarat |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB 2 |
20 |
Y |
20 |
19 |
P |
|
|
DB 2 |
24 |
Y |
19 |
19 |
P |
|
|
DB 2 |
26 |
Y |
19 |
18 |
P |
|
|
DB 2 |
28 |
Y |
19 |
19 |
P |
|
|
DB 2 |
40 |
Y |
19 |
19 |
P |
|
|
DB 2 |
42 |
Y |
19 |
19 |
P |
|
|
DB 2 |
44 |
Y |
18 |
19 |
P |
|
|
DB 2 |
46 |
Y |
153 |
22 |
P |
|
|
DB 2 |
48 |
Y |
18 |
18 |
P |
|
|
DB 2A |
4 |
Y |
34 |
40 |
P |
|
|
DB 2A |
6 |
Y |
39 |
34 |
P |
|
|
DB 2A |
8 |
Y |
31 |
31 |
P |
|
|
DB 2A |
10 |
Y |
32 |
37 |
P |
|
|
DB 2A |
12 |
Y |
19 |
19 |
P |
|
|
DB 2A |
14 |
Y |
29 |
37 |
P |
|
|
DB 2A |
16 |
Y |
29 |
37 |
P |
|
|
DB 2A |
18 |
Y |
29 |
38 |
P |
|
|
DB 2A |
20 |
Y |
32 |
41 |
P |
|
|
DB 2A |
22 |
Y |
19 |
19 |
P |
|
|
DB 2A |
24 |
Y |
18 |
18 |
P |
|
|
DB 2A |
26 |
Y |
19 |
19 |
P |
|
|
DB 2A |
28 |
Y |
19 |
19 |
P |
|
|
DB 2A |
29 |
Y |
42 |
40 |
P |
|
|
DB 2A |
30 |
Y |
19 |
19 |
P |
|
|
DB 2A |
31 |
Y |
32 |
32 |
P |
|
|
DB 2A |
32 |
Y |
34 |
36 |
P |
|
|
DB 2A |
33 |
Y |
31 |
31 |
P |
|
|
DB 2A |
34 |
Y |
19 |
19 |
P |
|
|
DB 2A |
35 |
Y |
32 |
35 |
P |
|
|
DB 2A |
36 |
Y |
19 |
19 |
P |
|
|
DB 2A |
37 |
Y |
37 |
31 |
P |
|
|
DB 2A |
38 |
Y |
19 |
19 |
P |
|
|
DB 2A |
39 |
Y |
32 |
33 |
P |
|
|
DB 2A |
40 |
Y |
19 |
19 |
P |
|
|
DB 2A |
41 |
Y |
31 |
32 |
P |
|
|
DB 2A |
44 |
Y |
19 |
18 |
P |
|
|
DB 2A |
46 |
Y |
19 |
19 |
P |
|
|
DB 2A |
48 |
Y |
19 |
19 |
P |
|
|
DB 1 |
9 |
Y |
23 |
26 |
P |
|
|
DB 1 |
11 |
Y |
32 |
33 |
P |
|
|
DB 1 |
12 |
Y |
37 |
37 |
P |
|
|
DB 1 |
15 |
Y |
19 |
19 |
P |
|
|
DB 1 |
17 |
Y |
18 |
18 |
P |
|
|
DB 1 |
31 |
Y |
31 |
32 |
P |
|
|
DB 1 |
32 |
Y |
37 |
37 |
P |
|
|
DB 1 |
40 |
Y |
19 |
19 |
P |
|
|
DB 1 |
42 |
Y |
19 |
19 |
P |
|
|
DB 1 |
44 |
Y |
19 |
19 |
P |
|
|
DB 1 |
46 |
Y |
19 |
19 |
P |
|
|
DB 1 |
47 |
Y |
19 |
20 |
P |
|
|
DB 1 |
48 |
Y |
19 |
19 |
P |
|
|
DB 1 |
50 |
Y |
32 |
36 |
P |
|
|
DB 1 |
54 |
Y |
18 |
18 |
P |
|
|
DB 1 |
57 |
Y |
30 |
30 |
P |
|
|
DB 1A |
1 |
Y |
18 |
18 |
P |
|
|
DB 1A |
4 |
Y |
33 |
34 |
P |
|
|
DB 1A |
5 |
Y |
19 |
19 |
P |
|
|
DB 1A |
10 |
Y |
21 |
21 |
P |
|
|
DB 1A |
13 |
Y |
31 |
30 |
P |
|
|
DB 1A |
16 |
Y |
37 |
31 |
P |
|
|
DB 1A |
22 |
Y |
19 |
19 |
P |
|
|
DB 1A |
27 |
Y |
40 |
38 |
P |
|
|
DB 1A |
29 |
Y |
32 |
49 |
P |
|
|
DB 1A |
31 |
Y |
19 |
18 |
P |
|
|
DB 1A |
32 |
Y |
36 |
40 |
P |
|
|
DB 1A |
33 |
Y |
19 |
19 |
P |
|
|
DB 1A |
34 |
Y |
19 |
19 |
P |
|
|
DB 1A |
35 |
Y |
31 |
50 |
P |
|
|
DB 1A |
36 |
Y |
19 |
19 |
P |
|
|
DB 1A |
37 |
Y |
31 |
38 |
P |
|
|
DB 1A |
38 |
Y |
19 |
19 |
P |
|
|
DB 1A |
39 |
Y |
30 |
37 |
P |
|
|
DB 1A |
40 |
Y |
18 |
18 |
P |
|
|
DB 1A |
41 |
Y |
30 |
38 |
P |
|
|
DB 1A |
42 |
Y |
32 |
40 |
P |
|
|
DB 1A |
43 |
Y |
19 |
19 |
P |
|
|
DB 1A |
44 |
Y |
19 |
19 |
P |
|
|
DB 1A |
45 |
Y |
21 |
21 |
P |
|
|
DB 1A |
46 |
Y |
18 |
18 |
P |
|
|
DB 1A |
47 |
Y |
18 |
18 |
P |
|
|
DB 1A |
48 |
Y |
19 |
18 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
1 |
|
Y |
Y |
Y |
P |
|
|
|
|
2 |
|
Y |
Y |
Y |
P |
|
|
|
|
3 |
|
Y |
Y |
Y |
P |
|
|
|
|
4 |
|
Y |
Y |
Y |
P |
|
|
|
|
5 |
|
Y |
Y |
Y |
P |
|
|
|
|
6 |
|
Y |
Y |
Y |
P |
|
|
|
|
7 |
|
Y |
Y |
Y |
P |
|
|
|
|
8 |
|
Y |
Y |
Y |
P |
|
|
|
|
9 |
|
Y |
Y |
Y |
P |
|
|
|
|
10 |
|
Y |
Y |
Y |
P |
|
|
|
|
11 |
|
Y |
Y |
Y |
P |
|
|
|
|
12 |
|
Y |
Y |
Y |
P |
|
|
|
|
13 |
|
Y |
Y |
Y |
P |
|
|
|
|
14 |
|
Y |
Y |
Y |
P |
|
|
|
|
15 |
|
Y |
Y |
Y |
P |
|
|
|
|
16 |
|
Y |
Y |
Y |
P |
|
|
|
|
17 |
|
Y |
Y |
Y |
P |
|
|
|
|
18 |
|
Y |
Y |
Y |
P |
|
|
|
|
19 |
|
Y |
Y |
Y |
P |
|
|
|
|
20 |
|
Y |
Y |
Y |
P |
|
|
|
|
21 |
|
Y |
Y |
Y |
P |
|
|
|
|
22 |
|
Y |
Y |
Y |
P |
|
|
|
|
23 |
|
Y |
Y |
Y |
P |
|
|
|
|
24 |
|
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
10 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
Y |
Y |
Y |
P |
|
|
|
|
13 |
Y |
Y |
Y |
P |
|
|
|
|
14 |
Y |
Y |
Y |
P |
|
|
|
|
15 |
Y |
Y |
Y |
P |
|
|
|
|
16 |
Y |
N |
Y |
F |
Failed discharge test |
Y |
N |
|
17 |
Y |
Y |
Y |
P |
|
|
|
|
18 |
Y |
N |
Y |
F |
Failed discharge test |
Y |
N |
|
19 |
Y |
Y |
Y |
P |
|
|
|
|
20 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
DAVIS LED BATTENS |
Y |
LED HIGHBAYS |
Y |
ROUND RECESSED SHOP FITTING (COUNTER) |
Y |
LED TRACK LIGHTS |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
TRIPPING CIRCUITS |
DB2A |
5 |
CB4, CB 6, CB29, CB35, CB37 TRIPPING UPON START UP |
Y |
N |
N |
NEW CIRCUITS TO BE INSTALLED, RCDS REQUIRED - WORKS COMPLETED ON JOB NO. 70332 |
CEILING TILES |
SOUNDBARS(12)/TV WALL(6)/CHEST FREEZERS(5)/FRIDGES(35)/COOKTOPS(2)/FRONT ENTRANCE (6)WASHING MACHINES(7)/BOH(2)/ OFFICE(6) |
81 |
CEILING TILES DAMAGED/WATER DAMAGE |
N |
TBA |
TBA |
OBSERVATION. VARIOUS TILES HAVE LIGHTS/CAMERAS /FIRE DETECTORS MOUNTED |
EM 16 |
BOH RAISED CEILING |
1 |
FAILED 90MIN DISCHGARGE TEST |
Y |
N |
N |
|
EM 18 |
TV AREA RAISED CEILING |
1 |
FAILED 90MIN DISCHARGE TEST |
Y |
N |
N |
|
36W/865 TUBES |
OFFICE |
10 |
FAILED TO ILLUMINATE |
Y |
N |
N |
|
SITE FOLDER |
OFFICE |
1 |
NO SITE FOLDER ONSITE, SUPPLY AND UPDATE EMERGENCY LAYOUT WHILE ONSITE |
Y |
N |
N |
|
EX 19 |
BOH NEAR FIRE DOOR |
1 |
NEW RACKING INSTALLED |
Y |
N |
N |
TURNED SIGN 180° TO POINT TOWARDS EXIT FIRE DOOR |
EX 20 |
FRONT ENTRANCE TO STORE |
1 |
DIRECTIONAL ARROW POINTING WRONG DIRECTION |
Y |
N |
N |
NO DIRECTIONAL ARROW REQUIRED, SOURCED REPLACEMENT INSERT DUE TO FITTING BEING RECESSED. MODEL BARDIC MLEDLP. |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 08/05/2023 |
---|
| |
---|
| |