Partner NameSturdie Trade Services
StateVIC
Date of Visit09/11/2022
Technician's NameMatt Setches
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number67231
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICchirnside_park

Location NameChirnside Park
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB-T11 2 Y 36 36 P
4 Y 61 148 P
6 Y 47 175 P
8 Y 37 37 P
9 Y 28 39 P
10 Y 49 261 P
11 Y 29 39 P
12 Y 42 214 P
13 Y 30 40 P
14 Y 44 39 P
15 Y 30 40 P
17 Y 30 39 P
19 Y 30 39 P
21 Y 29 39 P
22 Y 30 53 P
23 Y 30 39 P
24 Y 28 19 P
25 Y 30 39 P
26 Y 30 52 P
27 Y 30 40 P
28 Y 23 35 P
29 Y 30 40 P
30 Y 30 40 P
31 Y 30 40 P
32 Y 26 33 P
33 Y 30 40 P
34 Y 29 40 P
35 Y 29 39 P
36 Y 31 41 P
37 Y 29 38 P
38 Y 27 33 P
39 Y 29 39 P
40 Y 30 40 P
41 Y 30 40 P
42 Y 29 35 P
44 Y 29 32 P
46 Y 31 41 P
48 Y 28 38 P
50 Y 25 44 P
52 Y 30 40 P
54 Y 30 40 P
55 Y 31 41 P
56 Y 22 37 P
57 Y 30 21 P
58 Y 25 20 P
59 Y 22 32 P
60 Y 22 32 P
61 Y 30 40 P
62 Y 23 33 P
63 Y 28 38 P
64 Y 24 40 P
65 Y 28 38 P
66 Y 28 38 P
67 Y 29 39 P
68 Y 31 25 P
69 Y 30 41 P
70 Y 28 38 P
71 Y 27 38 P
72 Y 30 40 P
73 Y 29 39 P
74 Y 23 33 P
75 Y 28 40 P
76 Y 30 40 P
78 Y 31 41 P
80 Y 29 39 P
82 Y 31 40 P
84 Y 28 40 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB T11 8 R Y Y Y P
9 R Y Y Y P
10 R Y Y Y P
11 R Y Y Y P
12 R Y Y Y P
13 R Y Y Y P
14 R Y Y Y P
15 R Y Y Y P
16 R Y Y Y P
17 R Y Y Y P
18 R Y Y Y P
19 R Y Y Y P
21 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB T11 1 Y Y Y P
2 Y Y Y P
3 Y Y Y P
4 Y Y Y P
5 Y Y Y P
6 Y Y Y P
7 Y Y Y P
20 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
36W double batten Y
LED troffer lights Y
Halogen downlights Y
Compact fluorescent lights Y
Exit lights Y
Emergency lights Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Main switch Switchboard 2 No protective deciders on main switches N N N Require 2x sets of deciders for main switches- Will be replaced when on site before trade next
Light boxes Fridges 2 Tripping circuit Y N N
2x WP bare battens Loading dock 2 Failed to luminate Y N N
Light box Tv brackets 1 Failed to luminate and causing power to trip N N N Require 8x Led linkables to replace faulty lights. Added to fortnightly repairs list.
Light box Smart speakers 1 Failed to luminate and causing power to trip N N N Require 8x Led linkables to replace faulty lights. Added to fortnightly repairs list.
Light box Printing supplies 1 Partially luminated N N N Require 8x Led linkables to replace faulty lights. Added to fortnightly repairs list.
Light box Home security 1 Failed to luminate and causing power to trip N N N Require 8x Led linkables to replace faulty lights. Added to fortnightly repairs list.
Light box Mobile plans 1 Partially luminated N N N Require 8x Led linkables to replace faulty lights. Added to fortnightly repairs list.
Display lights Schweigen rangehoods 6 Failed to luminate N N N Require 6x Led linkables no longer than 1m. Added to fortnightly repairs list.
Site Status SelectorStore now fully compliant
Next Test Due in 6 months10/04/2023