Partner NameBuilt Services
StateNSW
Date of Visit24/11/2022
Technician's NamePeter Tsoukarellis
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number66882
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWwarrawong

Location NameWarrawong
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
msb light and power 1 Y 14 23 P
msb light and power 2 Y 12 22 P
msb light and power 3 Y 9 18 P
msb light and power 4 Y 9 18 P
msb light and power 8 Y 9 19 P
msb light and power 9 Y 9 18 P
msb light and power 10 Y 9 18 P
msb light and power 11 Y 18 27 P
msb light and power 12 Y 14 22 P
msb light and power 16 Y 11 20 P
msb light and power 17 Y 9 18 P
msb light and power 18 Y 9 18 P
msb light and power 19 Y 18 19 P
msb light and power 20 Y 18 20 P
msb light and power 21 Y 30 42 P
msb light and power 22 Y 19 20 P
msb light and power 23 Y 19 20 P
msb light and power 24 Y 19 19 P
msb light and power 25 Y 20 20 P
msb light and power 26 Y 19 20 P
msb light and power 27 Y 19 28 P
msb light and power 28 Y 19 20 P
msb light and power 29 Y 19 20 P
msb light and power 30 Y 28 19 P
msb light and power 31 Y 19 20 P
msb light and power 32 Y 9 18 P
msb light and power 33 Y 9 18 P
msb light and power 37 Y 9 18 P
msb light and power 38 Y 8 18 P
msb light and power 39 Y 9 18 P
msb light and power 40 Y 8 18 P
msb light and power 41 Y 9 19 P
msb light and power 42 Y 9 18 P
msb light and power 43 Y 9 18 P
msb light and power 44 Y 9 19 P
msb light and power 45 Y 9 18 P
msb light and power 46 Y 12 20 P
msb light and power 47 Y 17 26 P
msb light and power 48 Y 14 23 P
msb light and power 52 Y 9 18 P
msb light and power 53 Y 13 23 P
msb light and power 54 Y 9 20 P
msb light and power 55 Y 19 20 P
msb light and power 56 Y 19 20 P
msb light and power 57 Y 9 19 P
msb light and power 58 Y 19 29 P
msb light and power 59 Y 20 29 P
msb light and power 60 Y 19 20 P
msb light and power 61 Y 19 20 P
msb light and power 62 Y 19 20 P
msb light and power 63 Y 19 29 P
msb light and power 64 Y 19 29 P
msb light and power 65 Y 19 20 P
msb light and power 66 Y 19 20 P
msb light and power 67 Y 13 21 P
msb light and power 71 Y 9 18 P
msb light and power 72 Y 20 29 P
msb selling area a 1 Y 11 21 P
msb selling area a 2 Y 13 22 P
msb selling area a 3 Y 8 18 P
msb selling area a 4 Y 14 23 P
msb selling area a 5 Y 14 24 P
msb selling area a 6 Y 13 22 P
msb selling area a 10 Y 12 22 P
msb selling area a 11 Y 12 22 P
msb selling area a 12 Y 9 18 P
msb selling area a 13 Y 14 23 P
msb selling area a 14 Y 10 20 P
msb selling area b 1 Y 13 22 P
msb selling area b 2 Y 9 18 P
msb selling area b 3 Y 13 22 P
msb selling area b 4 Y 14 23 P
msb selling area b 5 Y 13 22 P
msb selling area b 6 Y 13 22 P
msb selling area b 10 Y 13 23 P
msb selling area b 11 Y 13 22 P
msb selling area b 12 Y 11 21 P
msb selling area b 13 Y 9 19 P
msb selling area b 14 Y 10 20 P
msb external lighting 1 Y 10 20 P
msb external lighting 2 N NA NA NA RCBO tripped. Fault on circuit. Y
msb external lighting 3 Y 10 20 P
msb external lighting 4 Y 58 68 P
msb external lighting 7 Y 10 20 P
DB1 1 Y 78 89 P
DB1 2 Y 30 38 P
DB1 3 Y 30 30 P
DB1 4 Y 31 54 P
DB1 5 Y 30 20 P
DB1 6 Y 78 50 P
DB1 7 Y 30 30 P
DB1 8 Y 38 38 P
DB1 9 Y 38 38 P
DB1 10 Y 45 45 P
DB1 11 Y 76 56 P
DB1 12 Y - - F RCBO Fault Y
DB1 13 Y 57 36 P
DB1 14 Y 70 40 P
DB1 15 Y 29 20 P
DB1 16 Y 29 21 P
DB1 17 Y 38 38 P
DB1 18 Y - - F RCBO Fault Y
DB1 19 Y 39 20 P
DB1 20 Y 90 62 P
DB1 21 Y 30 20 P
DB1 22 Y 30 29 P
DB1 23 Y 38 38 P
DB1 24 Y 23 28 P
DB1 25 Y 28 43 P
DB1 26 Y 39 44 P
DB1 27 Y 23 24 P
DB1 28,30,32 Y 36 28 P
DB1 29 Y 29 59 P
DB1 31 Y 38 38 P
DB2 1 Y 28 20 P
DB2 2 Y 33 26 P
DB2 3 Y 29 20 P
DB2 4 Y 29 20 P
DB2 5 Y 22 19 P
DB2 6 Y 23 19 P
DB2 7 Y 29 19 P
DB2 8 Y 36 30 P
DB2 9 Y 29 20 P
DB2 10 Y 27 19 P
DB2 11 Y 29 21 P
DB2 12 Y 30 20 P
DB2 13 Y 49 19 P
DB2 14 Y 28 18 P
DB2 15 Y 29 20 P
DB2 16 Y 43 45 P
DB2 17 Y 29 20 P
DB2 18 Y 26 20 P
DB2 19 Y 29 21 P
DB2 20 Y 49 45 P
DB2 21 Y 30 19 P
DB2 22 Y 23 22 P
DB2 23 Y 34 46 P
DB2 24 Y 29 20 P
DB2 25 Y 34 24 P
DB2 26 Y 24 20 P
DB2 27 Y 29 20 P
DB2 28 Y 23 19 P
DB2 29 Y 20 29 P
DB2 30 Y 35 44 P
DB2 31 Y 28 33 P
DB2 32 Y 26 19 P
DB2 33 Y 29 44 P
DB2 35 Y 29 20 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
MSB EM1 Y Y Y P
EM2 Y Y Y P
EM3 Y Y Y P
EM4 Y Y Y P
EM5 Y Y Y P
EM6 Y Y Y P
EM7 Y Y Y P
EM8 Y Y Y P
EM9 Y Y Y P
EM10 Y Y Y P
EM11 Y Y Y P
EM12 Y Y Y P
EM13 Y Y Y P
EM14 Y Y Y P
EM15 Y Y Y P
EM16 Y Y Y P
EM17 Y Y Y P
EM18 Y Y Y P
EM19 Y Y Y P
EM20 Y Y Y P
EM21 Y Y Y P
EM22 Y Y Y P
EM23 Y Y Y P
EM24 Y Y Y P
EM25 Y Y Y P
EM30 Y Y Y P
EM33 Y Y Y P
EM35 Y Y Y P
EM38 Y Y Y P
EM39 Y Y Y P
EM40 Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
MSB EX1 Y Y Y P
EX2 Y Y Y P
EX3 Y Y Y P
EX4 Y Y Y P
EX5 Y Y Y P
EX6 Y Y Y P
EX7 Y Y Y P
EX8 Y Y Y P
EX9 Y Y Y P
EX10 Y Y Y P
EX11 Y Y Y P
EX12 Y Y Y P
EX13 Y Y Y P
EX14 Y Y Y P
EX15 Y Y Y P
EX16 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Hi Bays Halo Globe Y
50mm LED Downlight Y
Fluoro Pelmet Lights Y
200mm Downlight Folded Fluoro Twin Globe Y
2x30W Caged Fluoro Fitting Y
1x30W Diffused Fluoro Fitting Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Wall bay fluoro light boxes Perimeter of the store 14 x 3.6 m long light boxes some are all out some are working at 50% capacity N N N Added to fortnightly repairs list.
External IP56 power point Outside RHS of shop entrance 1 Missing screw top and flap Y N N
Pendant Lights Smeg & Technika section 4 Faulty Lamps Y N N
Hisense light Refrigerator section 1 Hisense LED light flashing abovr the refrigerator Y N N Replaced faulty driver.
RCBO #12 DB-1 1 Faulty Y N N
RCBO #18 DB-1 1 Faulty Y N N
RCBO # 2 MSB 1 Tripped Y N N RCD tripped due to faulty low bay light. Light removed, RCD working as usual again.
External Lights External perimeter of the store 1 Not working Y N N Traced fault to a faulty low bay light. Removed faulty light, all working as intended.
Emergency lighting plan Logbook Maintenance Folder 1 No plan on site. Y N N New lighting plan drawn up on site and placed in folder.
Weber stand light weber section 1 No power to weber light stand N N N Supplier funded repairs. Please advise if you wish for Sturdie to repair.
High Bay Light Shop floor 1 Not working N N Y Added to fortnightly repairs list.
Main Office Upstairs 1 x light batten and 1 x emergency spitfire Previously removed due to roof water damage N N N Please advise once roof has been installed so we can replace lights.
Haier washing machine washing maching section 1 Sign not illuminated N N N Supplier funded repairs. Please advise if you wish for Sturdie to repair.
Fisher & Paykel washing machine section 1 Sign not illuminated N N N Supplier funded repairs. Please advise if you wish for Sturdie to repair.
Floodlights Carpark 3 Not working N N N Please advise if Sturdie are to replace these.
Good Guys Sign entrance of car park 1 Sign not working N N N Added to fortnightly repairs list.
External Lights main entrance 2 Not working N N N Added to fortnightly repairs list.
Low Bay LED Light Left hand side of entrance 1 Full of water N N N Removed light and made safe. Added to fortnightly repairs list.
Site Status SelectorStore now fully compliant
Next Test Due in 6 months24/05/2023