Partner NameDCS Electrical
StateTAS
Date of Visit15/11/2022
Technician's NameNathan Rainbird
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number67336
EmailEmail hidden; Javascript is required.
The Good Guys Site in TASmoonah

Location NameMoonah
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
1 Y 0280 0247 P
2 y 0290 0291 p
3 y 0270 0278 p
4 y 0230 0245 p
5 y 0220 0236 p
6 y 0255 0245 p
7 y 0288 0234 p
8 y 0280 0275 p
9 y 0290 0300 p
10 y 0278 0310 p
11 y 0237 0178 p
12 y 0258 0254 p
13 y 0231 0247 p
14 y 0255 0236 p
15 y 0244 0298 p
16 y 0255 0287 p
17 y 0280 0278 p
18 y 0255 0295 p
19 y 0230 0236 p
20 y 0280 0278 p
21 y 0290 0236 p
22 y 0290 0269 p
23 y 0280 0258 p
24 y 0255 047 p
25 y 0236 0256 p
26 y 0235 0236 p
27 y 0245 0214 p
28 y 0280 0231 p
29 y 0255 0248 p
30 y 0276 0236 p
31 y 0278 0214 p
32 y 0300 0214 p
33 y 0260 0215 p
34 y 0278 0216 p
35 y 0280 0236 p
36 y 0255 0278 p
37 y 0260 0214 p
38 y 0267 0236 p
39 y 0258 0258 p
40 y 0259 0310 p
41 y 0300 0236 p
42 y 0214 0258 p
43 y 0215 0266 p
44 y 0216 0255 p
45 y 0214 0236 p
46 y 0289 0239 p
47 y 0289 0278 p
48 y 0255 0300 p
DB1 1 y 0230 0247 p
2 y 0247 0236 p
3 y 0256 0275 p
4 y 0255 0296 p
5 y 0236 0285 p
6 y 0249 0296 p
7 y 0264 0236 p
8 y 0256 0293 p
9 y 0253 0286 p
10 y 0293 0271 p
11 y 0287 0248 p
12 y 0289 0284 p
13 y 0239 0295 p
14 y 0267 0285 p
15 y 0223 0296 p
16 y 0233 0236 p
17 y 0255 0296 p
18 y 0266 0275 p
19 y 0265 0285 p
20 y 0293 0312 p
21 y 0300 0296 p
22 y 0255 0285 p
23 y 0269 0274 p
24 y 0254 0296 p
25 y 0234 0236 p
26 y 0245 0296 p
27 y 0237 0285 p
28 y 0279 0275 p
29 y 0289 0356 p
30 y 0255 0248 p
31 y 0248 0298 p
32 y 0236 0348 p
33 y 0247 0298 p
34 y 0236 0247 p
35 y 0214 0258 p
36 y 0219 0245 p
37 y 0293 0268 p
38 y 0254 0289 p
39 y 0246 0247 p
40 y 0214 0245 p
41 y 0258 0246 p
42 y 0269 0256 p
43 y 0247 0235 p
44 y 0247 0267 p
45 y 0239 0269 p
46 y 0256 0237 p
47 y 0256 0258 p
48 y 0247 0269 p
49 y 0239 0247 p
50 y 0247 0234 p
51 y 0214 0258 p
52 y 0258 0247 p
53 y 0256 0214 p
54 y 0249 0271 p
55 y 0253 0214 p
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB2 2 S Y Y Y P
3 S Y Y Y P
4 S Y Y Y P
5 S Y Y Y P
6 S Y Y Y P
7 S Y Y Y P
9 S Y Y Y P
10 S Y Y Y P
11 S Y Y Y P
12 S Y Y Y P
13 S Y Y Y P
15 S Y Y Y P
16 S Y Y Y P
17 S Y Y Y P
18 S Y Y Y P
19 S Y Y Y P
20 S Y Y Y P
21 S Y Y Y P
22 S Y Y Y P
23 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB2 1 Y Y Y P
8 Y Y Y P
14 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
2 x 36W Bare Batten Y
Diffused Hi Bays Y
2 x 36W Diffused Batten Y
1 x 36W Diffused Batten Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Emergency Lighting Plan Site Folder x 1 Inaccurate N N N Plan to be updated and placed in site folder next audit
Next Test Due in 6 months11/05/2022