| Partner Name | SEM Darwin |
|---|
| State | NT |
|---|
| Date of Visit | 08/12/2022 |
|---|
| Technician's Name | Thomas Banks |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 67293 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in NT | darwin |
|---|
|
|
|---|
| Location Name | Darwin |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | Biennial Test (once every two years) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| RCD Details (Biennial) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB1 |
19 |
Y |
.26 |
.23 |
P |
|
|
|
23 |
Y |
.24 |
.22 |
P |
|
|
|
25 |
Y |
.27 |
.27 |
P |
|
|
|
27 |
Y |
.26 |
.27 |
P |
|
|
|
29 |
Y |
.22 |
.26 |
P |
|
|
|
33 |
Y |
.28 |
.22 |
P |
|
|
|
35 |
Y |
.18 |
.19 |
P |
|
|
|
37 |
Y |
.24 |
.24 |
P |
|
|
|
39 |
Y |
.29 |
.26 |
P |
|
|
|
41 |
Y |
.23 |
.24 |
P |
|
|
|
43 |
Y |
.25 |
.24 |
P |
|
|
|
45 |
Y |
.19 |
.21 |
P |
|
|
|
47 |
Y |
.25 |
.27 |
P |
|
|
|
49 |
Y |
.23 |
.21 |
P |
|
|
|
51 |
Y |
.29 |
.27 |
P |
|
|
|
53 |
Y |
.24 |
.23 |
P |
|
|
|
55 |
Y |
.22 |
.23 |
P |
|
|
|
57 |
Y |
.28 |
.26 |
P |
|
|
|
59 |
Y |
.27 |
.27 |
P |
|
|
|
61 |
Y |
.23 |
.22 |
P |
|
|
|
63 |
Y |
.17 |
.19 |
P |
|
|
|
65 |
Y |
.20 |
.22 |
P |
|
|
|
66 |
Y |
.21 |
.22 |
P |
|
|
|
67 |
Y |
.28 |
.26 |
P |
|
|
|
68 |
Y |
.29 |
.28 |
P |
|
|
|
70 |
Y |
.22 |
.23 |
P |
|
|
| DB2 |
2 |
Y |
.21 |
.22 |
P |
|
|
|
4 |
Y |
.25 |
.25 |
P |
|
|
|
6 |
Y |
.22 |
.27 |
P |
|
|
|
14 |
Y |
.14 |
.18 |
P |
|
|
|
16 |
Y |
.19 |
.21 |
P |
|
|
|
20 |
Y |
.19 |
.17 |
P |
|
|
|
22 |
Y |
.29 |
.28 |
P |
|
|
|
24 |
Y |
.23 |
.26 |
P |
|
|
|
25 |
Y |
.26 |
.27 |
P |
|
|
|
26 |
Y |
.22 |
.21 |
P |
|
|
|
27 |
Y |
.18 |
.15 |
P |
|
|
|
28 |
Y |
.22 |
.26 |
P |
|
|
|
29 |
Y |
.23 |
.23 |
P |
|
|
|
30 |
Y |
.13 |
.14 |
P |
|
|
|
32 |
Y |
.25 |
.23 |
P |
|
|
|
33 |
Y |
.23 |
.22 |
P |
|
|
|
34 |
Y |
.28 |
.27 |
P |
|
|
|
35 |
Y |
.28 |
.28 |
P |
|
|
|
36 |
Y |
.12 |
.14 |
P |
|
|
|
38 |
Y |
.23 |
.21 |
P |
|
|
|
39 |
Y |
.22 |
.26 |
P |
|
|
|
40 |
Y |
.17 |
.17 |
P |
|
|
|
41 |
Y |
.19 |
.23 |
P |
|
|
|
42 |
Y |
.29 |
.26 |
P |
|
|
|
43 |
Y |
.14 |
.18 |
P |
|
|
|
45 |
Y |
.19 |
.17 |
P |
|
|
|
47 |
Y |
.22 |
.23 |
P |
|
|
|
49 |
Y |
.28 |
.26 |
P |
|
|
|
51 |
Y |
.12 |
.13 |
P |
|
|
|
53 |
Y |
.15 |
.16 |
P |
|
|
|
55 |
Y |
.20 |
.18 |
P |
|
|
|
57 |
Y |
.19 |
.23 |
P |
|
|
|
58 |
Y |
.24 |
.28 |
P |
|
|
|
59 |
Y |
.25 |
.24 |
P |
|
|
|
61 |
Y |
.28 |
.25 |
P |
|
|
|
63 |
Y |
.23 |
.28 |
P |
|
|
|
65 |
Y |
.26 |
.27 |
P |
|
|
|
67 |
Y |
.13 |
.19 |
P |
|
|
|
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB1 |
2 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
4 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
5 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
7 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
8 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
9 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
10 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
11 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
12 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
13 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
14 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
15 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
18 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
21 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
22 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
24 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
27 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
29 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
31 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
32 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
33 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
34 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
35 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
36 |
R |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB1 |
1 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
3 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
16 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
19 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
20 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
23 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
25 |
Y |
N |
N |
F |
BATTERY |
Y |
N |
| DB1 |
26 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
28 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
30 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| Jumbo Exit LED |
Y |
| Exit LED |
Y |
| Exit Ultrablade |
Y |
| LED Spitfire |
Y |
| Halogen Spitfire |
Y |
| 36w Emergency Diffused Fitting |
Y |
| 36w Diffused Fitting |
Y |
| Fluro High Bay |
Y |
| Fluro Low Bay |
Y |
| LED Down Light |
Y |
| Halogen Down Light |
Y |
| Oyster Light |
Y |
| LED Strip |
Y |
| LED Flood Light |
Y |
| 18w W/P Fitting |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| LED Highbay |
Fridges |
1 |
Not working |
N |
N |
TBA |
Works not completed at time of audit due to Blackout period. If repairs are required, please send through work order. |
| Downlight |
Technika Cooking |
1 |
Not working |
N |
N |
TBA |
Works not completed at time of audit due to Blackout period. If repairs are required, please send through work order. |
| Exit Light #25 |
Back of house |
1 |
Failed testing |
Y |
N |
N |
|
|
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Next Test Due in 6 months | 08/06/2023 |
|---|
| |
|---|
| |