Partner Name | Bass Hill Electrical Pty Ltd |
---|
State | NSW |
---|
Date of Visit | 20/01/2023 |
---|
Technician's Name | Shane Hamilton |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 70926 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in NSW | blacktown |
---|
|
|
---|
Location Name | Blacktown |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB1 |
17 |
Y |
P |
|
|
DB1 |
18 |
Y |
P |
|
|
DB1 |
19 |
Y |
P |
|
|
DB1 |
20 |
Y |
P |
|
|
DB1 |
21 |
Y |
P |
|
|
DB1 |
23 |
Y |
P |
|
|
DB1 |
25 |
Y |
P |
|
|
DB1 |
26 |
Y |
P |
|
|
DB1 |
27 |
Y |
P |
|
|
DB1 |
28 |
Y |
P |
|
|
DB1 |
29 |
Y |
P |
|
|
DB1 |
32 |
Y |
P |
|
|
DB1 |
34 |
Y |
P |
|
|
DB1 |
36 |
Y |
P |
|
|
DB1.1 |
1 |
Y |
P |
|
|
DB1.1 |
2 |
Y |
P |
|
|
DB1.1 |
3 |
Y |
P |
|
|
DB1.1 |
4 |
Y |
P |
|
|
DB1.1 |
5 |
Y |
P |
|
|
DB1.1 |
6 |
Y |
P |
|
|
DB1.1 |
7 |
Y |
P |
|
|
DB1.1 |
8 |
Y |
P |
|
|
DB1.1 |
9 |
Y |
P |
|
|
DB1.1 |
10 |
Y |
P |
|
|
DB1.1 |
11 |
Y |
P |
|
|
DB2 |
3 |
Y |
P |
|
|
DB2 |
5 |
Y |
P |
|
|
DB2 |
6 |
Y |
P |
|
|
DB2 |
7 |
Y |
P |
|
|
DB2 |
10 |
Y |
P |
|
|
DB2 |
12 |
Y |
P |
|
|
DB2 |
14 |
Y |
P |
|
|
DB2 |
22 |
Y |
P |
|
|
DB2 |
24 |
Y |
P |
|
|
DB3 |
4 |
Y |
P |
|
|
DB3 |
6 |
Y |
P |
|
|
DB3 |
8 |
Y |
P |
|
|
DB3 |
10 |
Y |
P |
|
|
DB3 |
15 |
Y |
P |
|
|
DB3 |
16 |
Y |
P |
|
|
DB3 |
18 |
Y |
P |
|
|
DB3 |
20 |
Y |
P |
|
|
DB3 |
22 |
Y |
P |
|
|
DB3 |
28 |
Y |
P |
|
|
DB3 |
30 |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
Em1 |
R |
Y |
Y |
Y |
P |
|
|
|
|
Em2 |
R |
Y |
Y |
Y |
P |
|
|
|
|
Em3 |
R |
Y |
Y |
Y |
P |
|
|
|
|
Em4 |
R |
Y |
Y |
Y |
P |
|
|
|
|
Em5 |
R |
Y |
Y |
Y |
P |
|
|
|
|
Em6 |
R |
Y |
Y |
Y |
P |
|
|
|
|
Em7 |
R |
Y |
Y |
Y |
P |
|
|
|
|
Em8 |
R |
Y |
Y |
Y |
P |
|
|
|
|
Em9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em11 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em13 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em14 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em15 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em16 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em17 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em18 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em 19 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em20 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em21 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em22 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em23 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em24 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em25 |
S |
Y |
Y |
Y |
P |
|
|
|
|
E26 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em27 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em28 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em29 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em30 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em31 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em32 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em33 |
S |
Y |
Y |
Y |
P |
|
|
|
|
En24 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
10 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
Y |
Y |
Y |
P |
|
|
|
|
13 |
Y |
Y |
Y |
P |
|
|
|
|
14 |
Y |
Y |
Y |
P |
|
|
|
|
15 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
Halo High Bays |
Y |
Pelmet Lights 21W and 28W T5 Light Boxes |
Y |
2 x 28W Plastic Diffused Fluoro Fitting |
Y |
2 x 28W Caged Fluoro Fitting |
Y |
5W LED Downlight 50mm Fitting |
Y |
150mm LED Downlight |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Technika sign |
Kitchens |
1 |
Faulty light |
N |
N |
TBA |
Supplier funded stand. Please raise a new work order if you would like Sturdie to repair. |
3 x pendant lights |
Hot plates |
3 |
Globes |
N |
N |
TBA |
Supplier funded stand. Please raise a new work order if you would like Sturdie to repair. |
Fisher & Paykel |
Kitchens |
1 |
Light |
N |
N |
TBA |
Supplier funded stand. Please raise a new work order if you would like Sturdie to repair. |
Down lights |
Range hoods |
4 |
Light |
N |
N |
TBA |
Supplier funded stand. Please raise a new work order if you would like Sturdie to repair. |
3 x pendant lights |
Smeg hot plates |
3 |
Globes |
N |
N |
TBA |
Supplier funded stand. Please raise a new work order if you would like Sturdie to repair. |
Smeg sign |
Kitchens |
1 |
Light |
N |
N |
TBA |
Supplier funded stand. Please raise a new work order if you would like Sturdie to repair. |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 20/07/2023 |
---|
| |
---|
| |