Partner NameSturdie Trade Services
StateVIC
Date of Visit23/01/2023
Technician's NameNathan McBain
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number70999
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICgeelong

Location NameGeelong
HTML Block
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB-1 1 Y P
DB-1 3 Y P
DB-1 5 Y P
DB-1 7 Y P
DB-1 9 Y P
DB-1 11 Y P
DB-1 13 Y P
DB-1 15 Y P
DB-1 17 Y P
DB-1 19 Y P
DB-1 21 Y P
DB-1 23 Y P
DB-1 25 Y P
DB-1 27 Y P
DB-1 29 Y P
DB-1 36 Y P
DB-1 44 Y P
DB-1 46 Y P
DB-1 48 Y P
DB-1B 1 Y P
DB-1B 2 Y P
DB-1B 3 Y P
DB-1B 4 Y P
DB-1B 5 Y P
DB-1B 6 Y P
DB-1B 7 Y P
DB-1B 8 Y P
DB-1B 9 Y P
DB-1B 10 Y P
DB-1B 11 Y P
DB-1B 12 Y P
DB-1B 13 Y P
DB-1B 14 Y P
DB-1B 15 Y P
DB-1B 16 Y P
DB-1B 17 Y P
DB-1B 18 Y P
DB-1B 19 Y P
DB-1B 20 Y P
DB-1B 21 Y P
DB-1B 22 Y P
DB-1B 23 Y P
DB-1B 24 Y P
DB-1B 25 Y P
DB-1B 26 Y P
DB-1B 27 Y P
DB-1B 29 Y P
DB-1B 31 Y P
DB-1B 33 Y P
DB-1B 35 Y P
DB-3 1 Y P
DB-3 3 Y P
DB-3 5 Y P
DB-3 14 Y P
DB-3 23 Y P
DB-3 24 Y P
DB-3 25 Y P
DB-3 26 Y P
DB-3 27 Y P
DB-3 28 Y P
DB-3 29 Y P
DB-3 30 Y P
DB-3 31 Y P
DB-3 32 Y P
DB-3 33 Y P
DB-3 34 Y P
DB-3 35 Y P
DB-3 37 Y P
DB-3 38 Y P
DB-3 40 Y P
DB-3 42 Y P
DB-3 45 Y P
DB-3 47 Y P
DB-2 3 Y P
DB-2 5 Y P
DB-2 7 Y P
DB-2 9 Y P
DB-2 11 Y P
DB-2 13 Y P
DB-2 15 Y P
DB-2 17 Y P
DB-2 19 Y P
DB-2 21 Y P
DB-2 23 Y P
DB-2 25 Y P
DB-2 27 Y P
DB-2 29 Y P
DB-2 31 Y P
DB-2 32 Y P
DB-2 33 Y P
DB-2 34 Y P
DB-2 35 Y P
DB-2 36 Y P
DB-2 37 Y P
DB-2 39 Y P
DB-2 41 Y P
DB-2 42 Y P
DB-2 43 Y P
DB-2 44 Y P
DB-2 45 Y P
DB-2 46 Y P
DB-2 47 Y P
DB-2 48 Y P
DB-2 49 Y P
DB-2 50 Y P
DB-2 51 Y P
DB-2 53 Y P
DB-2 55 Y P
SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-1 1 S Y Y Y P
DB-1 2 R Y Y Y P
DB-1 3 S Y Y Y P
DB-1 4 S Y Y Y P
DB-1 5 S Y Y Y P
DB-1 6 S Y Y Y P
DB-1 7 S Y Y Y P
DB-1 8 S Y Y Y P
DB-1 9 S Y Y Y P
DB-1 10 S Y Y Y P
DB-1 19 R Y Y Y P
DB-1 11 S Y Y Y P
DB-1 12 S Y Y Y P
DB-1 13 S Y Y Y P
DB-1 14 S Y Y Y P
DB-1 15 S Y Y Y P
DB-1 16 S Y Y Y P
DB-1 17 S Y Y Y P
DB-1 18 S Y Y Y P
DB-1 19 S Y Y Y P
DB-1 20 S Y Y Y P
DB-1 21 S Y Y Y P
DB-1 22 R Y Y Y P
DB-1 23 R Y Y Y P
DB-1 24 S Y Y Y P
DB-1 25 S Y Y Y P
DB-1 26 S Y Y Y P
DB-1 27 S Y Y Y P
DB-1 28 S Y Y Y P
DB-1 29 R Y Y Y P
DB-1 30 S Y Y Y P
DB-1 31 S Y Y Y P
DB-1 32 S Y Y Y P
DB-1 33 R Y Y Y P
DB-1 34 R Y Y Y P
DB-1 35 S Y Y Y P
DB-1 36 S Y Y Y P
DB-1 37 S Y Y Y P
DB-1 38 S Y Y Y P
DB-1 39 S Y Y Y P
DB-1 40 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-1 1 Y Y Y P
DB-1 2 Y Y Y P
DB-1 3 Y Y Y P
DB-1 4 Y Y Y P
DB-1 5 Y Y Y P
DB-1 6 Y Y Y P
DB-1 7 Y Y Y P
DB-1 8 Y Y Y P
DB-1 9 Y Y Y P
DB-1 10 Y Y Y P
DB-1 11 Y Y Y P
DB-1 12 Y Y Y P
DB-1 13 Y Y Y P
DB-1 14 Y Y Y P
DB-1 15 Y Y Y P
DB-1 16 Y Y Y P
DB-1 17 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Hi-bay lights DAVIS BLACK UFO Y
36W Twin batten lights Y
50W halogen down lights Y
DAVIS LED BATTEN
DAVIS LED MAINTAINED EMERGENCY BATTEN
Are there any Warranty items needing to be repaired?Yes
WARRANTY
Defect Item Location of Item (on premises) Quantity Details of fault/problem Manufacturer Part Number Repaired on Site Comments
LED high-bay BETWEEN DYSON LAPTOPS AND WASHING MACHINES 1 FAILED TO ILLUMINATE Davis Lighting N Scissor lift required / to be completed on warranty job number 71951
LED high-bay BOH NEAR COMPUTER BENCH AND RACKING 1 FAILED TO ILLUMINATE Davis Lighting N Scissor lift required / to be completed on warranty job number 71951
LED high-bay BOH NEAR LIFT 1 FAILED TO ILLUMINATE Davis Lighting N Scissor lift required / to be completed on warranty job number 71951
LED high-bay RONT COUNTER, CLOSEST TO CONTRACTOR SIGN IN 1 FAILED TO ILLUMINATE Davis Lighting N Scissor lift required / to be completed on warranty job number 71951
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
TEST AND TAG STORE 80+ TEST AND TAG IN-DATE , NEXT TEST DUE 03 MARCH 2023 N N N OBSERVATION
LED BATTEN UPSTAIRES STAFF ROOM 1 FITTING 50 % ILLUMINATED Y N N FOUND LOOSE CONNECTION, REPAIRED
FRIDGES RACK LED SIGNS FRIDGES 2 NO PB4/STARTER SOCKET INSTALLED ON 4 × FRIDGE RACKS N TBA TBA 2 × FRIDGE RACK LED SIGNS PLUGGED INTO EXISTING DGPO, REPLACE 1 × DGPO WITH STARTER SOCKET, INSTALL 4 × PB4S TO TOP OF RACKS AND ASSOCIATED IC LEADS. ADDED TO FORNTNIGHTLY REPAIRS LIST.
TWIN 36W/840 CAGED BATTEN BOH MEZZ FLOOR 4 FAILED TO ILLUMINATE Y N N
RACK DISPLAY LIGHTING BREVILLE MICROWAVES 1 FOUND UNPLIGGED Y N N RE DIRECTED CABLE, PLUGGED IN
RACK DISPLAY LIGHTING LC MICROWAVES 1 FOUND LEAD UNPLUGGED Y N N RE DIRECTED CABLE, PLUGGED IN
RACK DISPLAY LIGHTING ELECTROLUX VACUUM 1 FOUND FAULTY CONNECTION, REPAIRED CABLING Y N N SOLDERED FAULTY CONNECTION ON LED STRIP
Site Status SelectorStore now fully compliant
Next Test Due in 6 months23/07/2023