Carry out push button test and record the results below.
THERMOGRAPHIC TEST RESULTS
THERMOGRAPHIC TEST RESULTS
RCD Details (6 Month)
Distribution Board No.
Circuit No.
Push Button (YorN)
Pass / Fail (PorF)
Fault?
Repaired on Site (YorN)
DB-1
1
Y
P
DB-1
3
Y
P
DB-1
5
Y
P
DB-1
7
Y
P
DB-1
9
Y
P
DB-1
11
Y
P
DB-1
13
Y
P
DB-1
15
Y
P
DB-1
17
Y
P
DB-1
19
Y
P
DB-1
21
Y
P
DB-1
23
Y
P
DB-1
25
Y
P
DB-1
27
Y
P
DB-1
29
Y
P
DB-1
36
Y
P
DB-1
44
Y
P
DB-1
46
Y
P
DB-1
48
Y
P
DB-1B
1
Y
P
DB-1B
2
Y
P
DB-1B
3
Y
P
DB-1B
4
Y
P
DB-1B
5
Y
P
DB-1B
6
Y
P
DB-1B
7
Y
P
DB-1B
8
Y
P
DB-1B
9
Y
P
DB-1B
10
Y
P
DB-1B
11
Y
P
DB-1B
12
Y
P
DB-1B
13
Y
P
DB-1B
14
Y
P
DB-1B
15
Y
P
DB-1B
16
Y
P
DB-1B
17
Y
P
DB-1B
18
Y
P
DB-1B
19
Y
P
DB-1B
20
Y
P
DB-1B
21
Y
P
DB-1B
22
Y
P
DB-1B
23
Y
P
DB-1B
24
Y
P
DB-1B
25
Y
P
DB-1B
26
Y
P
DB-1B
27
Y
P
DB-1B
29
Y
P
DB-1B
31
Y
P
DB-1B
33
Y
P
DB-1B
35
Y
P
DB-3
1
Y
P
DB-3
3
Y
P
DB-3
5
Y
P
DB-3
14
Y
P
DB-3
23
Y
P
DB-3
24
Y
P
DB-3
25
Y
P
DB-3
26
Y
P
DB-3
27
Y
P
DB-3
28
Y
P
DB-3
29
Y
P
DB-3
30
Y
P
DB-3
31
Y
P
DB-3
32
Y
P
DB-3
33
Y
P
DB-3
34
Y
P
DB-3
35
Y
P
DB-3
37
Y
P
DB-3
38
Y
P
DB-3
40
Y
P
DB-3
42
Y
P
DB-3
45
Y
P
DB-3
47
Y
P
DB-2
3
Y
P
DB-2
5
Y
P
DB-2
7
Y
P
DB-2
9
Y
P
DB-2
11
Y
P
DB-2
13
Y
P
DB-2
15
Y
P
DB-2
17
Y
P
DB-2
19
Y
P
DB-2
21
Y
P
DB-2
23
Y
P
DB-2
25
Y
P
DB-2
27
Y
P
DB-2
29
Y
P
DB-2
31
Y
P
DB-2
32
Y
P
DB-2
33
Y
P
DB-2
34
Y
P
DB-2
35
Y
P
DB-2
36
Y
P
DB-2
37
Y
P
DB-2
39
Y
P
DB-2
41
Y
P
DB-2
42
Y
P
DB-2
43
Y
P
DB-2
44
Y
P
DB-2
45
Y
P
DB-2
46
Y
P
DB-2
47
Y
P
DB-2
48
Y
P
DB-2
49
Y
P
DB-2
50
Y
P
DB-2
51
Y
P
DB-2
53
Y
P
DB-2
55
Y
P
SF43 Exit/Emergency
SF43 EXIT/EMERGENCY LIGHTING
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
Check timers for correct operation and timing
Switched Socket Outlets
Carry out visual check on SSOs for signs of misuse, blackening or deterioration
Check and report any outlets with multiple power boards overloading
Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No.
ID No.
Surface mounted or recessed? (SorR)
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DB-1
1
S
Y
Y
Y
P
DB-1
2
R
Y
Y
Y
P
DB-1
3
S
Y
Y
Y
P
DB-1
4
S
Y
Y
Y
P
DB-1
5
S
Y
Y
Y
P
DB-1
6
S
Y
Y
Y
P
DB-1
7
S
Y
Y
Y
P
DB-1
8
S
Y
Y
Y
P
DB-1
9
S
Y
Y
Y
P
DB-1
10
S
Y
Y
Y
P
DB-1
19
R
Y
Y
Y
P
DB-1
11
S
Y
Y
Y
P
DB-1
12
S
Y
Y
Y
P
DB-1
13
S
Y
Y
Y
P
DB-1
14
S
Y
Y
Y
P
DB-1
15
S
Y
Y
Y
P
DB-1
16
S
Y
Y
Y
P
DB-1
17
S
Y
Y
Y
P
DB-1
18
S
Y
Y
Y
P
DB-1
19
S
Y
Y
Y
P
DB-1
20
S
Y
Y
Y
P
DB-1
21
S
Y
Y
Y
P
DB-1
22
R
Y
Y
Y
P
DB-1
23
R
Y
Y
Y
P
DB-1
24
S
Y
Y
Y
P
DB-1
25
S
Y
Y
Y
P
DB-1
26
S
Y
Y
Y
P
DB-1
27
S
Y
Y
Y
P
DB-1
28
S
Y
Y
Y
P
DB-1
29
R
Y
Y
Y
P
DB-1
30
S
Y
Y
Y
P
DB-1
31
S
Y
Y
Y
P
DB-1
32
S
Y
Y
Y
P
DB-1
33
R
Y
Y
Y
P
DB-1
34
R
Y
Y
Y
P
DB-1
35
S
Y
Y
Y
P
DB-1
36
S
Y
Y
Y
P
DB-1
37
S
Y
Y
Y
P
DB-1
38
S
Y
Y
Y
P
DB-1
39
S
Y
Y
Y
P
DB-1
40
S
Y
Y
Y
P
HTML Block
EXIT LIGHTS
Distribution Board No.
ID No.
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DB-1
1
Y
Y
Y
P
DB-1
2
Y
Y
Y
P
DB-1
3
Y
Y
Y
P
DB-1
4
Y
Y
Y
P
DB-1
5
Y
Y
Y
P
DB-1
6
Y
Y
Y
P
DB-1
7
Y
Y
Y
P
DB-1
8
Y
Y
Y
P
DB-1
9
Y
Y
Y
P
DB-1
10
Y
Y
Y
P
DB-1
11
Y
Y
Y
P
DB-1
12
Y
Y
Y
P
DB-1
13
Y
Y
Y
P
DB-1
14
Y
Y
Y
P
DB-1
15
Y
Y
Y
P
DB-1
16
Y
Y
Y
P
DB-1
17
Y
Y
Y
P
SF44 General Lighting & Works
SF44 GENERAL LIGHTING & WORKS
General Checklist
Check correct operation of all luminaries
Report on any faulty luminaries/control gear
Provide costing to repair/replace
HTML Block
General Operation/Additional items
Check with Store Manager to ensure there are no other issues
Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au
Yes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten)
Existing (YorN)
Hi-bay lights DAVIS BLACK UFO
Y
36W Twin batten lights
Y
50W halogen down lights
Y
DAVIS LED BATTEN
DAVIS LED MAINTAINED EMERGENCY BATTEN
Are there any Warranty items needing to be repaired?
Yes
WARRANTY
Defect Item
Location of Item (on premises)
Quantity
Details of fault/problem
Manufacturer
Part Number
Repaired on Site
Comments
LED high-bay
BETWEEN DYSON LAPTOPS AND WASHING MACHINES
1
FAILED TO ILLUMINATE
Davis Lighting
N
Scissor lift required / to be completed on warranty job number 71951
LED high-bay
BOH NEAR COMPUTER BENCH AND RACKING
1
FAILED TO ILLUMINATE
Davis Lighting
N
Scissor lift required / to be completed on warranty job number 71951
LED high-bay
BOH NEAR LIFT
1
FAILED TO ILLUMINATE
Davis Lighting
N
Scissor lift required / to be completed on warranty job number 71951
LED high-bay
RONT COUNTER, CLOSEST TO CONTRACTOR SIGN IN
1
FAILED TO ILLUMINATE
Davis Lighting
N
Scissor lift required / to be completed on warranty job number 71951
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
TEST AND TAG
STORE
80+
TEST AND TAG IN-DATE , NEXT TEST DUE 03 MARCH 2023
N
N
N
OBSERVATION
LED BATTEN
UPSTAIRES STAFF ROOM
1
FITTING 50 % ILLUMINATED
Y
N
N
FOUND LOOSE CONNECTION, REPAIRED
FRIDGES RACK LED SIGNS
FRIDGES
2
NO PB4/STARTER SOCKET INSTALLED ON 4 × FRIDGE RACKS
N
TBA
TBA
2 × FRIDGE RACK LED SIGNS PLUGGED INTO EXISTING DGPO, REPLACE 1 × DGPO WITH STARTER SOCKET, INSTALL 4 × PB4S TO TOP OF RACKS AND ASSOCIATED IC LEADS. ADDED TO FORNTNIGHTLY REPAIRS LIST.
TWIN 36W/840 CAGED BATTEN
BOH MEZZ FLOOR
4
FAILED TO ILLUMINATE
Y
N
N
RACK DISPLAY LIGHTING
BREVILLE MICROWAVES
1
FOUND UNPLIGGED
Y
N
N
RE DIRECTED CABLE, PLUGGED IN
RACK DISPLAY LIGHTING
LC MICROWAVES
1
FOUND LEAD UNPLUGGED
Y
N
N
RE DIRECTED CABLE, PLUGGED IN
RACK DISPLAY LIGHTING
ELECTROLUX VACUUM
1
FOUND FAULTY CONNECTION, REPAIRED CABLING
Y
N
N
SOLDERED FAULTY CONNECTION ON LED STRIP
Site Status Selector
Store now fully compliant
Next Test Due in 6 months
23/07/2023
The Built Services Group seeks to apply innovation and technology for greater client services, business efficiencies and thinking Green.