Partner NameTransit Electrical Pty Ltd
StateWA
Date of Visit07/02/2023
Technician's NameConnor Stevens
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number71318
EmailEmail hidden; Javascript is required.
The Good Guys Site in WACannington

Location NameCannington
HTML Block
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB4 - CHASSIS - 1 W1 Y P
B1 Y P
W2 Y P
B2 Y P
R3 Y P
W3 Y P
B3 Y P
R4 Y P
W4 Y P
B4 Y P
R5 Y P
W5 Y P
B5 Y P
R6 Y P
W6 Y P
B6 Y P
R7 Y P
W7 Y P
B7 Y P
R9 Y P
W9 Y P
B9 Y P
R13 Y P
W13 Y P
B13 Y P
R15 Y P
DB4 - CHASSIS - 2 R17 Y P
R18 Y P
W18 Y P
B18 Y P
W19 Y P
R20 Y P
W20 Y P
B20 Y P
B21 Y P
R22 Y P
W22 Y P
B22 Y P
R23 Y P
W23 Y P
R24 Y P
WB24 Y P
SDB4/2 R1 Y P
W1 Y P
B1 Y P
R2 Y P
W2 Y P
B2 Y P
R3 Y P
W3 Y P
B3 Y P
R4 Y P
W4 Y P
B4 Y P
R5 Y P
W5 Y P
B5 Y P
R6 Y P
W6 Y P
B6 Y P
R7 Y P
W7 N F Nuisance Tripping Y
B7 Y P
R8 Y P
W8 Y P
B8 Y P
R9 Y P
W9 Y P
B9 Y P
R10 Y P
W10 Y P
B10 Y P
R11 Y P
R12 Y P
W12 Y P
B12 Y P
SDB4/1 1 Y P
2 Y P
3 Y P
4 Y P
5 Y P
6 Y P
7 Y P
8 Y P
10 Y P
11 Y P
12 Y P
13 Y P
14 Y P
16 Y P
17 Y P
18 Y P
19 Y P
22 Y P
29 Y P
46 Y P
48 Y P
DB3 1 Y P
3 Y P
5 Y P
7 Y P
8 Y P
9 Y P
10 Y P
11 Y P
12 Y P
13 Y P
14 Y P
16 Y P
18 Y P
19 Y P
20 Y P
21 Y P
22 Y P
23 Y P
24 Y P
25 Y P
26 Y P
27 Y P
28 Y P
29 Y P
30 Y P
31 Y P
32 Y P
33 Y P
34 Y P
35 Y P
36 Y P
37 Y P
38 Y P
39 Y P
40 Y P
41 Y P
42 Y P
43 Y P
44 Y P
45 Y P
46 Y P
47 Y P
48 Y P
50 Y P
52 Y P
54 Y P
56 Y P
58 Y P
60 Y P
SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB4/1 2 R Y Y Y P
5 R Y Y Y P
6 R Y Y Y P
7 R Y Y Y P
11 R Y Y Y P
DB4 8 S Y Y Y P
13 S Y Y Y P
19 S Y Y Y P
20 S Y Y Y P
24 S Y Y Y P
25 S Y Y Y P
30 R Y Y Y P
31 R Y Y Y P
32 R Y Y Y P
33 R Y Y Y P
34 R Y Y Y P
36 S Y Y Y P
37 S Y Y Y P
38 S Y Y Y P
DB3 41 R Y Y Y P
42 R Y Y Y P
45 R Y Y Y P
46 R Y Y Y P
48 R Y Y Y P
49 R Y Y Y P
50 R Y Y Y P
51 R Y Y Y P
53 S - LED BATTEN EM Y Y Y P
54 S - LED BATTEN EM Y Y Y P
55 R Y Y Y P
57 R Y Y Y P
58 S - SINGLE FLUORO BATTEN Y Y Y P
59 S - LED BATTEN EM Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB4/1 1 Y Y Y P
3 Y Y Y P
4 Y Y Y P
10 Y Y Y P
12 Y Y Y P
DB4 14 Y Y Y P
15 Y Y Y P
16 Y Y Y P
17 Y Y Y P
18 Y Y Y P
21 Y Y Y P
22 Y Y Y P
23 Y Y Y P
26 Y Y Y P
27 Y Y Y P
28 Y Y Y P
29 Y Y Y P
35 Y Y Y P
39 Y Y Y P
40 Y Y Y P
43 Y Y Y P
44 Y Y Y P
47 Y Y Y P
52 Y Y Y P
60 Y Y Y P
61 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
LED FLOOD LIGHT Y
LED UFO HI BAY Y
LED DOWNLIGHT Y
LED EMERGENCY SPITFIRE Y
DUAL LED EMERGENCY SPITFIRE Y
EXITS Y
PAR 38 SPOTS Y
PAR 38 RECESSED LIGHTS Y
150W MH SPOTIGHTS Y
1 BY 36W EMERGENCY DEFUSED BATTEN Y
1 BY 36W DEFUSED BATTEN Y
LED BATTEN Y
LED EMERGENCY BATTEN Y
LED LINKABLES Y
Are there any Warranty items needing to be repaired?Yes
WARRANTY
Defect Item Location of Item (on premises) Quantity Details of fault/problem Manufacturer Part Number Repaired on Site Comments
LED Batten Upstairs Bathroom Hallway 1 Not illuminated DAVIS ACW435TBD Y
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Push in LED Lamps Front of building/Awning 4 Not Illuminated Y N N
Twist in LED Lamps Comms Room + Cleaners Closet 2 Not Illuminated Y Y N
LED Downlight TV Display area 2 Not Illuminated Y N N
LED Linkables Wearables, Headphones & Soundbar/Televisions 10 Not Illuminated Y N N
LED Linkables Monitors - Fluorescent Display Lighting 2 Not Illuminated Y N N
RCD W7 SDB 4/2 1 Nuisance Tripping Y N N Rectified when LED linkable battens were replaced at Television lightboxes
Site Status SelectorStore now fully compliant
Next Test Due in 6 months07/08/2023