Partner Name | Sturdie Trade Services |
---|
State | VIC |
---|
Date of Visit | 04/05/2023 |
---|
Technician's Name | Nathan McBain |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 71194 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in VIC | refinery_training_centre |
---|
|
|
---|
Location Name | Refinery Training Centre |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB A |
19 |
Y |
P |
|
|
DB A |
21 |
Y |
P |
|
|
DB A |
23 |
Y |
P |
|
|
DB A |
25 |
Y |
P |
|
|
DB A |
27 |
Y |
P |
|
|
DB A |
29 |
Y |
P |
|
|
DB A |
31 |
Y |
P |
|
|
DB A |
33 |
Y |
P |
|
|
DB A |
37 |
Y |
P |
|
|
DB A |
38 |
Y |
P |
|
|
DB A |
39 |
Y |
P |
|
|
DB A |
40 |
Y |
P |
|
|
DB A |
41 |
Y |
P |
|
|
DB A |
42 |
Y |
P |
|
|
DB A |
43 |
Y |
P |
|
|
DB A |
44 |
Y |
P |
|
|
DB A |
46 |
Y |
P |
|
|
DB A |
49 |
Y |
P |
|
|
DB A |
52 |
Y |
P |
|
|
DB A |
54 |
Y |
P |
|
|
DB A |
56 |
Y |
P |
|
|
DB A |
60 |
Y |
P |
|
|
DB A |
62 |
Y |
P |
|
|
DB A |
66 |
Y |
P |
|
|
DB A |
68 |
Y |
P |
|
|
DB A |
69 |
Y |
P |
|
|
DB A |
70 |
Y |
P |
|
|
DB B |
02 |
Y |
P |
|
|
DB B |
04 |
Y |
P |
|
|
DB B |
06 |
Y |
P |
|
|
DB B |
08 |
Y |
P |
|
|
DB B |
10 |
Y |
P |
|
|
DB B |
12 |
Y |
P |
|
|
DB B |
14 |
Y |
P |
|
|
DB B |
16 |
Y |
P |
|
|
DB B |
18 |
Y |
P |
|
|
DB B |
20 |
Y |
P |
|
|
DB B |
21 |
Y |
P |
|
|
DB B |
22 |
Y |
P |
|
|
DB B |
23 |
Y |
P |
|
|
DB B |
24 |
Y |
P |
|
|
DB B |
25 |
Y |
P |
|
|
DB B |
26 |
Y |
P |
|
|
DB B |
27 |
Y |
P |
|
|
DB B |
28 |
Y |
P |
|
|
DB B |
29 |
Y |
P |
|
|
DB B |
30 |
Y |
P |
|
|
DB B |
32 |
Y |
P |
|
|
DB B |
33 |
Y |
P |
|
|
DB B |
34 |
Y |
P |
|
|
DB B |
36 |
Y |
P |
|
|
DB B |
37 |
Y |
P |
|
|
DB B |
38 |
Y |
P |
|
|
DB B |
40 |
Y |
P |
|
|
DB B |
42 |
Y |
P |
|
|
DB B |
44 |
Y |
P |
|
|
DB B |
45 |
Y |
P |
|
|
DB B |
46 |
Y |
P |
|
|
DB B |
47 |
Y |
P |
|
|
DB B |
48 |
Y |
P |
|
|
DB C |
02 |
Y |
P |
|
|
DB C |
04 |
Y |
P |
|
|
DB C |
06 |
Y |
P |
|
|
DB C |
08 |
Y |
P |
|
|
DB C |
10 |
Y |
P |
|
|
DB C |
12 |
Y |
P |
|
|
DB C |
14 |
Y |
P |
|
|
DB C |
15 |
Y |
P |
|
|
DB C |
16 |
Y |
P |
|
|
DB C |
17 |
Y |
P |
|
|
DB C |
18 |
Y |
P |
|
|
DB C |
19 |
Y |
P |
|
|
DB C |
20 |
Y |
P |
|
|
DB C |
21 |
Y |
P |
|
|
DB C |
22 |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
1 |
S |
Y |
Y |
Y |
P |
|
|
|
|
2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
3 |
R |
Y |
Y |
Y |
P |
|
|
|
|
4 |
R |
Y |
Y |
Y |
P |
|
|
|
|
5 |
R |
Y |
N |
Y |
F |
FAILED 90 MIN DISCHARGE TEST |
Y |
N |
|
6 |
R |
Y |
Y |
Y |
P |
|
|
|
|
7 |
R |
Y |
Y |
Y |
P |
|
|
|
|
8 |
R |
Y |
Y |
Y |
P |
|
|
|
|
9 |
R |
Y |
N |
Y |
F |
FAILED 90 MIN DISCHARGE TEST |
Y |
N |
|
10 |
R |
Y |
Y |
Y |
P |
|
|
|
|
11 |
R |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
N |
Y |
F |
FAILED 90 MIN DISCHARGE TEST |
Y |
N |
|
13 |
R |
Y |
Y |
Y |
P |
|
|
|
|
14 |
R |
Y |
Y |
Y |
P |
|
|
|
|
15 |
S |
Y |
Y |
Y |
P |
|
|
|
|
16 |
R |
Y |
Y |
Y |
P |
|
|
|
|
17 |
R |
Y |
Y |
Y |
P |
|
|
|
|
18 |
R |
Y |
Y |
Y |
P |
|
|
|
|
19 |
R |
Y |
Y |
Y |
P |
|
|
|
|
20 |
R |
Y |
Y |
Y |
F |
FAILED 90 MIN DISCHARGE TEST |
Y |
N |
|
21 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
10 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
Y |
Y |
Y |
P |
|
|
|
|
13 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
LED downlight |
Y |
Double 36W fluorescent light |
Y |
Single 18W fluorescent light |
Y |
Double 21W fluorescent light |
Y |
Hi-Bay lights |
Y |
LED highbay |
Y |
Recessed emergency light |
Y |
Surface mount emergency lights |
Y |
Exit lights |
Y |
LED panel |
Y |
Stair lights |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
CEILING TILE |
NEW TRAINING ROOM |
6 |
CEILING TILE WATER DAMAGE |
N |
N |
N |
OBSERVATION |
LED PANEL LIGHT |
NEW TRAINING ROOM |
1 |
FAILED TO ILLUMINATE |
Y |
N |
N |
|
TEST AND TAG |
SITE |
50+ |
TEST AND TAG IN-DATE, NEXT TEST DUE 28 APRIL 2024 |
N |
N |
N |
OBSERVATION |
CEILING TILES |
EXISTING TRAINING ROOM |
3 |
CEILING TILES WATER DAMAGE |
N |
N |
N |
OBSERVATION |
EM05 |
STOREROOM ADJACENT KITCHEN AREA |
1 |
FAILED 90 MIN DISCHARGE TEST |
Y |
N |
N |
|
EM12 |
REAR STOREROOM |
1 |
FAILED 90 MIN DISCHARGE TEST |
Y |
N |
N |
|
EM09 |
DOWNSTAIRS REC AREA |
1 |
FAILED 90 MIN DISCHARGE TEST |
Y |
N |
N |
|
EM20 |
UPSTAIRS REC AREA OVER STAIRS |
1 |
FAILED 90 MIN DISCHARGE TEST |
Y |
N |
N |
|
LED PANEL LIGHT |
COMMS ROOM |
1 |
FAILED TO ILLUMINATE |
Y |
N |
N |
|
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 04/11/2023 |
---|
| |
---|
| |