Partner NameSturdie Trade Services
StateVIC
Date of Visit08/05/2023
Technician's NameNathan McBain
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number71196
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICballarat

Location NameBallarat
HTML Block
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB1 09 Y P
DB1 11 Y P
DB1 12 Y P
DB1 15 Y P
DB1 17 Y P
DB1 31 Y P
DB1 32 Y P
DB1 40 Y P
DB1 42 Y P
DB1 44 Y P
DB1 46 Y P
DB1 47 Y P
DB1 48 Y P
DB1 50 Y P
DB1 54 Y P
DB1 57 Y P
DB1A 01 Y P
DB1A 04 Y P
DB1A 05 Y P
DB1A 07 Y P
DB1A 10 Y P
DB1A 13 Y P
DB1A 16 Y P
DB1A 22 Y P
DB1A 27 Y P
DB1A 29 Y P
DB1A 31 Y P
DB1A 32 Y P
DB1A 33 Y P
DB1A 34 Y P
DB1A 35 Y P
DB1A 36 Y P
DB1A 37 Y P
DB1A 38 Y P
DB1A 39 Y P
DB1A 40 Y P
DB1A 41 Y P
DB1A 42 Y P
DB1A 43 Y P
DB1A 44 Y P
DB1A 45 Y P
DB1A 46 Y P
DB1A 47 Y P
DB1A 48 Y P
DB2 20 Y P
DB2 24 Y P
DB2 26 Y P
DB2 28 Y P
DB2 40 Y P
DB2 42 Y P
DB2 44 Y P
DB2 46 Y P
DB2 48 Y P
DB2A 04 Y P
DB2A 06 Y P
DB2A 08 Y P
DB2A 10 Y P
DB2A 12 Y P
DB2A 14 Y P
DB2A 16 Y P
DB2A 18 Y P
DB2A 20 Y P
DB2A 22 Y P
DB2A 24 Y P
DB2A 28 Y P
DB2A 29 Y P
DB2A 30 Y P
DB2A 31 Y P
DB2A 32 Y P
DB2A 33 Y P
DB2A 34 Y P
DB2A 35 Y P
DB2A 36 Y P
DB2A 37 Y P
DB2A 38 Y P
DB2A 39 Y P
DB2A 40 Y P
DB2A 41 Y P
DB2A 42 Y P
DB2A 43 Y P
DB2A 44 Y P
DB2A 45 Y P
DB2A 46 Y P
DB2A 47 Y P
DB2A 48 Y P
SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 Y Y Y P
2 Y Y Y P
3 Y Y Y P
4 Y Y Y P
5 Y Y Y P
6 Y Y Y P
7 Y Y Y P
8 Y Y Y P
9 Y Y Y P
10 Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 Y Y Y P
2 Y Y Y P
3 Y N Y F Failed 90 min discharged test Y N
4 Y N Y F Failed 90 min discharged test Y N
5 Y Y Y P
6 Y Y Y P
7 Y Y Y P
8 Y Y Y P
9 Y Y Y P
10 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Y
Y
Y
Y
Y
Y
Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
DB2A BOH 1 UPON STORE START UP CB 2,4,6 TRIPPING WHICH SUPPLIES DB2A N N N RED PHASE 236V 27.3A, WHITE PHASE 234V 34.2A, BLUE PHASE 236V 37.9A. POSSIBLE IMBALANCE CAUSING CB TO TRIP? ONCE CB RESET STAYS ON WITH NO ISSUE. FURTHER INVESTIGATION REQUIRED. ADDED TO FORTNIGHTLY REPAIRS LIST
CB43 DB2A 1 TRIPPING UPON START UP N TBA TBA MULTIPLE TV DISPLAY ON THE SAME CIRCUIT, NO SPARE CBS IN DB 2A, CABLING CURRENTLY DOUBLED UP AT CB. SOME CIRCUITS NOT LABELED ON DB, POSSIBLY SOME SPARE CIRCUITS , FURTHER INVESTIGATION REQUIRED BEFORE TRADE 2× TECHS. ADDED TO FORTNIGHTLY REPAIRS LIST
CB28 DB2A 1 TRIPPING N N N ADDITIONAL CIRCUIT ADDED FOR SOUNDBARS HOWEVER IC CABLING FOR ALL SOUNDBARS FED FROM THE SAME CIRCUIT, ALTERED IC CABLING, HOPEFULLY ISSUE RESOLVED. HALF SOUNDBARS NOW FED FROM CB45 DB2A OTHER HALF FED FROM CB28 DB2A. ADDED TO FORTNIGHTLY REPAIRS LIST
TEST AND TAG STORE 80+ TEST AND TAG IN-DATE, NEXT TEST DUE 28 FEB 2024 N N N OBSERVATION
CEILING TILES STORE/BOH - LARGE AMOINT OF CEILING TILES HAVE WATER DAMAGE, PREVIOUSLY REPORTED N N N OBSERVATION
LIGHT FITTING MENS TOILET 1 FAILED TO ILLUMINATE Y N N
28W TROFFER LUNCH ROOM 1 FAILED TO ILLUMINATE Y N N
70MM DOWNLIGHTS BOH OLD TV AREA 10 FAILED TO ILLUMINATE N N N ADDED TO FORTNIGHTLY REPAIRS LIST
EX No. 3 DOWNSTAIRES STOREROOM SINGLE MAN DOOR SOUTH 1 FAILED 90MIN BATTERY TEST Y N N
EX No. 4 DOWNSTAIRES STOREROOM SINGLE MAN DOOR NORTH 1 FAILED 90MIN BATTERY TEST Y N N
Site Status SelectorStore now fully compliant
Next Test Due in 6 months08/11/2023