Partner NameBuilt Electrical Australia
StateNSW
Date of Visit10/07/2023
Technician's NamePeter Hay
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0015/0069
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWcasula

Location NameCasula
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
Db18 7 Y P
Db18 8 Y P
Db18 9 Y P
Db18 10 Y P
Db18 11 Y P
Db18 12 Y P
Db18 13 Y P
Db18 14 Y P
Db18 15 Y P
Db18 16 Y P
Db18 17 Y P
Db18 18 Y P
Db18 19 Y P
Db18 20 Y P
Db18 22 Y P
Db18 23 Y P
Db18 25 Y P
Db18 26 Y P
Db18 27 Y P
Db18 28 Y P
Db18 29 Y P
Db18 30 Y P
Db18 31 Y P
Db18 32 Y P
Db18 33 Y P
Db18 34 Y P
Db18 35 Y P
Db18 36 Y P
Db18 37 Y P
Db18 38 Y P
Db18 39 Y P
Db18 41 Y P
Db18 44 Y P
Db18 46 Y P
Db18 48 Y P
Db18 49 Y P
Db18 50 Y P
Db18 51 Y P
Db18 52 Y P
Db18 53 Y P
Db18 54 Y P
Db18 55 Y P
Db18 56 Y P
Db18 57 Y P
Db18 58 Y P
Db18 59 Y P
Db18 60 Y P
Db18 61 Y P
Db18 62 Y P
Db18 63 Y P
Db18 64 Y P
Db18 65 Y P
Db18 67 Y P
Db18 69 Y P
Db18 71 Y P
Dba 1 Y P
Dba 2 Y P
Dba 3 Y P
Dba 4 Y P
Dba 5 Y P
Dba 6 Y P
Dba 7 Y P
Dba 8 Y P
Dba 9 Y P
Dba 11 Y P
Dba 12 Y P
Dba 13 Y P
Dba 14 Y P
Dba 15 Y P
Dba 16 Y P
Dba 17 Y P
Dba 18 Y P
Dba 19 Y P
Dba 20 Y P
Dba 22 Y P
Dba 23 Y P
Dba 24 Y P
Dba 25 Y P
Dba 26 Y P
Dba 28 Y P
Dba 30 Y P
Dba 32 Y P
Dba 34 Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
Db18 1 S - 4ft maintained batten Y Y Y P
Db18 2 S - 4ft maintained batten Y Y Y P
Db18 3 S - 4ft maintained batten Y Y Y P
Db18 4 S - 4ft maintained batten Y N Y F Failed 90 min test Y N
Db18 5 S - 4ft maintained batten Y Y Y P
Db18 6 S - 4ft maintained batten Y Y Y P
Db18 7 S - 4ft maintained batten Y Y Y P
Db18 8 S - 4ft maintained batten Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
Db18 1 Y Y Y P
Db18 2 Y Y Y P
Db18 3 Y Y Y P
Db18 4 Y Y Y P
Db18 5 Y Y Y P
Db18 6 Y Y Y P
Db18 7 Y Y Y P
Db18 8 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
LED high bay ufo Y
4ft LED batten Y
2ft LED batten Y
Slimline wall bay LED light boxes Y
Fluro pelmet battens in kitchen wall bays Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Emergency light test switch BOH 1 No key Y N N
Wall bay Light box drivers Trading floor 3 Faulty Y N N
Emergency Batten #4 1 Failed 90 min test Y N N
Site Status SelectorStore now fully compliant
Next Test Due in 6 months10/01/2024