Partner NameBuilt Electrical Australia
StateNSW
Date of Visit13/07/2023
Technician's NamePeter Hay
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0015/0071
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWcaringbah

Location NameCaringbah
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
Db1 section 1 2 Y P
Db1 section 1 4 Y P
Db1 section 1 6 Y P
Db1 section 1 7,9 Y P
Db1 section 1 8 Y P
Db1 section 1 10 Y P
Db1 section 1 12 Y P
Db1 section 1 14 Y P
Db1 section 1 16 Y P
Db1 section 1 17 Y P
Db1 section 1 18 Y P
Db1 section 1 19 Y P
Db1 section 1 20 Y P
Db1 section 1 21 Y P
Db1 section 1 22 Y P
Db1 section 1 23 Y P
Db1 section 1 24 Y P
Db1 section 1 25 Y P
Db1 section 1 26 Y P
Db1 section 1 27 Y P
Db1 section 1 28 Y P
Db1 section 1 29 Y P
Db1 section 1 30 Y P
Db1 section 1 31 Y P
Db1 section 1 32 Y P
Db1 section 1 33 Y P
Db1 section 1 34 Y P
Db1 section 1 35 Y P
Db1 section 1 37 Y P
Db1 section 1 39 Y P
Db1 section 1 41 Y P
Db1 section 1 43 Y P
Db1 section 1 45 Y P
Db1 section 1 48 Y P
Db1 section 2 1 Y P
Db1 section 2 3 Y P
Db2 section 1 1 Y P
Db2 section 1 2 Y P
Db2 section 1 3 Y P
Db2 section 1 4 Y P
Db2 section 1 5 Y P
Db2 section 1 6 Y P
Db2 section 1 7 Y P
Db2 section 1 8 Y P
Db2 section 1 9 Y P
Db2 section 1 10 Y P
Db2 section 1 11 Y P
Db2 section 1 12 Y P
Db2 section 1 13 Y P
Db2 section 1 14 Y P
Db2 section 1 15 Y P
Db2 section 1 16 Y P
Db2 section 1 17 Y P
Db2 section 1 18 Y P
Db2 section 1 19 Y P
Db2 section 1 20 Y P
Db2 section 1 21 Y P
Db2 section 1 22 Y P
Db2 section 1 23 Y P
Db2 section 1 24 Y P
Db2 section 1 25 Y P
Db2 section 1 26 Y P
Db2 section 1 27 Y P
Db2 section 1 28 Y P
Db2 section 1 29 Y P
Db2 section 1 30 Y P
Db2 section 1 31 Y P
Db2 section 1 32 Y P
Db2 section 1 33 Y P
Db2 section 1 34 Y P
Db2 section 1 36 Y P
Db2 section 1 37 Y P
Db2 section 1 39 Y P
Db2 section 1 40 Y P
Db2 section 1 42 Y P
Db2 section 1 44 Y P
Db2 section 1 46 Y P
Db2 section 1 49 Y P
Db2 section 1 50 Y P
Db2 section 1 51 Y P
Db2 section 1 54 Y P
Db2 section 1 56 Y P
Db2 section 1 58 Y P
Db2 section 1 60 Y P
Db2 section 2 1 Y P
Db2 section 2 2 Y P
Db2 section 2 3 Y P
Db2 section 2 4 Y P
Db2 section 2 5 Y P
Db2 section 2 6 Y P
Db2 section 2 7 Y P
Db2 section 2 8 Y P
Db2 section 2 9 Y P
Db2 section 2 10 Y P
Db2 section 2 11 Y P
Db2 section 2 12 Y P
Db2 section 2 13 Y P
Db2 section 2 15 Y P
Db3 section 1 1 Y P
Db3 section 1 2 Y P
Db3 section 1 3 Y P
Db3 section 1 4 Y P
Db3 section 1 5 Y P
Db3 section 1 6 Y P
Db3 section 1 7 Y P
Db3 section 1 8 Y P
Db3 section 1 9 Y P
Db3 section 1 10 Y P
Db3 section 1 11 Y P
Db3 section 1 11 Y P
Db3 section 1 13 Y P
Db3 section 1 14 Y P
Db3 section 1 15 Y P
Db3 section 1 16 Y P
Db3 section 1 17 Y P
Db3 section 1 18 Y P
Db3 section 1 19 Y P
Db3 section 1 20 Y P
Db3 section 1 21 Y P
Db3 section 1 22 Y P
Db3 section 1 23 Y P
Db3 section 1 24 Y P
Db3 section 1 25 Y P
Db3 section 1 26 Y P
Db3 section 1 27 Y P
Db3 section 1 28 Y P
Db3 section 1 29 Y P
Db3 section 1 30 Y P
Db3 section 1 31 Y P
Db3 section 1 32 Y P
Db3 section 1 33 Y P
Db3 section 1 34 Y P
Db3 section 1 35 Y P
Db3 section 1 36 Y P
Db3 section 1 37 Y P
Db3 section 1 38 Y P
Db3 section 1 39 Y P
Db3 section 1 40 Y P
Db3 section 1 41 Y P
Db3 section 1 42 Y P
Db3 section 1 43 Y P
Db3 section 1 45 Y P
Db3 section 1 47 Y P
Db3 section 1 49 Y P
Db3 section 1 51 Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 - batten S Y N Y F Failed 90 min test Y N
2 S Y Y Y P
3 - batten S Y N Y F Failed 90 min test Y N
4 S Y Y Y P
5 S Y Y Y P
6 S Y Y Y P
7 S Y Y Y P
8 S Y Y Y P
9 S Y Y Y P
10 S Y Y Y P
11 R Y Y Y P
12 R Y Y Y P
13 R N Y Y F Low light output Y N
14 R Y Y Y P
15 S Y Y Y P
16 S Y Y Y P
17 S Y Y Y P
18 S Y Y Y P
19 S Y Y Y P
20 S Y Y Y P
21 S Y Y Y P
22 S Y Y Y P
23 S Y Y Y P
24 S Y Y Y P
25 S Y Y Y P
26 R Y Y Y P
27 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 Y Y Y P
2 Y Y Y P
3 Y Y Y P
4 N N N F Fitting faulty Y N
5 Y Y Y P
6 Y Y Y P
7 Y Y Y P
8 Y Y Y P Partially obstructed by wall bay Light box. N N
9 Y Y Y P
10 Y Y Y P
11 Y Y Y P
12 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Hi Bay ufo Y
4ft batten Y
200mm downlight (foyer) Y
92mm downlight Y
Vibe 900mm led Iinkable battens (wall bay Light boxes) Y
Fluro wall bay light boxes Y
92mm downlight Y
165mm downlight (toilets) Y
Carpark pole lights Y
Bc lamps 4w 6500k (external entrance) Y
External rectangular wall lights half moon Y
Square recessed jumbo lights external entrance awning Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
200mm downlight Foyer 1 Flickering Y N N
165mm downlight Female toilet 1 Not illuminated Y N N
92mm downlight Technika wall bay 1 Not illuminated Y N N
Light boxes Wallbay trading floor 3 Not illuminated N TBA TBA Unable to access the GPO. 2 x techs required to pull apart light boxes and gain access. Added to fortnightly repairs list.
Recessed emergency light #13 1 Very Dim Y N N
Surface mount emergency batten #1 1 Failed 90 min test Y N N
Surface mount emergency batten #3 1 Failed 90 min test Y N N
Exit light #4 1 Faulty fitting Y N N
Exit light #8 1 Partially hidden by wall bay light box. N TBA TBA Recommend removing the wall bay light box. The shelf above needs to be disconnected to remove light box. 2 x techs required. Added to fortnightly repairs list.
Site Status SelectorStore now fully compliant
Next Test Due in 6 months12/01/2024