Partner Name Built Electrical Australia State NSW Date of Visit 13/07/2023 Technician's Name Peter Hay Which Company are you working for? Sturdie Trade Services Sturdie Job Number 50F0015/0071 Email Email hidden; Javascript is required. The Good Guys Site in NSW caringbah
Location Name Caringbah HTML Block
Test Period 12 Monthly (90 minutes) Push Button Test Carry out push button test for correct operation Carry out push button test for correct operation HTML Block Carry out test with RCD Tester Carry out push button test and record the results below. RCD Details (Initial/12 Months) Distribution Board No.
Circuit No.
Push Button (YorN)
Pass / Fail (PorF)
Fault?
Repaired on Site (YorN)
Db1 section 1
2
Y
P
Db1 section 1
4
Y
P
Db1 section 1
6
Y
P
Db1 section 1
7,9
Y
P
Db1 section 1
8
Y
P
Db1 section 1
10
Y
P
Db1 section 1
12
Y
P
Db1 section 1
14
Y
P
Db1 section 1
16
Y
P
Db1 section 1
17
Y
P
Db1 section 1
18
Y
P
Db1 section 1
19
Y
P
Db1 section 1
20
Y
P
Db1 section 1
21
Y
P
Db1 section 1
22
Y
P
Db1 section 1
23
Y
P
Db1 section 1
24
Y
P
Db1 section 1
25
Y
P
Db1 section 1
26
Y
P
Db1 section 1
27
Y
P
Db1 section 1
28
Y
P
Db1 section 1
29
Y
P
Db1 section 1
30
Y
P
Db1 section 1
31
Y
P
Db1 section 1
32
Y
P
Db1 section 1
33
Y
P
Db1 section 1
34
Y
P
Db1 section 1
35
Y
P
Db1 section 1
37
Y
P
Db1 section 1
39
Y
P
Db1 section 1
41
Y
P
Db1 section 1
43
Y
P
Db1 section 1
45
Y
P
Db1 section 1
48
Y
P
Db1 section 2
1
Y
P
Db1 section 2
3
Y
P
Db2 section 1
1
Y
P
Db2 section 1
2
Y
P
Db2 section 1
3
Y
P
Db2 section 1
4
Y
P
Db2 section 1
5
Y
P
Db2 section 1
6
Y
P
Db2 section 1
7
Y
P
Db2 section 1
8
Y
P
Db2 section 1
9
Y
P
Db2 section 1
10
Y
P
Db2 section 1
11
Y
P
Db2 section 1
12
Y
P
Db2 section 1
13
Y
P
Db2 section 1
14
Y
P
Db2 section 1
15
Y
P
Db2 section 1
16
Y
P
Db2 section 1
17
Y
P
Db2 section 1
18
Y
P
Db2 section 1
19
Y
P
Db2 section 1
20
Y
P
Db2 section 1
21
Y
P
Db2 section 1
22
Y
P
Db2 section 1
23
Y
P
Db2 section 1
24
Y
P
Db2 section 1
25
Y
P
Db2 section 1
26
Y
P
Db2 section 1
27
Y
P
Db2 section 1
28
Y
P
Db2 section 1
29
Y
P
Db2 section 1
30
Y
P
Db2 section 1
31
Y
P
Db2 section 1
32
Y
P
Db2 section 1
33
Y
P
Db2 section 1
34
Y
P
Db2 section 1
36
Y
P
Db2 section 1
37
Y
P
Db2 section 1
39
Y
P
Db2 section 1
40
Y
P
Db2 section 1
42
Y
P
Db2 section 1
44
Y
P
Db2 section 1
46
Y
P
Db2 section 1
49
Y
P
Db2 section 1
50
Y
P
Db2 section 1
51
Y
P
Db2 section 1
54
Y
P
Db2 section 1
56
Y
P
Db2 section 1
58
Y
P
Db2 section 1
60
Y
P
Db2 section 2
1
Y
P
Db2 section 2
2
Y
P
Db2 section 2
3
Y
P
Db2 section 2
4
Y
P
Db2 section 2
5
Y
P
Db2 section 2
6
Y
P
Db2 section 2
7
Y
P
Db2 section 2
8
Y
P
Db2 section 2
9
Y
P
Db2 section 2
10
Y
P
Db2 section 2
11
Y
P
Db2 section 2
12
Y
P
Db2 section 2
13
Y
P
Db2 section 2
15
Y
P
Db3 section 1
1
Y
P
Db3 section 1
2
Y
P
Db3 section 1
3
Y
P
Db3 section 1
4
Y
P
Db3 section 1
5
Y
P
Db3 section 1
6
Y
P
Db3 section 1
7
Y
P
Db3 section 1
8
Y
P
Db3 section 1
9
Y
P
Db3 section 1
10
Y
P
Db3 section 1
11
Y
P
Db3 section 1
11
Y
P
Db3 section 1
13
Y
P
Db3 section 1
14
Y
P
Db3 section 1
15
Y
P
Db3 section 1
16
Y
P
Db3 section 1
17
Y
P
Db3 section 1
18
Y
P
Db3 section 1
19
Y
P
Db3 section 1
20
Y
P
Db3 section 1
21
Y
P
Db3 section 1
22
Y
P
Db3 section 1
23
Y
P
Db3 section 1
24
Y
P
Db3 section 1
25
Y
P
Db3 section 1
26
Y
P
Db3 section 1
27
Y
P
Db3 section 1
28
Y
P
Db3 section 1
29
Y
P
Db3 section 1
30
Y
P
Db3 section 1
31
Y
P
Db3 section 1
32
Y
P
Db3 section 1
33
Y
P
Db3 section 1
34
Y
P
Db3 section 1
35
Y
P
Db3 section 1
36
Y
P
Db3 section 1
37
Y
P
Db3 section 1
38
Y
P
Db3 section 1
39
Y
P
Db3 section 1
40
Y
P
Db3 section 1
41
Y
P
Db3 section 1
42
Y
P
Db3 section 1
43
Y
P
Db3 section 1
45
Y
P
Db3 section 1
47
Y
P
Db3 section 1
49
Y
P
Db3 section 1
51
Y
P
THERMOGRAPHIC TEST RESULTS
THERMOGRAPHIC TEST RESULTS
SF43 Exit/Emergency
SF43 EXIT/EMERGENCY LIGHTING
Exit/Emergency Light Checklist Check there has been no power interruption for at least 16 hours prior to test Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes) Re-instate power to luminaries and check that the battery charge operation indicator functions correctly Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number Exit/Emergency Light Checklist Check there has been no power interruption for at least 16 hours prior to test Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes) Re-instate power to luminaries and check that the battery charge operation indicator functions correctly Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires. Timers Check timers for correct operation and timing Switched Socket Outlets Carry out visual check on SSOs for signs of misuse, blackening or deterioration Check and report any outlets with multiple power boards overloading Ensure any power boards used have an integral over-current limiter HTML Block EMERGENCY LIGHTS Distribution Board No.
ID No.
Surface mounted or recessed? (SorR)
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
1 - batten
S
Y
N
Y
F
Failed 90 min test
Y
N
2
S
Y
Y
Y
P
3 - batten
S
Y
N
Y
F
Failed 90 min test
Y
N
4
S
Y
Y
Y
P
5
S
Y
Y
Y
P
6
S
Y
Y
Y
P
7
S
Y
Y
Y
P
8
S
Y
Y
Y
P
9
S
Y
Y
Y
P
10
S
Y
Y
Y
P
11
R
Y
Y
Y
P
12
R
Y
Y
Y
P
13
R
N
Y
Y
F
Low light output
Y
N
14
R
Y
Y
Y
P
15
S
Y
Y
Y
P
16
S
Y
Y
Y
P
17
S
Y
Y
Y
P
18
S
Y
Y
Y
P
19
S
Y
Y
Y
P
20
S
Y
Y
Y
P
21
S
Y
Y
Y
P
22
S
Y
Y
Y
P
23
S
Y
Y
Y
P
24
S
Y
Y
Y
P
25
S
Y
Y
Y
P
26
R
Y
Y
Y
P
27
R
Y
Y
Y
P
HTML Block EXIT LIGHTS Distribution Board No.
ID No.
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
1
Y
Y
Y
P
2
Y
Y
Y
P
3
Y
Y
Y
P
4
N
N
N
F
Fitting faulty
Y
N
5
Y
Y
Y
P
6
Y
Y
Y
P
7
Y
Y
Y
P
8
Y
Y
Y
P
Partially obstructed by wall bay Light box.
N
N
9
Y
Y
Y
P
10
Y
Y
Y
P
11
Y
Y
Y
P
12
Y
Y
Y
P
SF44 General Lighting & Works
SF44 GENERAL LIGHTING & WORKS
General Checklist Check correct operation of all luminaries Report on any faulty luminaries/control gear Provide costing to repair/replace HTML Block General Operation/Additional items Check with Store Manager to ensure there are no other issues Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard HTML Block Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au Yes Lighting Report Description of all lighting installed in store (eg. 21w bare batten)
Existing (YorN)
Hi Bay ufo
Y
4ft batten
Y
200mm downlight (foyer)
Y
92mm downlight
Y
Vibe 900mm led Iinkable battens (wall bay Light boxes)
Y
Fluro wall bay light boxes
Y
92mm downlight
Y
165mm downlight (toilets)
Y
Carpark pole lights
Y
Bc lamps 4w 6500k (external entrance)
Y
External rectangular wall lights half moon
Y
Square recessed jumbo lights external entrance awning
Y
Are there any Warranty items needing to be repaired? No LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
200mm downlight
Foyer
1
Flickering
Y
N
N
165mm downlight
Female toilet
1
Not illuminated
Y
N
N
92mm downlight
Technika wall bay
1
Not illuminated
Y
N
N
Light boxes
Wallbay trading floor
3
Not illuminated
N
TBA
TBA
Unable to access the GPO. 2 x techs required to pull apart light boxes and gain access. Added to fortnightly repairs list.
Recessed emergency light
#13
1
Very Dim
Y
N
N
Surface mount emergency batten
#1
1
Failed 90 min test
Y
N
N
Surface mount emergency batten
#3
1
Failed 90 min test
Y
N
N
Exit light
#4
1
Faulty fitting
Y
N
N
Exit light
#8
1
Partially hidden by wall bay light box.
N
TBA
TBA
Recommend removing the wall bay light box. The shelf above needs to be disconnected to remove light box. 2 x techs required. Added to fortnightly repairs list.
Site Status Selector Store now fully compliant Next Test Due in 6 months 12/01/2024