Partner Name | Built Electrical Australia |
---|
State | NSW |
---|
Date of Visit | 28/07/2023 |
---|
Technician's Name | Peter Hay |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0015/0070 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in NSW | marsden_park |
---|
|
|
---|
Location Name | Marsden Park |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Initial/12 Months) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
Dbt12a |
1 |
Y |
P |
|
|
Dbt12a |
2 |
Y |
P |
|
|
Dbt12a |
3 |
Y |
P |
|
|
Dbt12a |
4 |
Y |
P |
|
|
Dbt12a |
5 |
Y |
P |
|
|
Dbt12a |
6 |
Y |
P |
|
|
Dbt12a |
7 |
Y |
P |
|
|
Dbt12a |
8 |
Y |
P |
|
|
Dbt12a |
9 |
Y |
P |
|
|
Dbt12a |
10 |
Y |
P |
|
|
Dbt12a |
11 |
Y |
P |
|
|
Dbt12a |
12 |
Y |
P |
|
|
Dbt12a |
13 |
Y |
P |
|
|
Dbt12a |
15 |
Y |
P |
|
|
Dbt12a |
17 |
Y |
P |
|
|
Dbt12a |
19 |
Y |
P |
|
|
Dbt12a |
21 |
Y |
P |
|
|
Dbt12a |
22 |
Y |
P |
|
|
Dbt12a |
23 |
Y |
P |
|
|
Dbt12a |
24 |
Y |
P |
|
|
Dbt12a |
25 |
Y |
P |
|
|
Dbt12a |
27 |
Y |
P |
|
|
Dbt12a |
29 |
Y |
P |
|
|
Dbt12a |
31 |
Y |
P |
|
|
Dbt12a |
37 |
Y |
P |
|
|
Dbt12a |
51 |
Y |
P |
|
|
Dbt12a |
53 |
Y |
P |
|
|
Dbt12a |
55 |
Y |
P |
|
|
Dbt12b |
1 |
Y |
P |
|
|
Dbt12b |
2 |
Y |
P |
|
|
Dbt12b |
3 |
Y |
P |
|
|
Dbt12b |
4 |
Y |
P |
|
|
Dbt12b |
5 |
Y |
P |
|
|
Dbt12b |
6 |
Y |
P |
|
|
Dbt12b |
7 |
Y |
P |
|
|
Dbt12b |
8 |
Y |
P |
|
|
Dbt12b |
9 |
Y |
P |
|
|
Dbt12b |
10 |
Y |
P |
|
|
Dbt12b |
11 |
Y |
P |
|
|
Dbt12b |
12 |
Y |
P |
|
|
Dbt12b |
13 |
Y |
P |
|
|
Dbt12b |
14 |
Y |
P |
|
|
Dbt12b |
15 |
Y |
P |
|
|
Dbt12b |
16 |
Y |
P |
|
|
Dbt12b |
17 |
Y |
P |
|
|
Dbt12b |
18 |
Y |
P |
|
|
Dbt12b |
19 |
Y |
P |
|
|
Dbt12b |
20 |
Y |
P |
|
|
Dbt12b |
21 |
Y |
P |
|
|
Dbt12b |
25 |
Y |
P |
|
|
Dbt12b |
27 |
Y |
P |
|
|
Dbt12b |
28 |
Y |
P |
|
|
Dbt12b |
29 |
Y |
P |
|
|
Dbt12b |
30 |
Y |
P |
|
|
Dbt12b |
31 |
Y |
P |
|
|
Dbt12b |
32 |
Y |
P |
|
|
Dbt12b |
33 |
Y |
P |
|
|
Dbt12b |
34 |
Y |
P |
|
|
Dbt12b |
36 |
Y |
P |
|
|
Dbt12c |
37 |
Y |
P |
|
|
Dbt12c |
38 |
Y |
P |
|
|
Dbt12c |
39 |
Y |
P |
|
|
Dbt12c |
40 |
Y |
P |
|
|
Dbt12c |
41 |
Y |
P |
|
|
Dbt12c |
42 |
Y |
P |
|
|
Dbt12c |
43 |
Y |
P |
|
|
Dbt12c |
44 |
Y |
P |
|
|
Dbt12c |
45 |
Y |
P |
|
|
Dbt12c |
46 |
Y |
P |
|
|
Dbt12c |
47 |
Y |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
Dbt12a |
1 |
S |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
3 |
S |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
4 |
S |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
5 |
S |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
7 |
S |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
8 |
S |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
9 |
R |
Y |
N |
N |
F |
Failed 90 min test |
Y |
N |
Dbt12a |
10 |
R |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
11 |
R |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
12 |
R |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
13 |
R |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
14 |
R |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
16 |
R |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
Dbt12a |
1 |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
2 |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
3 |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
4 |
Y |
N |
Y |
F |
Failed 90 min test |
Y |
N |
Dbt12a |
5 |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
6 |
Y |
N |
Y |
F |
Failed 90 min test |
Y |
N |
Dbt12a |
7 |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
8 |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
9 |
Y |
Y |
Y |
P |
|
|
|
Dbt12a |
10 |
Y |
N |
Y |
F |
Failed 90 min test |
Y |
N |
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
High Bay Ufo |
Y |
1200x300mm LED panel |
Y |
2 x 28w recessed troffer |
Y |
4ft batten |
Y |
92mm LED downlight |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
2x28w fluro troffer light |
Office area |
4 |
Not illuminated |
Y |
N |
N |
|
84mm 360 degree 240v sensor |
Offices |
2 |
Faulty |
Y |
N |
N |
|
28W fluro tubes |
Stockroom adj sales counter |
4 |
Not illuminated/partially illuminated |
Y |
N |
N |
|
Dbt12a & dbt12b |
BOH |
2 |
Control box handles loose |
Y |
N |
N |
|
Recessed emergency light |
#9 |
1 |
Failed 90 min test |
Y |
N |
N |
|
Exit light |
#4 |
1 |
Failed 90 min test |
Y |
N |
N |
|
Exit light |
#6 |
1 |
Failed 90 min test |
Y |
N |
N |
|
Exit light |
#30 |
1 |
Failed 90 min test |
Y |
N |
N |
|
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 17/01/2024 |
---|
| |
---|
| |