Partner NameBuilt Electrical Australia
StateNSW
Date of Visit28/07/2023
Technician's NamePeter Hay
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0015/0070
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWmarsden_park

Location NameMarsden Park
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
Dbt12a 1 Y P
Dbt12a 2 Y P
Dbt12a 3 Y P
Dbt12a 4 Y P
Dbt12a 5 Y P
Dbt12a 6 Y P
Dbt12a 7 Y P
Dbt12a 8 Y P
Dbt12a 9 Y P
Dbt12a 10 Y P
Dbt12a 11 Y P
Dbt12a 12 Y P
Dbt12a 13 Y P
Dbt12a 15 Y P
Dbt12a 17 Y P
Dbt12a 19 Y P
Dbt12a 21 Y P
Dbt12a 22 Y P
Dbt12a 23 Y P
Dbt12a 24 Y P
Dbt12a 25 Y P
Dbt12a 27 Y P
Dbt12a 29 Y P
Dbt12a 31 Y P
Dbt12a 37 Y P
Dbt12a 51 Y P
Dbt12a 53 Y P
Dbt12a 55 Y P
Dbt12b 1 Y P
Dbt12b 2 Y P
Dbt12b 3 Y P
Dbt12b 4 Y P
Dbt12b 5 Y P
Dbt12b 6 Y P
Dbt12b 7 Y P
Dbt12b 8 Y P
Dbt12b 9 Y P
Dbt12b 10 Y P
Dbt12b 11 Y P
Dbt12b 12 Y P
Dbt12b 13 Y P
Dbt12b 14 Y P
Dbt12b 15 Y P
Dbt12b 16 Y P
Dbt12b 17 Y P
Dbt12b 18 Y P
Dbt12b 19 Y P
Dbt12b 20 Y P
Dbt12b 21 Y P
Dbt12b 25 Y P
Dbt12b 27 Y P
Dbt12b 28 Y P
Dbt12b 29 Y P
Dbt12b 30 Y P
Dbt12b 31 Y P
Dbt12b 32 Y P
Dbt12b 33 Y P
Dbt12b 34 Y P
Dbt12b 36 Y P
Dbt12c 37 Y P
Dbt12c 38 Y P
Dbt12c 39 Y P
Dbt12c 40 Y P
Dbt12c 41 Y P
Dbt12c 42 Y P
Dbt12c 43 Y P
Dbt12c 44 Y P
Dbt12c 45 Y P
Dbt12c 46 Y P
Dbt12c 47 Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
Dbt12a 1 S Y Y Y P
Dbt12a 2 S Y Y Y P
Dbt12a 3 S Y Y Y P
Dbt12a 4 S Y Y Y P
Dbt12a 5 S Y Y Y P
Dbt12a 6 S Y Y Y P
Dbt12a 7 S Y Y Y P
Dbt12a 8 S Y Y Y P
Dbt12a 9 R Y N N F Failed 90 min test Y N
Dbt12a 10 R Y Y Y P
Dbt12a 11 R Y Y Y P
Dbt12a 12 R Y Y Y P
Dbt12a 13 R Y Y Y P
Dbt12a 14 R Y Y Y P
Dbt12a 15 R Y Y Y P
Dbt12a 16 R Y Y Y P
Dbt12a 17 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
Dbt12a 1 Y Y Y P
Dbt12a 2 Y Y Y P
Dbt12a 3 Y Y Y P
Dbt12a 4 Y N Y F Failed 90 min test Y N
Dbt12a 5 Y Y Y P
Dbt12a 6 Y N Y F Failed 90 min test Y N
Dbt12a 7 Y Y Y P
Dbt12a 8 Y Y Y P
Dbt12a 9 Y Y Y P
Dbt12a 10 Y N Y F Failed 90 min test Y N
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
High Bay Ufo Y
1200x300mm LED panel Y
2 x 28w recessed troffer Y
4ft batten Y
92mm LED downlight Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
2x28w fluro troffer light Office area 4 Not illuminated Y N N
84mm 360 degree 240v sensor Offices 2 Faulty Y N N
28W fluro tubes Stockroom adj sales counter 4 Not illuminated/partially illuminated Y N N
Dbt12a & dbt12b BOH 2 Control box handles loose Y N N
Recessed emergency light #9 1 Failed 90 min test Y N N
Exit light #4 1 Failed 90 min test Y N N
Exit light #6 1 Failed 90 min test Y N N
Exit light #30 1 Failed 90 min test Y N N
Site Status SelectorStore now fully compliant
Next Test Due in 6 months17/01/2024