Partner NameBuilt Electrical Australia
StateNSW
Date of Visit14/08/2023
Technician's NamePeter Hay
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0015/0080
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWartarmon

Location NameArtarmon
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
Db1 1 Y P
Db1 3 Y P
Db1 5 Y P
Db1 7 Y P
Db1 9 Y P
Db1 11 Y P
Db1 13 Y P
Db1 15 Y P
Db1 17 Y P
Db1 19 Y P
Db1 20 Y P
Db1 21 Y P
Db1 22 Y P
Db1 23 Y P
Db1 24 Y P
Db1 25 Y P
Db1 26 Y P
Db1 27 Y P
Db1 28 Y P
Db1 29 Y P
Db1 30 Y P
Db1 31 Y P
Db1 32 Y P
Db1 33 Y P
Db1 34 Y P
Db1 35 Y P
Db1 36 Y P
Db1 37 Y P
Db1 38 Y P
Db1 39 Y P
Db1 40 Y P
Db1 41 Y P
Db1 42 Y P
Db1 43 Y P
Db1 44 Y P
Db1 45 Y P
Db1 46 Y P
Db1 47 Y P
Db1 49 Y P
Db1 51 Y P
Db1 53 Y P
Db1 55 Y P
Db1 56 Y P
Db1 57 Y P
Db1 58 Y P
Db1 59 Y P
Db1 60 Y P
Db1 61 Y P
Db1 63 Y P
Db1 64 Y P
Db1 65 Y P
Db1 66 Y P
Db1 67 Y P
Db1 68 Y P
Db1 69 Y P
Db1 70 Y P
Db1 71 Y P
Db1 72 Y P
Dbt-ug-5 1 Y P
Dbt-ug-5 3 Y P
Dbt-ug-5 4 Y P
Dbt-ug-5 6 Y P
Dbt-ug-5 8 Y P
Dbt-ug-5 10 Y P
Dbt-ug-5 12 Y P
Dbt-ug-5 14 Y P
Dbt-ug-5 16 Y P
Dbt-ug-5 18 Y P
Dbt-ug-5 20 Y P
Dbt-ug-5 22 Y P
Dbt-ug-5 24 Y P
Dbt-ug-5 26 Y P
Dbt-ug-5 28 Y P
Dbt-ug-5.1 1 Y P
Dbt-ug-5.1 2 Y P
Dbt-ug-5.1 3 Y P
Dbt-ug-5.1 4 Y P
Dbt-ug-5.1 5 Y P
Dbt-ug-5.1 6 Y P
Dbt-ug-5.1 7 Y P
Dbt-ug-5.1 9 Y P
Dbt-ug-5.1 10,12 Y P
Dbt-ug-5.1 11 Y P
Dbt-ug-5.1 13 Y P
Dbt-ug-5.1 15 Y P
Dbt-ug-5.1 17 Y P
Dbt-ug-5.1 19 Y P
Dbt-ug-5.1 21 Y P
Dbt-ug-5.1 23 Y P
Dbt-ug-5.1 25 Y P
Dbt-ug-5.1 27 Y P
Dbt-ug-5.1 29 Y P
Dbt-ug-5.1 31 Y P
Dbt-ug-5.1 33 Y P
Dbt-ug-5.1 35 Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
HTML Block
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
High Bay ufo's Y
70mm 240V tri LED downlights Y
Round shop lights Y
4ft battens Y
160mm (approx downlights) Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
70mm downlights TV area 27 Not illuminated N Y TBA Please refer to quote #143 (TGG ticket 1817807)
High bays Trading floor & upper ware house 6 Not illuminated N Y TBA Please refer to quote #143 (TGG ticket 1817807)
LG washing machine display Front of store 1 Fault causing RCD to trip N N N Left display unplugged. Supplier funded stand, please contact vendor to repair.
Site Status SelectorStore now fully compliant
Next Test Due in 6 months14/02/2024