Partner NameSturdie Trade Services
StateVIC
Date of Visit31/08/2023
Technician's NameAmazigh Tari
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0017/0092
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICdandenong

Location NameDandenong
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
Db-1 1 Y P
Db-1 3 Y P
Db-1 4 Y P
Db-1 5 Y P
Db-1 6 Y P
Db-1 7 Y P
Db-1 8 Y P
Db-1 9 Y P
Db-1 10 Y P
Db-1 11 Y P
Db-1 12 Y P
Db-1 13 Y P
Db-1 14 Y P
Db-1 15 Y P
Db-1 16 Y P
Db-1 17 Y P
Db-1 18 Y P
Db-1 19 Y P
Db-1 20 Y P
Db-1 21 Y P
Db-1 22 Y P
Db-1 23 Y P
Db-1 24 Y P
Db-1 25 Y P
Db-1 26 Y P
Db-1 27 Y P
Db-1 28 Y P
Db-1 29 Y P
Db-1 30 Y P
Db-1 31 Y P
Db-1 32 Y P
Db-1 33 Y P
Db-1 34 Y P
Db-1 35 Y P
Db-1 36 Y P
Db-1 37 Y P
Db-1 38 Y P
Db-1 39 Y P
Db-1 40 Y P
Db-1 43 Y P
Db-1 45 Y P
Db-1 47 Y P
FITOUT DB 1 Y P
FITOUT DB 2 Y P
FITOUT DB 3 Y P
FITOUT DB 4 Y P
FITOUT DB 5 Y P
FITOUT DB 6 Y P
FITOUT DB 7 Y P
FITOUT DB 8 Y P
FITOUT DB 9 Y P
FITOUT DB 10 Y P
FITOUT DB 11 Y P
FITOUT DB 12 Y P
FITOUT DB 13 Y P
FITOUT DB 14 Y P
FITOUT DB 15 Y P
FITOUT DB 16 Y P
FITOUT DB 17 Y P
FITOUT DB 18 Y P
FITOUT DB 19 Y P
FITOUT DB 20 Y P
FITOUT DB 49 Y P
FITOUT DB 50 Y P
FITOUT DB 51 Y P
FITOUT DB 52 Y P
FITOUT DB 53 Y P
FITOUT DB 54 Y P
FITOUT DB 55 Y P
FITOUT DB 56 Y P
FITOUT DB 57 Y P
FITOUT DB 58 Y P
FITOUT DB 59 Y P
FITOUT DB 60 Y P
FITOUT DB 61 Y P
FITOUT DB 62 Y P
FITOUT DB 63 Y P
FITOUT DB 64 Y P
FITOUT DB 65 Y P
FITOUT DB 66 Y P
FITOUT DB 67 Y P
FITOUT DB 68 Y P
FITOUT DB 69 Y P
FITOUT DB 70 Y P
FITOUT DB 71 Y P
FITOUT DB 72 Y P
FITOUT DB 73 Y P
FITOUT DB 74 Y P
FITOUT DB 75 Y P
FITOUT DB 76 Y P
FITOUT DB 77 Y P
FITOUT DB 78 Y P
FITOUT DB 79 Y P
FITOUT DB 80 Y P
FITOUT DB 81 Y P
FITOUT DB 82 Y P
FITOUT DB 83 Y P
FITOUT DB 84 Y P
FITOUT DB 85 Y P
FITOUT DB 86 Y P
FITOUT DB 87 Y P
FITOUT DB 88 Y P
FITOUT DB 89 Y P
FITOUT DB 90 Y P
FITOUT DB 91 Y P
FITOUT DB 92 Y P
FITOUT DB 93 Y P
FITOUT DB 95 Y P
FITOUT DB 97 Y P
FITOUT DB 99 Y P
FITOUT DB 106 Y P
FITOUT DB 108 Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
FITOUT DB 2 S Y Y Y P
FITOUT DB 3 S Y Y Y P
FITOUT DB 4 S Y Y Y P
FITOUT DB 6 S Y Y Y P
FITOUT DB 7 S Y Y Y P
FITOUT DB 8 S Y Y Y P
FITOUT DB 10 S Y Y Y P
FITOUT DB 12 S Y Y Y P
FITOUT DB 13 S Y Y Y P
FITOUT DB 14 S Y Y Y P
FITOUT DB 16 S Y Y Y P
FITOUT DB 17 S Y Y Y P
FITOUT DB 1819 S Y Y Y P
FITOUT DB 19 S Y Y Y P
FITOUT DB 20 S Y Y Y P
FITOUT DB 21 S Y Y Y P
FITOUT DB 22 S Y Y Y P
FITOUT DB 23 S Y Y Y P
FITOUT DB 24 S Y Y Y P
FITOUT DB 28 S Y Y Y P
FITOUT DB 29 S Y Y Y P
FITOUT DB 30 S Y Y Y P
FITOUT DB 32 S Y Y Y P
FITOUT DB 33 S Y Y Y P
FITOUT DB 34 S Y Y Y P
FITOUT DB 41 R Y Y Y P
FITOUT DB 42 R Y Y Y P
FITOUT DB 43 R Y Y Y P
FITOUT DB 44 R Y Y Y P
FITOUT DB 45 R Y Y Y P
FITOUT DB 46 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
FITOUT DB 1 Y Y Y P
FITOUT DB 5 Y Y Y P
FITOUT DB 9 Y Y Y P
FITOUT DB 11 Y Y Y P
FITOUT DB 15 Y Y Y P
FITOUT DB 25 Y Y Y P
FITOUT DB 26 Y Y Y P
FITOUT DB 27 Y Y Y P
FITOUT DB 31 Y Y Y P
FITOUT DB 35 Y Y Y P
FITOUT DB 36 Y Y Y P
FITOUT DB 37 Y Y Y P
FITOUT DB 38 Y Y Y P
FITOUT DB 39 Y Y Y P
FITOUT DB 40 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Hibay lights Y
LED downlights Y
T5 twin batten lights Y
LED linkables Y
LED external light globes Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Hibay lights Fridges, cooktops, hair cooktops, BOH 4 Failed to illuminate N N N Added to fortnightly repairs list
Test and tag Store 80+ Tested 04/05/23 due on 04/05/24 N N N Observation
LED Downlight Downstairs toilet 1 Failed to illuminate Y N N
LED strip Behind main counter 1 Flickers when illuminated Y N N Replaced with 3 x LED Linkables
Motion detector Upstairs lunchroom 1 Fails to activate when triggered. Staff must manually override using switch Y N N
11W Lamp Front of store 14 Failed to illuminate Y N N
Site Status SelectorStore now fully compliant
Next Test Due in 6 months02/03/2024