Partner Name | Sturdie Trade Services |
---|
State | VIC |
---|
Date of Visit | 31/08/2023 |
---|
Technician's Name | Amazigh Tari |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0017/0092 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in VIC | dandenong |
---|
|
|
---|
Location Name | Dandenong |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Initial/12 Months) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
Db-1 |
1 |
Y |
P |
|
|
Db-1 |
3 |
Y |
P |
|
|
Db-1 |
4 |
Y |
P |
|
|
Db-1 |
5 |
Y |
P |
|
|
Db-1 |
6 |
Y |
P |
|
|
Db-1 |
7 |
Y |
P |
|
|
Db-1 |
8 |
Y |
P |
|
|
Db-1 |
9 |
Y |
P |
|
|
Db-1 |
10 |
Y |
P |
|
|
Db-1 |
11 |
Y |
P |
|
|
Db-1 |
12 |
Y |
P |
|
|
Db-1 |
13 |
Y |
P |
|
|
Db-1 |
14 |
Y |
P |
|
|
Db-1 |
15 |
Y |
P |
|
|
Db-1 |
16 |
Y |
P |
|
|
Db-1 |
17 |
Y |
P |
|
|
Db-1 |
18 |
Y |
P |
|
|
Db-1 |
19 |
Y |
P |
|
|
Db-1 |
20 |
Y |
P |
|
|
Db-1 |
21 |
Y |
P |
|
|
Db-1 |
22 |
Y |
P |
|
|
Db-1 |
23 |
Y |
P |
|
|
Db-1 |
24 |
Y |
P |
|
|
Db-1 |
25 |
Y |
P |
|
|
Db-1 |
26 |
Y |
P |
|
|
Db-1 |
27 |
Y |
P |
|
|
Db-1 |
28 |
Y |
P |
|
|
Db-1 |
29 |
Y |
P |
|
|
Db-1 |
30 |
Y |
P |
|
|
Db-1 |
31 |
Y |
P |
|
|
Db-1 |
32 |
Y |
P |
|
|
Db-1 |
33 |
Y |
P |
|
|
Db-1 |
34 |
Y |
P |
|
|
Db-1 |
35 |
Y |
P |
|
|
Db-1 |
36 |
Y |
P |
|
|
Db-1 |
37 |
Y |
P |
|
|
Db-1 |
38 |
Y |
P |
|
|
Db-1 |
39 |
Y |
P |
|
|
Db-1 |
40 |
Y |
P |
|
|
Db-1 |
43 |
Y |
P |
|
|
Db-1 |
45 |
Y |
P |
|
|
Db-1 |
47 |
Y |
P |
|
|
FITOUT DB |
1 |
Y |
P |
|
|
FITOUT DB |
2 |
Y |
P |
|
|
FITOUT DB |
3 |
Y |
P |
|
|
FITOUT DB |
4 |
Y |
P |
|
|
FITOUT DB |
5 |
Y |
P |
|
|
FITOUT DB |
6 |
Y |
P |
|
|
FITOUT DB |
7 |
Y |
P |
|
|
FITOUT DB |
8 |
Y |
P |
|
|
FITOUT DB |
9 |
Y |
P |
|
|
FITOUT DB |
10 |
Y |
P |
|
|
FITOUT DB |
11 |
Y |
P |
|
|
FITOUT DB |
12 |
Y |
P |
|
|
FITOUT DB |
13 |
Y |
P |
|
|
FITOUT DB |
14 |
Y |
P |
|
|
FITOUT DB |
15 |
Y |
P |
|
|
FITOUT DB |
16 |
Y |
P |
|
|
FITOUT DB |
17 |
Y |
P |
|
|
FITOUT DB |
18 |
Y |
P |
|
|
FITOUT DB |
19 |
Y |
P |
|
|
FITOUT DB |
20 |
Y |
P |
|
|
FITOUT DB |
49 |
Y |
P |
|
|
FITOUT DB |
50 |
Y |
P |
|
|
FITOUT DB |
51 |
Y |
P |
|
|
FITOUT DB |
52 |
Y |
P |
|
|
FITOUT DB |
53 |
Y |
P |
|
|
FITOUT DB |
54 |
Y |
P |
|
|
FITOUT DB |
55 |
Y |
P |
|
|
FITOUT DB |
56 |
Y |
P |
|
|
FITOUT DB |
57 |
Y |
P |
|
|
FITOUT DB |
58 |
Y |
P |
|
|
FITOUT DB |
59 |
Y |
P |
|
|
FITOUT DB |
60 |
Y |
P |
|
|
FITOUT DB |
61 |
Y |
P |
|
|
FITOUT DB |
62 |
Y |
P |
|
|
FITOUT DB |
63 |
Y |
P |
|
|
FITOUT DB |
64 |
Y |
P |
|
|
FITOUT DB |
65 |
Y |
P |
|
|
FITOUT DB |
66 |
Y |
P |
|
|
FITOUT DB |
67 |
Y |
P |
|
|
FITOUT DB |
68 |
Y |
P |
|
|
FITOUT DB |
69 |
Y |
P |
|
|
FITOUT DB |
70 |
Y |
P |
|
|
FITOUT DB |
71 |
Y |
P |
|
|
FITOUT DB |
72 |
Y |
P |
|
|
FITOUT DB |
73 |
Y |
P |
|
|
FITOUT DB |
74 |
Y |
P |
|
|
FITOUT DB |
75 |
Y |
P |
|
|
FITOUT DB |
76 |
Y |
P |
|
|
FITOUT DB |
77 |
Y |
P |
|
|
FITOUT DB |
78 |
Y |
P |
|
|
FITOUT DB |
79 |
Y |
P |
|
|
FITOUT DB |
80 |
Y |
P |
|
|
FITOUT DB |
81 |
Y |
P |
|
|
FITOUT DB |
82 |
Y |
P |
|
|
FITOUT DB |
83 |
Y |
P |
|
|
FITOUT DB |
84 |
Y |
P |
|
|
FITOUT DB |
85 |
Y |
P |
|
|
FITOUT DB |
86 |
Y |
P |
|
|
FITOUT DB |
87 |
Y |
P |
|
|
FITOUT DB |
88 |
Y |
P |
|
|
FITOUT DB |
89 |
Y |
P |
|
|
FITOUT DB |
90 |
Y |
P |
|
|
FITOUT DB |
91 |
Y |
P |
|
|
FITOUT DB |
92 |
Y |
P |
|
|
FITOUT DB |
93 |
Y |
P |
|
|
FITOUT DB |
95 |
Y |
P |
|
|
FITOUT DB |
97 |
Y |
P |
|
|
FITOUT DB |
99 |
Y |
P |
|
|
FITOUT DB |
106 |
Y |
P |
|
|
FITOUT DB |
108 |
Y |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
FITOUT DB |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
3 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
4 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
7 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
8 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
10 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
12 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
13 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
14 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
16 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
17 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
1819 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
19 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
20 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
21 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
22 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
23 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
24 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
28 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
29 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
30 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
32 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
33 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
34 |
S |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
41 |
R |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
42 |
R |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
43 |
R |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
44 |
R |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
45 |
R |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
46 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
FITOUT DB |
1 |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
5 |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
9 |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
11 |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
15 |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
25 |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
26 |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
27 |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
31 |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
35 |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
36 |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
37 |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
38 |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
39 |
Y |
Y |
Y |
P |
|
|
|
FITOUT DB |
40 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
Hibay lights |
Y |
LED downlights |
Y |
T5 twin batten lights |
Y |
LED linkables |
Y |
LED external light globes |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Hibay lights |
Fridges, cooktops, hair cooktops, BOH |
4 |
Failed to illuminate |
N |
N |
N |
Added to fortnightly repairs list |
Test and tag |
Store |
80+ |
Tested 04/05/23 due on 04/05/24 |
N |
N |
N |
Observation |
LED Downlight |
Downstairs toilet |
1 |
Failed to illuminate |
Y |
N |
N |
|
LED strip |
Behind main counter |
1 |
Flickers when illuminated |
Y |
N |
N |
Replaced with 3 x LED Linkables |
Motion detector |
Upstairs lunchroom |
1 |
Fails to activate when triggered. Staff must manually override using switch |
Y |
N |
N |
|
11W Lamp |
Front of store |
14 |
Failed to illuminate |
Y |
N |
N |
|
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 02/03/2024 |
---|
| |
---|
| |