Partner Name | Sturdie Trade Services |
---|
State | VIC |
---|
Date of Visit | 14/09/2023 |
---|
Technician's Name | Amazigh Tari |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0017/0090 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in VIC | frankston |
---|
|
|
---|
Location Name | Frankston |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Initial/12 Months) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
Db-M5/1 |
2 |
Y |
P |
|
|
Db-M5/1 |
7 |
Y |
P |
|
|
Db-M5/1 |
9 |
Y |
P |
|
|
Db-M5/1 |
10 |
Y |
P |
|
|
Db-M5/1 |
11 |
Y |
P |
|
|
Db-M5/1 |
12 |
Y |
P |
|
|
Db-M5/1 |
13 |
Y |
P |
|
|
Db-M5/1 |
14 |
Y |
P |
|
|
Db-M5/1 |
15 |
Y |
P |
|
|
Db-M5/1 |
16 |
Y |
P |
|
|
Db-M5/1 |
17 |
Y |
P |
|
|
Db-M5/1 |
18 |
Y |
P |
|
|
Db-M5/1 |
19 |
Y |
P |
|
|
Db-M5/1 |
21 |
Y |
P |
|
|
Db-M5/1 |
22 |
Y |
P |
|
|
Db-M5/1 |
23 |
Y |
P |
|
|
Db-M5/1 |
24 |
Y |
P |
|
|
Db-M5/1 |
25 |
Y |
P |
|
|
Db-M5/1 |
26 |
Y |
P |
|
|
Db-M5/1 |
27 |
Y |
P |
|
|
Db-M5/1 |
28 |
Y |
P |
|
|
Db-M5/1 |
29 |
Y |
P |
|
|
Db-M5/1 |
30 |
Y |
P |
|
|
Db-M5/1 |
31 |
Y |
P |
|
|
Db-M5/1 |
32 |
Y |
P |
|
|
Db-M5/1 |
33 |
Y |
P |
|
|
Db-M5/1 |
34 |
Y |
P |
|
|
Db-M5/1 |
35 |
Y |
P |
|
|
Db-M5/1 |
36 |
Y |
P |
|
|
Db-M5/1 |
37 |
Y |
P |
|
|
Db-M5/1 |
38 |
Y |
P |
|
|
Db-M5/1 |
39 |
Y |
P |
|
|
Db-M5/1 |
40 |
Y |
P |
|
|
Db-M5/1 |
41 |
Y |
P |
|
|
Db-M5/1 |
42 |
Y |
P |
|
|
Db-M5/1 |
44 |
Y |
P |
|
|
Db-M5/1 |
46 |
Y |
P |
|
|
Db-M5/1 |
48 |
Y |
P |
|
|
Db-M5/1 |
50 |
Y |
P |
|
|
Db-M5/1 |
61 |
Y |
P |
|
|
Db-M5/1 |
63 |
Y |
P |
|
|
Db-M5/1 |
65 |
Y |
P |
|
|
Db-M5/1 |
68 |
Y |
P |
|
|
Db-M5/1 |
70 |
Y |
P |
|
|
Db-M5/1 |
72 |
Y |
P |
|
|
DSB-M5/A |
1 |
Y |
P |
|
|
DSB-M5/A |
3 |
Y |
P |
|
|
DSB-M5/A |
5 |
Y |
P |
|
|
DSB-M5/A |
6 |
Y |
P |
|
|
DSB-M5/A |
8 |
Y |
P |
|
|
DSB-M5/A |
10 |
Y |
P |
|
|
DSB-M5/A |
17 |
Y |
P |
|
|
DSB-M5/A |
19 |
Y |
P |
|
|
DSB-M5/A |
20 |
Y |
P |
|
|
DSB-M5/A |
21 |
Y |
P |
|
|
DSB-M5/A |
22 |
Y |
P |
|
|
DSB-M5/A |
23 |
Y |
P |
|
|
DSB-M5/A |
24 |
Y |
P |
|
|
DSB-M5/A |
25 |
Y |
P |
|
|
DSB-M5/A |
26 |
Y |
P |
|
|
DSB-M5/A |
27 |
Y |
P |
|
|
DSB-M5/A |
28 |
Y |
P |
|
|
DSB-M5/A |
29 |
Y |
P |
|
|
DSB-M5/A |
30 |
Y |
P |
|
|
DSB-M5/A |
31 |
Y |
P |
|
|
DSB-M5/A |
32 |
Y |
P |
|
|
DSB-M5/A |
33 |
Y |
P |
|
|
DSB-M5/A |
34 |
Y |
P |
|
|
DSB-M5/A |
35 |
Y |
P |
|
|
DSB-M5/A |
36 |
Y |
P |
|
|
DSB-M5/A |
37 |
Y |
P |
|
|
DSB-M5/A |
38 |
Y |
P |
|
|
DSB-M5/A |
39 |
Y |
P |
|
|
DSB-M5/A |
40 |
Y |
P |
|
|
DSB-M5/A |
41 |
Y |
P |
|
|
DSB-M5/A |
42 |
Y |
P |
|
|
DSB-M5/A |
43 |
Y |
P |
|
|
DSB-M5/A |
44 |
Y |
P |
|
|
DSB-M5/A |
45 |
Y |
P |
|
|
DSB-M5/A |
46 |
Y |
P |
|
|
DSB-M5/A |
47 |
Y |
P |
|
|
DSB-M5/A |
48 |
Y |
P |
|
|
DSB-M5/A |
49 |
Y |
P |
|
|
DSB-M5/A |
50 |
Y |
P |
|
|
DSB-M5/A |
51 |
Y |
P |
|
|
DSB-M5/A |
52 |
Y |
P |
|
|
DSB-M5/A |
53 |
Y |
P |
|
|
DSB-M5/A |
54 |
Y |
P |
|
|
DSB-M5/A |
55 |
Y |
P |
|
|
DSB-M5/A |
56 |
Y |
P |
|
|
DSB-M5/A |
57 |
Y |
P |
|
|
DSB-M5/A |
58 |
Y |
P |
|
|
DSB-M5/A |
59 |
Y |
P |
|
|
DSB-M5/A |
60 |
Y |
P |
|
|
DSB-M5/A |
61 |
Y |
P |
|
|
DSB-M5/A |
62 |
Y |
P |
|
|
DSB-M5/A |
63 |
Y |
P |
|
|
DSB-M5/A |
64 |
Y |
P |
|
|
DSB-M5/A |
65 |
Y |
P |
|
|
DSB-M5/A |
66 |
Y |
P |
|
|
DSB-M5/A |
67 |
Y |
P |
|
|
DSB-M5/A |
68 |
Y |
P |
|
|
DSB-M5/A |
69 |
Y |
P |
|
|
DSB-M5/A |
70 |
Y |
P |
|
|
DSB-M5/A |
71 |
Y |
P |
|
|
DSB-M5/A |
72 |
Y |
P |
|
|
DSB-M5/B |
1 |
Y |
P |
|
|
DSB-M5/B |
2 |
Y |
P |
|
|
DSB-M5/B |
3 |
Y |
P |
|
|
DSB-M5/B |
4 |
Y |
P |
|
|
DSB-M5/B |
5 |
Y |
P |
|
|
DSB-M5/B |
6 |
Y |
P |
|
|
DSB-M5/B |
7 |
Y |
P |
|
|
DSB-M5/B |
8 |
Y |
P |
|
|
DSB-M5/B |
9 |
Y |
P |
|
|
DSB-M5/B |
10 |
Y |
P |
|
|
DSB-M5/B |
11 |
Y |
P |
|
|
DSB-M5/B |
12 |
Y |
P |
|
|
DSB-M5/B |
13 |
Y |
P |
|
|
DSB-M5/B |
14 |
Y |
P |
|
|
DSB-M5/B |
15 |
Y |
P |
|
|
DSB-M5/B |
16 |
Y |
P |
|
|
DSB-M5/B |
17 |
Y |
P |
|
|
DSB-M5/B |
18 |
Y |
P |
|
|
DSB-M5/B |
19 |
Y |
P |
|
|
DSB-M5/B |
20 |
Y |
P |
|
|
DSB-M5/B |
21 |
Y |
P |
|
|
DSB-M5/B |
22 |
Y |
P |
|
|
DSB-M5/B |
23 |
Y |
P |
|
|
DSB-M5/B |
24 |
Y |
P |
|
|
DSB-M5/B |
25 |
Y |
P |
|
|
DSB-M5/B |
26 |
Y |
P |
|
|
DSB-M5/B |
27 |
Y |
P |
|
|
DSB-M5/B |
28 |
Y |
P |
|
|
DSB-M5/B |
29 |
Y |
P |
|
|
DSB-M5/B |
30 |
Y |
P |
|
|
DSB-M5/B |
31 |
Y |
P |
|
|
DSB-M5/B |
32 |
Y |
P |
|
|
DSB-M5/B |
33 |
Y |
P |
|
|
DSB-M5/B |
34 |
Y |
P |
|
|
DSB-M5/B |
35 |
Y |
P |
|
|
DSB-M5/B |
36 |
Y |
P |
|
|
DSB-M5/B |
37 |
Y |
P |
|
|
DSB-M5/B |
38 |
Y |
P |
|
|
DSB-M5/B |
39 |
Y |
P |
|
|
DSB-M5/B |
40 |
Y |
P |
|
|
DSB-M5/B |
41 |
Y |
P |
|
|
DSB-M5/B |
42 |
Y |
P |
|
|
DSB-M5/B |
43 |
Y |
P |
|
|
DSB-M5/B |
44 |
Y |
P |
|
|
DSB-M5/B |
45 |
Y |
P |
|
|
DSB-M5/B |
46 |
Y |
P |
|
|
DSB-M5/B |
47 |
Y |
P |
|
|
DSB-M5/B |
48 |
Y |
P |
|
|
DSB-M5/B |
50 |
Y |
P |
|
|
DSB-M5/B |
64 |
Y |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DSB M5 |
1 |
S |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
3 |
S |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
4 |
S |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
5 |
S |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
7 |
S |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
8 |
S |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
9 |
S |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
10 |
S |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
11 |
S |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
12 |
S |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
13 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
14 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
15 |
S |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
16 |
S |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
18 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
19 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
20 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
21 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
22 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
23 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
24 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
25 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
26 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
27 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
28 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
29 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
30 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
31 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
32 |
R |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
33 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DSB M5 |
1 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
2 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
3 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
4 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
5 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
6 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
7 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
8 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
9 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
10 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
11 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
12 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
13 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
14 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
15 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
16 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
17 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
18 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
19 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
20 |
Y |
Y |
Y |
P |
|
|
|
DSB M5 |
21 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
90mm LED Downlights |
Y |
70mm LED Downlights |
Y |
Hi-Bay Lights |
Y |
36W Single Fluorescent Batten Lights |
Y |
36W Double Diffused Fluorescent Batten Lights |
Y |
36W Single Diffused Fluorescent Batten Lights |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Test & tag |
Store |
80+ |
Tested 30/4/23 due 30/4/24 |
N |
N |
N |
|
LED Downlights |
TV area |
2 |
Failed to illuminate |
Y |
N |
N |
|
Hi-Bay |
Kinsman |
1 |
Failed to illuminate |
Y |
N |
N |
|
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 14/03/2023 |
---|
| |
---|
| |