Partner NameBuilt Electrical Australia
StateNSW
Date of Visit19/09/2023
Technician's NamePeter Hay
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0015/0086
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWbankstown

Location NameBankstown
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB5 2 Y P
DB5 4 Y P
DB5 6 Y P
DB5 9 Y P
DB5 10 Y P
DB5 12 Y P
DB5 14 Y P
DB5 16 Y P
DB5 18 Y P
DB5 19 Y P
DB5 20 Y P
DB5 21 Y P
DB5 22 Y P
DB5 23 Y P
DB5 24 Y P
DB5 25 Y P
DB5 27 Y P
DB5 28 Y P
DB5 29 Y P
DB5 30 Y P
DB5 31 Y P
DB5 33 Y P
DB5 35 Y P
DB5 37 Y P
DB5 42 Y P
DB5 44 Y P
DB5 45 Y P
DB5 47 Y P
DB5.1 1 Y P
DB5.1 2 Y P
DB5.1 3 Y P
DB5.1 4 Y P
DB5.1 5 Y P
DB5.1 6 Y P
DB5.1 7 Y P
DB5.1 8 Y P
DB5.1 9 Y P
DB5.1 10 Y P
DB5.1 11 Y P
DB5.1 12 Y P
DB5.1 13 Y P
DB5.1 14 Y P
DB5.1 15 Y P
DB5.1 16 Y P
DB5.1 17 Y P
DB5.1 18 Y P
DB5.1 19 Y P
DB5.1 20 Y P
DB5.1 21 Y P
DB5.1 22 Y P
DB5.1 23 Y P
DB5.1 24 Y P
DB5.1 25 Y P
DB5.1 26 Y P
DB5.1 27 Y P
DB5.1 28 Y P
DB5.1 29 Y P
DB5.1 30 Y P
DB5.1 31 Y P
DB5.1 32 Y P
DB5.1 33 Y P
DB5.1 35 Y P
DB4 7 Y P
DB4 9 Y P
DB4 11 Y P
DB4 13 Y P
DB4 15 Y P
DB4 17 Y P
DB4 18 Y P
DB4 19 Y P
DB4 20 Y P
DB4 21 Y P
DB4 22 Y P
DB4 23 Y P
DB4 24 Y P
DB4 25 Y P
DB4 26 Y P
DB4 27 Y P
DB4 28 Y P
DB4 29 Y P
DB4 30 Y P
DB4 31 Y P
DB4 32 Y P
DB4 33 Y P
DB4 34 Y P
DB4 35 Y P
DB4 36 Y P
DB4 37 Y P
DB4 38 Y P
DB4 39 Y P
DB4 40 Y P
DB4 41 Y P
DB4 42 Y P
DB4A 8 Y P
DB5A 7 Y P
DB5A 10 Y P
DB5A 11 Y P
DB5A 12 Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 R Y Y Y P
2 S Y Y Y P
3 S Y N Y F Failed 90 min test Y N
4 S Y Y Y P
5 S Y N Y F Failed 90 min test Y N
6 S Y Y Y P
7 S Y Y Y P
8 S Y Y Y P
9 S Y N Y F Failed 90 min test Y N
10 S Y Y Y P
11 S Y Y Y P
12 S Y Y Y P
13 S Y Y Y P
14 S Y Y Y P
15 S Y N Y F Failed 90 min test Y N
16 S Y Y Y P
17 S Y N Y F Failed 90 min test Y N
18 S Y Y Y P
19 S Y Y Y P
20 S Y Y Y P
21 R Y Y Y P
22 R Y Y Y P
23 R Y Y Y P
24 R Y Y Y P
25 S Y Y Y P
26 R Y Y Y P
27 R Y Y Y P
28 R Y Y Y P
29 S Y Y Y P
30 S Y Y Y P
31 S Y Y Y P
32 S Y Y Y P
33 S Y Y Y P
33 S Y Y Y P
34 R Y Y Y P
35 R Y Y Y P
36 S Y Y Y P
37 S Y Y Y P
38 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 Y Y Y P
2 Y Y Y P
3 Y Y Y P
4 Y Y Y P
5 Y Y Y P
6 Y Y Y P
7 Y Y Y P
8 Y Y Y P
9 Y Y Y P
10 Y Y Y P
11 Y Y Y P
12 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
1200x300mm LED panel Y
Ufo high bay Y
4ft Battens Y
70mm down lights Y
92mm down lights Y
Wall bay LED panels Y
Spot lights Y
Are there any Warranty items needing to be repaired?Yes
WARRANTY
Defect Item Location of Item (on premises) Quantity Details of fault/problem Manufacturer Part Number Repaired on Site Comments
Track mounted spot light Laptops 1 Not illuminated VIBE - Y
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
LG Washing machine display Trading floor 1 Tripping every morning N N N Repairs previously quoted. Please refer to quote #218
92mm Downlights TV's 2 Not illuminated/flickering Y N N
LED panels Front office 2 Discoloured Y N N
DB schedules DB5, DB5.1, DB4 3 Multiple circuits not labelled N TBA TBA Added to fortnightly repairs list
Surface mount emergency batten #3 1 Failed 90 min test Y N N
Surface mount emergency batten #5 1 Failed 90 min test Y N N
Surface mount emergency batten #9 1 Failed 90 min test Y N N
Surface mount emergency batten #15 1 Failed 90 min test Y N N
Surface mount emergency batten #17 1 Failed 90 min test Y N N
Site Status SelectorStore now fully compliant
Next Test Due in 6 months19/03/2024