Partner Name | Sturdie Trade Services |
---|
State | VIC |
---|
Date of Visit | 22/09/2023 |
---|
Technician's Name | Amazigh Tari |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0017/0099 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in VIC | taylors_lakes |
---|
|
|
---|
Location Name | Taylors Lakes |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Initial/12 Months) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
Db-1 |
1 |
Y |
P |
|
|
Db-1 |
2 |
Y |
P |
|
|
Db-1 |
3 |
Y |
P |
|
|
Db-1 |
4 |
Y |
P |
|
|
Db-1 |
5 |
Y |
P |
|
|
Db-1 |
6 |
Y |
P |
|
|
Db-1 |
7 |
Y |
P |
|
|
Db-1 |
8 |
Y |
P |
|
|
Db-1 |
9 |
Y |
P |
|
|
Db-1 |
10 |
Y |
P |
|
|
Db-1 |
11 |
Y |
P |
|
|
Db-1 |
12 |
Y |
P |
|
|
Db-1 |
16 |
Y |
P |
|
|
Db-1 |
17 |
Y |
P |
|
|
Db-1 |
18 |
Y |
P |
|
|
Db-1 |
19 |
Y |
P |
|
|
Db-1 |
20 |
Y |
P |
|
|
Db-1 |
21 |
Y |
P |
|
|
Db-1 |
22 |
Y |
P |
|
|
Db-1 |
23 |
Y |
P |
|
|
Db-1 |
24 |
Y |
P |
|
|
Db-1 |
25 |
Y |
P |
|
|
Db-1 |
26 |
Y |
P |
|
|
Db-1 |
27 |
Y |
P |
|
|
Db-1 |
28 |
Y |
P |
|
|
Db-1 |
29 |
Y |
P |
|
|
Db-1 |
30 |
Y |
P |
|
|
Db-1 |
31 |
Y |
P |
|
|
Db-1 |
32 |
Y |
P |
|
|
Db-1 |
33 |
Y |
P |
|
|
Db-1 |
34 |
Y |
P |
|
|
Db-1 |
35 |
Y |
P |
|
|
Db-1 |
36 |
Y |
P |
|
|
Db-1 |
37 |
Y |
P |
|
|
Db-1 |
38 |
Y |
P |
|
|
Db-1 |
39 |
Y |
P |
|
|
Db-1 |
40 |
Y |
P |
|
|
Db-1 |
41 |
Y |
P |
|
|
Db-1 |
42 |
Y |
P |
|
|
Db-1 |
43 |
Y |
P |
|
|
Db-1 |
44 |
Y |
P |
|
|
Db-1 |
45 |
Y |
P |
|
|
Db-1 |
46 |
Y |
P |
|
|
Db-1 |
47 |
Y |
P |
|
|
Db-1 |
48 |
Y |
P |
|
|
Db-1 |
49 |
Y |
P |
|
|
Db-1 |
50 |
Y |
P |
|
|
Db-1 |
51 |
Y |
P |
|
|
Db-1 |
52 |
Y |
P |
|
|
Db-1 |
53 |
Y |
P |
|
|
Db-1 |
54 |
Y |
P |
|
|
Db-1 |
55 |
Y |
P |
|
|
Db-1 |
56 |
Y |
P |
|
|
Db-1 |
57 |
Y |
P |
|
|
Db-1 |
61 |
Y |
P |
|
|
Db-1 |
62 |
Y |
P |
|
|
Db-1 |
63 |
Y |
P |
|
|
Db-1 |
64 |
Y |
P |
|
|
Db-1 |
65 |
Y |
P |
|
|
Db-1 |
66 |
Y |
P |
|
|
Db-1 |
67 |
Y |
P |
|
|
Db-1 |
68 |
Y |
P |
|
|
Db-1 |
69 |
Y |
P |
|
|
Db-1 |
70 |
Y |
P |
|
|
Db-1 |
71 |
Y |
P |
|
|
Db-1 |
72 |
Y |
P |
|
|
Db-1 |
73 |
Y |
P |
|
|
Db-1 |
74 |
Y |
P |
|
|
Db-1 |
75 |
Y |
P |
|
|
Db-1 |
76 |
Y |
P |
|
|
Db-1 |
77 |
Y |
P |
|
|
Db-1 |
78 |
Y |
P |
|
|
Db-1 |
79 |
Y |
P |
|
|
Db-1 |
80 |
Y |
P |
|
|
Db-1 |
81 |
Y |
P |
|
|
Db-1 |
82 |
Y |
P |
|
|
Db-1 |
83 |
Y |
P |
|
|
Db-1 |
84 |
Y |
P |
|
|
Db-1 |
85 |
Y |
P |
|
|
Db-1 |
86 |
Y |
P |
|
|
Db-1 |
87 |
Y |
P |
|
|
Db-1 |
89 |
Y |
P |
|
|
Db-1 |
90 |
Y |
P |
|
|
Db-1 |
91 |
Y |
P |
|
|
Db-1 |
92 |
Y |
P |
|
|
Db-1 |
93 |
Y |
P |
|
|
Db-1 |
94 |
Y |
P |
|
|
Db-1 |
95 |
Y |
P |
|
|
Db-1 |
96 |
Y |
P |
|
|
Db-1 |
97 |
Y |
P |
|
|
Db-1 |
98 |
Y |
P |
|
|
Db-1 |
99 |
Y |
P |
|
|
Db-1 |
100 |
Y |
P |
|
|
Db-1 |
101 |
Y |
P |
|
|
Db-1 |
102 |
Y |
P |
|
|
Db-1 |
103 |
Y |
P |
|
|
Db-1 |
104 |
Y |
P |
|
|
Db-1 |
105 |
Y |
P |
|
|
Db-1 |
106 |
Y |
P |
|
|
Db-1 |
107 |
Y |
P |
|
|
Db-1 |
108 |
Y |
P |
|
|
Db-1 |
109 |
Y |
P |
|
|
Db-1 |
110 |
Y |
P |
|
|
Db-1 |
111 |
Y |
P |
|
|
Db-1 |
112 |
Y |
P |
|
|
Db-1 |
113 |
Y |
P |
|
|
Db-1 |
114 |
Y |
P |
|
|
Db-1 |
115 |
Y |
P |
|
|
Db-1 |
116 |
Y |
P |
|
|
Db-1 |
117 |
Y |
P |
|
|
Db-1 |
118 |
Y |
P |
|
|
Db-1 |
119 |
Y |
P |
|
|
Db-1 |
120 |
Y |
P |
|
|
Db-1 |
121 |
Y |
P |
|
|
Db-1 |
122 |
Y |
P |
|
|
Db-1 |
123 |
Y |
P |
|
|
Db-1 |
124 |
Y |
P |
|
|
Db-1 |
125 |
Y |
P |
|
|
Db-1 |
126 |
Y |
P |
|
|
Db-1 |
127 |
Y |
P |
|
|
Db-1 |
128 |
Y |
P |
|
|
Db-1 |
129 |
Y |
P |
|
|
Db-1 |
130 |
Y |
P |
|
|
Db-1 |
131 |
Y |
P |
|
|
Db-1 |
132 |
Y |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
Db-1 |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
3 |
S |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
4 |
S |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
7 |
R |
N |
N |
N |
F |
Failed 90mins discharge test |
Y |
N |
Db-1 |
8 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
9 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
14 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
18 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
23 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
24 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
25 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
27 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
23 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
28 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
31 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
35 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
36 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
37 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
39 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
42 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
45 |
R |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
46 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
Db-1 |
1 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
5 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
6 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
11 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
12 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
13 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
14 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
16 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
19 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
20 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
21 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
22 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
26 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
29 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
30 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
32 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
33 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
34 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
38 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
40 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
41 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
43 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
36W LED batton lights |
Y |
Hi-bay lights |
Y |
LED Panel lights |
Y |
72mm downlights |
Y |
Wall washer track lights |
Y |
Track spotlights |
Y |
LED linkable |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Test and tag |
Store |
80+ |
No test and tag on store leads |
N |
N |
N |
Observation |
Ceiling tile |
Climate control |
1 |
Tile missing in ceiling |
N |
N |
N |
Observation |
Track spotlight |
Front counter + laundry |
3 |
Failed to illuminate |
N |
N |
N |
To be completed on warranty Job No. 50F0017/0167 |
Emergency light (7) |
Lunch room |
1 |
Failed 90mins discharge test |
Y |
N |
N |
|
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 22/03/2023 |
---|
| |
---|
| |