Partner Name | Sturdie Trade Services |
---|
State | VIC |
---|
Date of Visit | 27/09/2023 |
---|
Technician's Name | Amazigh Tari |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0017/0091 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in VIC | moorabbin |
---|
|
|
---|
Location Name | Moorabbin |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Initial/12 Months) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
Db-9A2 |
2 |
Y |
P |
|
|
Db-9A2 |
4 |
Y |
P |
|
|
Db-9A2 |
6 |
Y |
P |
|
|
Db-9A2 |
7 |
Y |
P |
|
|
Db-9A2 |
8 |
Y |
P |
|
|
Db-9A2 |
9 |
Y |
P |
|
|
Db-9A2 |
10 |
Y |
P |
|
|
Db-9A2 |
11 |
Y |
P |
|
|
Db-9A2 |
12 |
Y |
P |
|
|
Db-9A2 |
13 |
Y |
P |
|
|
Db-9A2 |
14 |
Y |
P |
|
|
Db-9A2 |
15 |
Y |
P |
|
|
Db-9A2 |
16 |
Y |
P |
|
|
Db-9A2 |
17 |
Y |
P |
|
|
Db-9A2 |
18 |
Y |
P |
|
|
Db-9A2 |
19 |
Y |
P |
|
|
Db-9A2 |
20 |
Y |
P |
|
|
Db-9A2 |
21 |
Y |
P |
|
|
Db-9A2 |
22 |
Y |
P |
|
|
Db-9A2 |
23 |
Y |
P |
|
|
Db-9A2 |
24 |
Y |
P |
|
|
Db-9A2 |
25 |
Y |
P |
|
|
Db-9A2 |
26 |
Y |
P |
|
|
Db-9A2 |
27 |
Y |
P |
|
|
Db-9A2 |
28 |
Y |
P |
|
|
Db-9A2 |
29 |
Y |
P |
|
|
Db-9A2 |
30 |
Y |
P |
|
|
Db-9A2 |
32 |
Y |
P |
|
|
Db-9A2 |
34 |
Y |
P |
|
|
Db-9A2 |
36 |
Y |
P |
|
|
Db-T9A1 |
7 |
Y |
P |
|
|
Db-T9A1 |
8 |
Y |
P |
|
|
Db-T9A1 |
9 |
Y |
P |
|
|
Db-T9A1 |
10 |
Y |
P |
|
|
Db-T9A1 |
11 |
Y |
P |
|
|
Db-T9A1 |
12 |
Y |
P |
|
|
Db-T9A1 |
13 |
Y |
P |
|
|
Db-T9A1 |
14 |
Y |
P |
|
|
Db-T9A1 |
15 |
Y |
P |
|
|
Db-T9A1 |
16 |
Y |
P |
|
|
Db-T9A1 |
17 |
Y |
P |
|
|
Db-T9A1 |
18 |
Y |
P |
|
|
Db-T9A1 |
19 |
Y |
P |
|
|
Db-T9A1 |
20 |
Y |
P |
|
|
Db-T9A1 |
21 |
Y |
P |
|
|
Db-T9A1 |
22 |
Y |
P |
|
|
Db-T9A1 |
23 |
Y |
P |
|
|
Db-T9A1 |
24 |
Y |
P |
|
|
Db-T9A1 |
25 |
Y |
P |
|
|
Db-T9A1 |
26 |
Y |
P |
|
|
Db-T9A1 |
27 |
Y |
P |
|
|
Db-T9A1 |
28 |
Y |
P |
|
|
Db-T9A1 |
29 |
Y |
P |
|
|
Db-T9A1 |
30 |
Y |
P |
|
|
Db-T9A1 |
31 |
Y |
P |
|
|
Db-T9A1 |
32 |
Y |
P |
|
|
Db-T9A1 |
33 |
Y |
P |
|
|
Db-T9A1 |
34 |
Y |
P |
|
|
Db-T9A1 |
35 |
Y |
P |
|
|
Db-T9A1 |
36 |
Y |
P |
|
|
Db-T9A1 |
37 |
Y |
P |
|
|
Db-T9A1 |
38 |
Y |
P |
|
|
Db-T9A1 |
39 |
Y |
P |
|
|
Db-T9A1 |
40 |
Y |
P |
|
|
Db-T9A1 |
41 |
Y |
P |
|
|
Db-T9A1 |
42 |
Y |
P |
|
|
Db-T9A1 |
44 |
Y |
P |
|
|
Db-T9A1 |
46 |
Y |
P |
|
|
Db-T9A1 |
48 |
Y |
P |
|
|
Db-T9A1 Lights |
1 |
Y |
P |
|
|
Db-T9A1 Lights |
2 |
Y |
P |
|
|
Db-T9A1 Lights |
3 |
Y |
P |
|
|
Db-T9A1 Lights |
4 |
Y |
P |
|
|
Db-T9A1 Lights |
5 |
Y |
P |
|
|
Db-T9A1 Lights |
6 |
Y |
P |
|
|
Db-T9A1 Lights |
7 |
Y |
P |
|
|
Db-T9A1 Lights |
8 |
Y |
P |
|
|
Db-T9A1 Lights |
9 |
Y |
P |
|
|
Db-T9A1 Lights |
10 |
Y |
P |
|
|
Db-T9A1 Lights |
11 |
Y |
P |
|
|
Db-T9A1 Lights |
12 |
Y |
P |
|
|
Db-T9A1 Lights |
13 |
Y |
P |
|
|
Db-T9A1 Lights |
14 |
Y |
P |
|
|
Db-T9A1 Lights |
15 |
Y |
P |
|
|
Db-T9A1 Lights |
16 |
Y |
P |
|
|
Db-T9A1 Lights |
17 |
Y |
P |
|
|
Db-T9A1 Lights |
18 |
Y |
P |
|
|
Db-T9A1 Lights |
19 |
Y |
P |
|
|
Db-T9A1 Lights |
20 |
Y |
P |
|
|
Db-T9A1 Lights |
21 |
Y |
P |
|
|
Db-T9A1 Lights |
22 |
Y |
P |
|
|
Db-T9A1 Lights |
23 |
Y |
P |
|
|
Db-T9A1 Lights |
24 |
Y |
P |
|
|
Db-T9A1 Lights |
26 |
Y |
P |
|
|
Db-T9A3 |
1 |
Y |
P |
|
|
Db-T9A3 |
2 |
Y |
P |
|
|
Db-T9A3 |
3 |
Y |
P |
|
|
Db-T9A3 |
4 |
Y |
P |
|
|
Db-T9A3 |
5 |
Y |
P |
|
|
Db-T9A3 |
6 |
Y |
P |
|
|
Db-T9A3 |
7 |
Y |
P |
|
|
Db-T9A3 |
8 |
Y |
P |
|
|
Db-T9A3 |
9 |
Y |
P |
|
|
Db-T9A3 |
10 |
Y |
P |
|
|
Db-T9A3 |
11 |
Y |
P |
|
|
Db-T9A3 |
12 |
Y |
P |
|
|
Db-T9A3 |
13 |
Y |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB-T9A1 |
2 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
5 |
R |
Y |
Y |
Y |
P |
|
|
|
DB- T9A1 |
6 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
7 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
8 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
10 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
11 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
12 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
16 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
18 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
19 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
21 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
22 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
23 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
24 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
28 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
29 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
30 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB-T9A1 |
1 |
Y |
Y |
Y |
P |
|
|
|
DB- T9A1 |
3 |
Y |
Y |
Y |
P |
|
|
|
DB- T9A1 |
4 |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
9 |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
13 |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
14 |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
15 |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
17 |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
20 |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
25 |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
26 |
Y |
Y |
Y |
P |
|
|
|
DB-T9A1 |
27 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
Hi-bay lights LED |
Y |
36W diffuser LED |
Y |
Square Hi-bay lights LED |
Y |
72mm downlight |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
High bay light |
Cooktops |
1 |
Failed to illuminate |
Y |
N |
N |
|
Test & tag |
Store |
80+ |
Tested 3/5/23 due 3/5/24 |
N |
N |
N |
Observation |
Blue LED strip |
Tv's |
1 x 5 metre strip + driver |
Flickering |
Y |
N |
N |
|
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 27/03/2024 |
---|
| |
---|
| |