Partner NameBuilt Electrical Australia
StateNSW
Date of Visit28/09/2023
Technician's NamePeter Hay
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50f0015/0087
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWmoore_park

Location NameMoore Park
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB1 1 Y P
DB1 5,6,7 Y P
DB1 8 Y P
DB1 9 Y P
DB1 10 Y P
DB1 11 Y P
DB1 12 Y P
DB1 13 Y P
DB1 14 Y P
DB1 15 Y P
DB1 16 Y P
DB1 17 Y P
DB1 18 Y P
DB1 19 Y P
DB1 20 Y P
DB1 21 Y P
DB1 22 Y P
DB1 23 Y P
DB1 24 Y P
DB1 28 Y P
DB1 29 Y P
DB1 30 Y P
DB1 31 Y P
DB1 32 Y P
DB1 33 Y P
DB1 34 Y P
DB1 35 Y P
DB1 40 Y P
DB1 41 Y P
DB1 42 Y P
DB1 43 Y P
DB1 44 Y P
DB1 45 Y P
DB1 46 Y P
DB1 47 Y P
DB1 48 Y P
DB1 49 Y P
DB1 50 Y P
DB1 51 Y P
DB1 52 Y P
DB1 53 Y P
DB1 54 Y P
DB1 55 Y P
DB1 56 Y P
DB1 57 Y P
DB1 58 Y P
DB1 59 Y P
DB1 60 Y P
DB1 61 Y P
DB1 64 Y P
DB1 65 Y P
DB1 66 Y P
DB1 67 Y P
DB1 68 Y P
DB1 69 Y P
DB1 70 Y P
DB1 71 Y P
DB1 73 Y P
DB1 74 Y P
DB1 75 Y P
DB1 76 Y P
DB1 77 Y P
DB1 78 Y P
DB1 79 Y P
DB1 80 Y P
DB1 81 Y P
DB1 82 Y P
DB1 83 Y P
DB1 84 Y P
DB1 85 Y P
DB1 86 Y P
DB1 87 Y P
DB1 88 Y P
DB1 92,93,94 Y P
DB1 95 Y P
DB1 96 Y P
DB1 97 Y P
DB1 98 Y P
DB1 99 Y P
DB1 100 Y P
DB1 101 Y P
DB1 102 Y P
DB1 103 Y P
DB1 104 Y P
DB1 105 Y P
DB1 106 Y P
DB1 109 Y P
DB1 110 Y P
DB1 111 Y P
DB1 112 Y P
DB1 113 Y P
DB1 114 Y P
DB1 115 Y P
DB1 116 Y P
DB1 117 Y P
DB1 118 Y P
DB1 119 Y P
DB1 120 Y P
DB1 121 Y P
DB1 122 Y P
DB1 123 Y P
DB1 124 Y P
DB1 125 Y P
DB1 126 Y P
DB1 127 Y P
DB1 128 Y P
DB1 129 Y P
DB1 130 Y P
DB1 131 Y P
DB1 132 Y P
DB1 133 Y P
DB1 134 Y P
DB1 135 Y P
DB1 136 Y P
DB1 137 Y P
DB1 138 Y P
DB1 139 Y P
DB1 140 Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 1 S Y Y Y P
DB1 2 S Y Y Y P
DB1 3 S Y Y Y P
DB1 4 S Y Y Y P
DB1 5 S Y Y Y P
DB1 6 R Y Y Y P
DB1 7 S Y Y Y P
DB1 8 S - 4ft Y Y Y P
DB1 9 S Y Y Y P
DB1 10 S Y Y Y P
DB1 11 S Y Y Y P
DB1 12 S - 4ft N N N F Physical damage Y N
DB1 13 S - 4ft Y Y Y P
DB1 14 S - 4ft Y Y Y P
DB1 15 S- 4ft Y Y Y P
DB1 16 S - 4ft Y Y Y P
DB1 17 S - 4ft Y Y Y P
DB1 18 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 1 Y Y Y P
DB1 2 Y Y Y P
DB1 3 Y Y Y P
DB1 4 Y Y Y P
DB1 5 Y Y Y P
DB1 6 Y Y Y P
DB1 7 Y Y Y P
DB1 8 Y Y Y P
DB1 9 Y Y Y P
DB1 10 Y Y Y P
DB1 11 Y Y Y P
DB1 12 Y Y Y P
DB1 13 Y Y Y P
DB1 14 Y Y Y P
DB1 15 Y Y Y P
DB1 16 Y Y Y P
DB1 17 Y Y Y P
DB1 18 Y Y Y P
DB1 19 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
4ft troffers with 2 x t8 LED tubes Y
Ufo high bays Y
4ft Battens Y
LED flat panel light boxes for wall bays Y
Wall bay LED panels Y
Vibe 900mm linkable battens Y
50mm downlights Y
70mm downlights Y
92mm downlights Y
SVL Cubo184W Track mounted spot lights white Y
165mm (approx downlights) Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Surface mount emergency batten #12 1 Physically damaged Y N N
Site Status SelectorStore now fully compliant
Next Test Due in 6 months28/03/2024