Partner NameBuilt Electrical Australia
StateNSW
Date of Visit06/10/2023
Technician's NamePeter Hay
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0015/0089
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWcastle_hill

Location NameCastle Hill
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
Db1 1 Y P
Db1 3 Y P
Db1 5 Y P
Db1 7 Y P
Db1 9 Y P
Db1 11 Y P
Db1 13 Y P
Db1 15 Y P
Db1 17 Y P
Db1 19 Y P
Db1 20 Y P
Db1 21 Y P
Db1 22 Y P
Db1 23 Y P
Db1 24 Y P
Db1 25 Y P
Db1 26 Y P
Db1 27 Y P
Db1 28 Y P
Db1 29 Y P
Db1 30 Y P
Db1 31 Y P
Db1 32 Y P
Db1 34 Y P
Db1 36 Y P
Db1 38 Y P
Db2 1 Y P
Db2 3 Y P
Db2 5 Y P
Db2 7 Y P
Db2 8 Y P
Db2 9 Y P
Db2 10 Y P
Db2 11 Y P
Db2 12 Y P
Db2 13 Y P
Db2 14 Y P
Db2 15 Y P
Db2 16 Y P
Db2 17 Y P
Db2 18 Y P
Db2 19 Y P
Db2 20 Y P
Db2 21 Y P
Db2 22 Y P
Db2 23 Y P
Db2 24 Y P
Db2 25 Y P
Db2 26 Y P
Db2 27 Y P
Db2 28 Y P
Db2 29 Y P
Db2 30 Y P
Db2 31 Y P
Db2 32 Y P
Db2 33 Y P
Db3 1 Y P
Db3 3 Y P
Db3 5 Y P
Db3 7 Y P
Db3 8 Y P
Db3 9 Y P
Db3 10 Y P
Db3 11 Y P
Db3 12 Y P
Db3 13 Y P
Db3 14 Y P
Db3 15 Y P
Db3 16 Y P
Db3 17 Y P
Db3 18 Y P
Db3 19 Y P
Db3 20 Y P
Db3 21 Y P
Db3 22 Y P
Db3 23 Y P
Db3 24 Y P
Db3 25 Y P
Db3 26 Y P
Db3 27 Y P
Db3 28 Y P
Db3 30 Y P
Db3 32 Y P
Db3 35 Y P
Db4 1 Y P
Db4 3 Y P
Db4 5 Y P
Db4 7 Y P
Db4 8 Y P
Db4 9 Y P
Db4 10 Y P
Db4 11 Y P
Db4 12 Y P
Db4 13 Y P
Db4 14 Y P
Db4 15 Y P
Db4 16 Y P
Db4 17 Y P
Db4 18 Y P
Db4 19 Y P
Db4 20 Y P
Db4 21 Y P
Db4 22 Y P
Db4 23 Y P
Db4 24 Y P
Db4 25 Y P
Db4 26 Y P
Db4 27 Y P
Db4 28 Y P
Db4 29 Y P
Db4 30 Y P
Db4 32 Y P
Db4 34 Y P
Db5 1 Y P
Db5 2 Y P
Db5 3 Y P
Db5 4 Y P
Db5 5 Y P
Db5 6 Y P
Db5 7 Y P
Db5 8 Y P
Db5 9 Y P
Db5 10 Y P
Db5 11 Y P
Db5 12 Y P
Db5 13 Y P
Db5 14 Y P
Db5 15 Y P
Db5 16 Y P
Db5 17 Y P
Db5 18 Y P
Db5 19 Y P
Db5 20 Y P
Db5 21 Y P
Db5 22 Y P
Db5 23 Y P
Db5 24 Y P
Db5 25 Y P
Db5 26 Y P
Db5 27 Y P
Db5 28 Y P
Db5 29 Y P
Db5 30 Y P
Db5 31 Y P
Db5 32 Y P
Db5 33 Y P
Db5 34 Y P
Db5 35 Y P
Db5 36 Y P
Db5 37 Y P
Db5 38 Y P
Db5 39 Y P
Db5 40 Y P
Db5 41 Y P
Db5 42 Y P
Db5 43 Y P
Db5 44 Y P
Db5 45 Y P
Db5 46 Y P
Db5 47 Y P
Sb5 48 Y P
Db5 49 Y P
Db5 50 Y P
Db5 51 Y P
Db5 52 Y P
Db5 53 Y P
Db5 54 Y P
Db5 56 Y P
Db5 58 Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 1 Y Y Y P
2 Y Y Y P
6 Y Y Y P
7 Y Y Y P
8 Y Y Y P
9 Y Y Y P
10 Y Y Y P
11 Y Y Y P
14 Y Y Y P
17 Y Y Y P
18 Y Y Y P
19 Y Y Y P
21 Y Y Y P
22 Y Y Y P
23 Y Y Y P
24 Y Y Y P
26 Y Y Y P
27 Y Y Y P
35 Y Y Y P
36 Y Y Y P
37 Y Y Y P
38 Y Y Y P
39 Y Y Y P
40 Y Y Y P
41 Y Y Y P
42 Y Y Y P
43 Y Y Y P
44 Y Y Y P
45 Y Y Y P
46 Y Y Y P
47 Y Y Y P
48 Y Y Y P
49 Y Y Y P
50 Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 1 Y Y Y P
3 Y Y Y P
4 Y Y Y P
5 Y Y Y P
6 Y Y Y P
7 Y Y Y P
8 Y Y Y P
9 Y Y Y P
10 Y Y Y P
11 Y Y Y P
12 Y Y Y P
13 Y Y Y P
14 Y Y Y P
15 Y Y Y P
16 Y Y Y P
17 Y Y Y P
18 Y Y Y P
19 Y Y Y P
20 Y Y Y P
21 Y Y Y P
22 Y Y Y P
23 Y Y Y P
24 Y Y Y P
25 Y Y Y P
26 Y Y Y P
27 Y Y Y P
28 Y Y Y P
29 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Ufo high bays Y
Track mount wall washers Y
Wall bay LED panels Y
70mm downlights Y
4ft battens Y
1200x300mm LED panels Y
2ft battens Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Submains BOH switch room 2 No mechanical protection at floor level. N N N/A Reece / Shopfitters will rectify.
DB5 lock Front of store 1 Damaged N N N/A Still sourcing materials. To be replaced when next on site.
Site Status SelectorCompleted but with repairs required
Next Test Due in 6 months07/10/2024