Partner Name | Built Electrical Australia |
---|
State | NSW |
---|
Date of Visit | 02/11/2023 |
---|
Technician's Name | Peter Hay |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0015/00095 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in NSW | warrawong |
---|
|
|
---|
Location Name | Warrawong |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Initial/12 Months) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
MSB L&P |
1 |
Y |
P |
|
|
MSB L&P |
2 |
Y |
P |
|
|
MSB L&P |
3 |
Y |
P |
|
|
MSB L&P |
4 |
Y |
P |
|
|
MSB L&P |
8 |
Y |
P |
|
|
MSB L&P |
9 |
Y |
P |
|
|
MSB L&P |
10 |
Y |
P |
|
|
MSB L&P |
11 |
Y |
P |
|
|
MSB L&P |
12 |
Y |
P |
|
|
MSB L&P |
16 |
Y |
P |
|
|
MSB L&P |
17 |
Y |
P |
|
|
MSB L&P |
18 |
Y |
P |
|
|
MSB L&P |
19 |
Y |
P |
|
|
MSB L&P |
20 |
Y |
P |
|
|
MSB L&P |
21 |
Y |
P |
|
|
MSB L&P |
22 |
Y |
P |
|
|
MSB L&P |
23 |
Y |
P |
|
|
MSB L&P |
24 |
Y |
P |
|
|
MSB L&P |
25 |
Y |
P |
|
|
MSB L&P |
26 |
Y |
P |
|
|
MSB L&P |
27 |
Y |
P |
|
|
MSB L&P |
28 |
Y |
P |
|
|
MSB L&P |
29 |
Y |
P |
|
|
MSB L&P |
30 |
Y |
P |
|
|
MSB L&P |
31 |
Y |
P |
|
|
MSB L&P |
32 |
Y |
P |
|
|
MSB L&P |
33 |
Y |
P |
|
|
MSB L&P |
37 |
Y |
P |
|
|
MSB L&P |
38 |
Y |
P |
|
|
MSB L&P |
39 |
Y |
P |
|
|
MSB L&P |
40 |
Y |
P |
|
|
MSB L&P |
41 |
Y |
P |
|
|
MSB L&P |
42 |
Y |
P |
|
|
MSB L&P |
43 |
Y |
P |
|
|
MSB L&P |
44 |
Y |
P |
|
|
MSB L&P |
45 |
Y |
P |
|
|
MSB L&P |
46 |
Y |
P |
|
|
MSB L&P |
47 |
Y |
P |
|
|
MSB L&P |
48 |
Y |
P |
|
|
MSB L&P |
52 |
Y |
P |
|
|
MSB L&P |
53 |
Y |
P |
|
|
MSB L&P |
54 |
Y |
P |
|
|
MSB L&P |
55 |
Y |
P |
|
|
MSB L&P |
56 |
Y |
P |
|
|
MSB L&P |
57 |
Y |
P |
|
|
MSB L&P |
58 |
Y |
P |
|
|
MSB L&P |
59 |
Y |
P |
|
|
MSB L&P |
60 |
Y |
P |
|
|
MSB L&P |
61 |
Y |
P |
|
|
MSB L&P |
62 |
Y |
P |
|
|
MSB L&P |
63 |
Y |
P |
|
|
MSB L&P |
64 |
Y |
P |
|
|
MSB L&P |
65 |
Y |
P |
|
|
MSB L&P |
66 |
Y |
P |
|
|
MSB L&P |
67 |
Y |
P |
|
|
MSB L&P |
71 |
Y |
P |
|
|
MSB L&P |
72 |
Y |
P |
|
|
MSB SA-A |
1 |
Y |
P |
|
|
MSB SA-A |
2 |
Y |
P |
|
|
MSB SA-A |
3 |
Y |
P |
|
|
MSB SA-A |
4 |
Y |
P |
|
|
MSB SA-A |
5 |
Y |
P |
|
|
MSB SA-A |
6 |
Y |
P |
|
|
MSB SA-A |
10 |
Y |
P |
|
|
MSB SA-A |
11 |
Y |
P |
|
|
MSB SA-A |
12 |
Y |
P |
|
|
MSB SA-A |
13 |
Y |
P |
|
|
MSB SA-A |
14 |
Y |
P |
|
|
MSB SA-B |
1 |
Y |
P |
|
|
MSB SA-B |
2 |
Y |
P |
|
|
MSB SA-B |
3 |
Y |
P |
|
|
MSB SA-B |
4 |
Y |
P |
|
|
MSB SA-B |
5 |
Y |
P |
|
|
MSB SA-B |
6 |
Y |
P |
|
|
MSB SA-B |
10 |
Y |
P |
|
|
MSB SA-B |
11 |
Y |
P |
|
|
MSB SA-B |
12 |
Y |
P |
|
|
MSB SA-B |
13 |
Y |
P |
|
|
MSB SA-B |
14 |
Y |
P |
|
|
MSB EL |
1 |
Y |
P |
|
|
MSB EL |
2 |
Y |
P |
|
|
MSB EL |
3 |
Y |
P |
|
|
MSB EL |
4 |
Y |
P |
|
|
MSB EL |
7 |
Y |
P |
|
|
Db1 |
1 |
Y |
P |
|
|
Db1 |
2 |
Y |
P |
|
|
Db1 |
3 |
Y |
P |
|
|
Db1 |
4 |
Y |
P |
|
|
Db1 |
5 |
Y |
P |
|
|
Db1 |
6 |
Y |
P |
|
|
Db1 |
7 |
Y |
P |
|
|
Db1 |
8 |
Y |
P |
|
|
Db1 |
9 |
Y |
P |
|
|
Db1 |
10 |
Y |
P |
|
|
Db1 |
11 |
Y |
P |
|
|
Db1 |
12 |
Y |
P |
|
|
Db1 |
13 |
Y |
P |
|
|
Db1 |
14 |
Y |
P |
|
|
Db1 |
15 |
Y |
P |
|
|
Db1 |
16 |
Y |
P |
|
|
Db1 |
17 |
Y |
P |
|
|
Db1 |
18 |
Y |
P |
|
|
Db1 |
19 |
Y |
P |
|
|
Db1 |
20 |
Y |
P |
|
|
Db1 |
21 |
Y |
P |
|
|
Db1 |
22 |
Y |
P |
|
|
Db1 |
23 |
Y |
P |
|
|
Db1 |
24 |
Y |
P |
|
|
Db1 |
25 |
Y |
P |
|
|
Db1 |
26 |
Y |
P |
|
|
Db1 |
27 |
Y |
P |
|
|
Db1 |
29 |
Y |
P |
|
|
Db1 |
31 |
Y |
P |
|
|
Db2 |
1 |
Y |
P |
|
|
Db2 |
2 |
Y |
P |
|
|
Db2 |
3 |
Y |
P |
|
|
Db2 |
4 |
Y |
P |
|
|
Db2 |
5 |
Y |
P |
|
|
Db2 |
6 |
Y |
P |
|
|
Db2 |
7 |
Y |
P |
|
|
Db2 |
8 |
Y |
P |
|
|
Db2 |
9 |
Y |
P |
|
|
Db2 |
10 |
Y |
P |
|
|
Db2 |
11 |
Y |
P |
|
|
Db2 |
12 |
Y |
P |
|
|
Db2 |
13 |
Y |
P |
|
|
Db2 |
14 |
Y |
P |
|
|
Db2 |
15 |
Y |
P |
|
|
Db2 |
16 |
Y |
P |
|
|
Db2 |
17 |
Y |
P |
|
|
Db2 |
18 |
Y |
P |
|
|
Db2 |
19 |
Y |
P |
|
|
Db2 |
20 |
Y |
P |
|
|
Db2 |
21 |
Y |
P |
|
|
Db2 |
22 |
Y |
P |
|
|
Db2 |
23 |
Y |
P |
|
|
Db2 |
24 |
Y |
P |
|
|
Db2 |
25 |
Y |
P |
|
|
Db2 |
26 |
Y |
P |
|
|
Db2 |
27 |
Y |
P |
|
|
Db2 |
28 |
Y |
P |
|
|
Db2 |
29 |
Y |
P |
|
|
Db2 |
30 |
Y |
P |
|
|
Db2 |
31 |
Y |
P |
|
|
Db2 |
32 |
Y |
P |
|
|
Db2 |
33 |
Y |
P |
|
|
Db2 |
35 |
Y |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
MSB |
1 |
S |
Y |
Y |
Y |
P |
|
|
|
|
2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
4 |
S |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
8 |
S |
Y |
Y |
Y |
P |
|
|
|
|
9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
11 |
S |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
13 |
S |
Y |
Y |
Y |
P |
|
|
|
|
14 |
S |
Y |
Y |
Y |
P |
|
|
|
|
15 |
S |
Y |
Y |
Y |
P |
|
|
|
|
16 |
S |
Y |
Y |
Y |
P |
|
|
|
|
17 |
S |
Y |
Y |
Y |
P |
|
|
|
|
18 |
S |
Y |
N |
Y |
F |
Failed 90 min test |
Y |
N |
|
19 |
S |
Y |
Y |
Y |
P |
|
|
|
|
20 |
S |
Y |
Y |
Y |
P |
|
|
|
|
21 |
R |
Y |
Y |
Y |
P |
|
|
|
|
22 |
R |
Y |
Y |
Y |
P |
|
|
|
|
23 |
R |
Y |
Y |
Y |
P |
|
|
|
|
24 |
R |
Y |
Y |
Y |
P |
|
|
|
|
25 |
R |
Y |
Y |
Y |
P |
|
|
|
|
26 |
R |
Y |
Y |
Y |
P |
|
|
|
|
27 |
R |
Y |
Y |
Y |
P |
|
|
|
|
28 |
R |
Y |
Y |
Y |
P |
|
|
|
|
29 |
S |
Y |
Y |
Y |
P |
|
|
|
|
30 |
R |
Y |
Y |
Y |
P |
|
|
|
|
31 |
S |
Y |
Y |
Y |
P |
|
|
|
|
32 |
S |
Y |
Y |
Y |
P |
|
|
|
|
33 |
R |
Y |
Y |
Y |
P |
|
|
|
|
34 |
S |
Y |
Y |
Y |
P |
|
|
|
|
35 |
R |
Y |
Y |
Y |
P |
|
|
|
|
36 |
R |
Y |
Y |
Y |
P |
|
|
|
|
38 |
R |
Y |
Y |
Y |
P |
|
|
|
|
39 |
R |
Y |
Y |
Y |
P |
|
|
|
|
40 |
R |
Y |
Y |
Y |
P |
|
|
|
|
41 |
R |
Y |
Y |
Y |
P |
|
|
|
|
44 |
R |
Y |
Y |
Y |
P |
|
|
|
|
45 |
R |
Y |
Y |
Y |
F |
Missing. Plasterboard ceiling was removed due to water damage. Has not been rectified. |
N/A |
N/A |
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
MSB |
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
10 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
Y |
Y |
Y |
P |
|
|
|
|
13 |
Y |
Y |
Y |
P |
|
|
|
|
14 |
Y |
Y |
Y |
P |
|
|
|
|
15 |
Y |
Y |
Y |
P |
|
|
|
|
16 |
Y |
Y |
Y |
P |
|
|
|
|
17 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
Ufo high bays |
Y |
4ft battens |
Y |
Wall bay fluro light boxes |
Y |
70mm downlights |
Y |
92mm downlights |
Y |
200mm downlights |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
High bay |
Trading floor |
2 |
Not illuminated |
Y |
N |
N |
|
Surface mount emergency light |
#18 |
1 |
Failed 90 min test |
Y |
N |
N |
|
Recessed emergency light |
#45 |
1 |
Previously removed as the plasterboard ceiling was removed due to water damage. Ceiling repairs have not been rectified. |
N/A |
N/A |
N/A |
Observation only. |
Wall bay fluro light boxes |
Trading floor wall bays |
90% |
Faulty or partially illuminated |
N |
TBA |
TBA |
Previously quoted. Please refer to quote #217 |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 02/05/2024 |
---|
| |
---|
| |