Partner NameBuilt Services
StateNSW
Date of Visit07/11/2023
Technician's NameJamieson Cawsey
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0015/0097
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWwetherill_park

Location Namewetherill_park
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB GG1 2 Y P
DB GG1 3 Y P
DB GG1 4 Y P
DB GG1 5 Y P
DB GG1 6 Y P
DB GG1 7 Y P
DB GG1 8 Y P
DB GG1 9 Y P
DB GG1 10 Y P
DB GG1 11 Y P
DB GG1 12 Y P
DB GG1 13 Y P
DB GG1 14 Y P
DB GG1 15 Y P
DB GG1 16 Y P
DB GG1 17 Y P
DB GG1 18 Y P
DB GG1 19 Y P
DB GG1 20 Y P
DB GG1 21 Y P
DB GG1 22 Y P
DB GG1 24 Y P
DB GG1 25 Y P
DB GG1 26 Y P
DB GG1 27 Y P
DB GG1 28 Y P
DB GG1 29 Y P
DB GG1 30 Y P
DB GG1 31 Y P
DB GG1 33 Y P
DB GG1 35 Y P
DB GG1 37 Y P
DB GG1 39 Y P
DB GG1 40 Y P
DB GG1 42 Y P
DB GG1 44 Y P
DB GG1 46 Y P
DB GG1 48 Y P
DB GG1 50 Y P
DB GG1 51 Y P
DB GG1 52 Y P
DB GG1 53 Y P
DB GG1 54 Y P
DB GG2 1 Y P
DB GG2 2 Y P
DB GG2 4 Y P
DB GG2 5 Y P
DB GG2 6 Y P
DB GG2 7 Y P
DB GG2 8 Y P
DB GG2 9 Y P
DB GG2 10 Y P
DB GG2 11 Y P
DB GG2 12 Y P
DB GG2 14 Y P
DB GG2 16 Y P
DB GG2 18 Y P
DB GG2 19 Y P
DB GG2 20 Y P
DB GG2 21 Y P
DB GG2 22 Y P
DB GG2 23 Y P
DB GG2 24 Y P
DB GG2 25 Y P
DB GG2 26 Y P
DB GG2 27 Y P
DB GG2 28 Y P
DB GG2 29 Y P
DB GG2 30 Y P
DB GG2 31 Y P
DB GG2 32 Y P
DB GG2 33 Y P
DB GG2 34 Y P
DB GG2 35 Y P
DB GG2 36 Y P
DB GG2 38 Y P
DB GG2 40 Y P
DB GG2 42 Y P
DB GG2 43 Y P
DB GG2 45 Y P
DB GG2 47 Y P
DB GG2 49 Y P
DB GG2 50 Y P
DB GG2 51 Y P
DB GG2 52 Y P
DB GG2 53 Y P
DB GG2 54 Y P
DB GG2 56 Y P
DB GG2 58 Y P
DB GG2 60 Y P
DB GG2 62 Y P
DB GG2 64 Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB GG1 L1 R Y Y Y P
L2 R Y Y Y P
L3 R Y Y Y P
L4 R Y Y Y P
L5 R Y Y Y P
L6 R Y Y Y P
L7 R Y Y Y P
L8 R Y Y Y P
L9 R Y Y Y P
L11 R Y Y Y P
L11A R Y Y Y P
EM2 S Y Y Y P
EM3 S Y Y Y P
EM4 S Y Y Y P
EM5 S Y Y Y P
EM6 S Y Y Y P
EM7 S Y Y Y P
EM8 S Y Y Y P
EM9 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB GG1 E1 Y Y Y P
E2 Y Y Y P
E3 Y Y Y P
E4 Y Y Y P
E5 Y Y Y P
E6 Y Y Y P
E7 Y Y Y P
E8 Y Y Y P
E9 Y Y Y P
E10 Y Y Y P
E11 Y Y Y P
E12 Y Y Y P
E13 Y Y Y P
E14 Y Y Y P
E15 Y Y Y P
E16 Y Y Y P
E17 Y Y Y P
E18 Y Y Y P
E19 Y Y Y P
E20 Y Y Y P
E21 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
High Bay Halo Globe Y
2x30w Diffused Fluoro Fitting Y
50mm LED Downlight Y
Fluoro Pelmet Light Boxes Y
Low Bay Lights Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
. . . . . . . .
Next Test Due in 6 months07/05/2024