Partner Name | Built Services |
---|
State | NSW |
---|
Date of Visit | 10/10/2023 |
---|
Technician's Name | Bailey Pascoe |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0015/0090 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in NSW | port_macquarie |
---|
|
|
---|
Location Name | Port Macquarie |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Initial/12 Months) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
|
1R |
Y |
P |
|
|
|
2W |
Y |
P |
|
|
|
8W |
Y |
P |
|
|
|
9W |
Y |
P |
|
|
|
10R |
Y |
P |
|
|
|
11W |
Y |
P |
|
|
|
12B |
Y |
P |
|
|
|
16R |
Y |
P |
|
|
|
17W |
Y |
P |
|
|
|
18B |
Y |
P |
|
|
|
19R |
Y |
P |
|
|
|
20W |
Y |
P |
|
|
|
21B |
Y |
P |
|
|
|
22R |
Y |
P |
|
|
|
23W |
Y |
P |
|
|
|
24B |
Y |
P |
|
|
|
25R |
Y |
P |
|
|
|
26W |
Y |
P |
|
|
|
27B |
Y |
P |
|
|
|
28R |
Y |
P |
|
|
|
29W |
Y |
P |
|
|
|
34R |
Y |
P |
|
|
|
35W |
Y |
P |
|
|
|
36B |
Y |
P |
|
|
|
37R |
Y |
P |
|
|
|
38W |
Y |
P |
|
|
|
39B |
Y |
P |
|
|
|
40R |
Y |
P |
|
|
|
41W |
Y |
P |
|
|
|
43R |
Y |
P |
|
|
|
44W |
Y |
P |
|
|
|
45B |
Y |
P |
|
|
|
46R |
Y |
P |
|
|
|
47W |
Y |
P |
|
|
|
48B |
Y |
P |
|
|
|
49R |
Y |
P |
|
|
|
52R |
Y |
P |
|
|
|
53W |
Y |
P |
|
|
|
54B |
Y |
P |
|
|
|
55R |
Y |
P |
|
|
|
56W |
Y |
P |
|
|
|
57B |
Y |
P |
|
|
|
61R |
Y |
P |
|
|
|
62W |
Y |
P |
|
|
|
63B |
Y |
P |
|
|
|
64R |
Y |
P |
|
|
|
65W |
Y |
P |
|
|
|
66B |
Y |
P |
|
|
|
67R |
Y |
P |
|
|
|
68W |
Y |
P |
|
|
|
69B |
Y |
P |
|
|
|
70R |
Y |
P |
|
|
|
71W |
Y |
P |
|
|
|
72B |
Y |
P |
|
|
|
73R |
Y |
P |
|
|
|
74W |
Y |
P |
|
|
|
75B |
Y |
P |
|
|
|
76R |
Y |
P |
|
|
|
80W |
Y |
P |
|
|
|
83W |
Y |
P |
|
|
|
84B |
Y |
P |
|
|
|
85R |
Y |
P |
|
|
|
86W |
Y |
P |
|
|
|
87B |
Y |
P |
|
|
|
88R |
Y |
P |
|
|
|
89W |
Y |
P |
|
|
|
90B |
Y |
P |
|
|
|
91R |
Y |
P |
|
|
|
92W |
Y |
P |
|
|
|
94R |
Y |
P |
|
|
|
95W |
Y |
P |
|
|
|
97R |
Y |
P |
|
|
|
98W |
Y |
P |
|
|
|
99B |
Y |
P |
|
|
|
100R |
Y |
P |
|
|
|
101W |
Y |
P |
|
|
|
102B |
Y |
P |
|
|
|
103R |
Y |
P |
|
|
|
104W |
Y |
P |
|
|
|
105B |
Y |
P |
|
|
|
106R |
Y |
P |
|
|
|
107W |
Y |
P |
|
|
|
108B |
Y |
P |
|
|
|
109R |
Y |
P |
|
|
|
110W |
Y |
P |
|
|
|
111B |
Y |
P |
|
|
|
112R |
Y |
P |
|
|
|
113W |
Y |
P |
|
|
|
114B |
Y |
P |
|
|
|
115R |
Y |
P |
|
|
|
116W |
Y |
P |
|
|
|
117B |
Y |
P |
|
|
|
118R |
Y |
P |
|
|
|
119W |
Y |
P |
|
|
|
120B |
Y |
P |
|
|
|
121R |
Y |
P |
|
|
|
122W |
Y |
P |
|
|
|
123B |
Y |
P |
|
|
|
124R |
Y |
P |
|
|
|
125W |
Y |
P |
|
|
|
126B |
Y |
P |
|
|
|
127R |
Y |
P |
|
|
|
128W |
Y |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB1 |
1 |
|
Y |
Y |
Y |
P |
|
|
|
|
2 |
|
Y |
Y |
Y |
P |
|
|
|
|
3 |
|
Y |
Y |
Y |
P |
|
|
|
|
4 |
|
Y |
Y |
Y |
P |
|
|
|
|
5 |
|
Y |
Y |
Y |
P |
|
|
|
|
6 |
|
Y |
Y |
Y |
P |
|
|
|
|
7 |
|
Y |
Y |
Y |
P |
|
|
|
|
8 |
|
Y |
Y |
Y |
P |
|
|
|
|
9 |
|
Y |
Y |
Y |
P |
|
|
|
|
10 |
|
Y |
Y |
Y |
P |
|
|
|
|
11 |
|
Y |
Y |
Y |
P |
|
|
|
|
12 |
|
Y |
Y |
Y |
P |
|
|
|
|
13 |
|
Y |
Y |
Y |
P |
|
|
|
|
14 |
|
Y |
Y |
Y |
P |
|
|
|
|
15 |
|
N |
N |
Y |
F |
Failed 90 Min Test |
Y |
Y |
DB2 |
1 |
|
Y |
Y |
Y |
P |
|
|
|
|
2 |
|
Y |
Y |
Y |
P |
|
|
|
|
3 |
|
Y |
Y |
Y |
P |
|
|
|
|
4 |
|
Y |
Y |
Y |
P |
|
|
|
|
5 |
|
Y |
Y |
Y |
P |
|
|
|
|
6 |
|
Y |
Y |
Y |
P |
|
|
|
|
7 |
|
Y |
Y |
Y |
P |
|
|
|
|
8 |
|
Y |
Y |
Y |
P |
|
|
|
|
9 |
|
Y |
Y |
Y |
P |
|
|
|
|
10 |
|
Y |
Y |
Y |
P |
|
|
|
|
11 |
|
Y |
Y |
Y |
P |
|
|
|
|
2 |
|
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB1 |
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
DB2 |
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
10 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
Y |
Y |
Y |
P |
|
|
|
|
13 |
Y |
Y |
Y |
P |
|
|
|
|
14 |
Y |
Y |
Y |
P |
|
|
|
|
15 |
Y |
Y |
Y |
P |
|
|
|
|
16 |
Y |
Y |
Y |
P |
|
|
|
|
17 |
Y |
Y |
Y |
P |
|
|
|
|
18 |
Y |
Y |
Y |
P |
|
|
|
|
19 |
Y |
Y |
Y |
P |
|
|
|
|
20 |
Y |
Y |
Y |
P |
|
|
|
|
21 |
Y |
Y |
Y |
P |
|
|
|
|
22 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
200W Square Fluoro |
Y |
200W High Bay Fluoro |
Y |
36W Single Fluoro with LED Tubes |
Y |
2x36W Fluoro Fittings with LED Tubes |
Y |
2x28W Fluoro Fitting |
Y |
18W Fluoro Fitting |
Y |
30W Fluoro Fitting |
Y |
36W Emergency Maintained Fluoro |
Y |
LED Exit Light |
Y |
Twin Halogen Spot Emergency Floodlight |
Y |
LED Spitfire |
Y |
|
---|
Are there any Warranty items needing to be repaired? | Yes |
---|
WARRANTY | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault/problem |
Manufacturer |
Part Number |
Repaired on Site |
Comments |
Recessed Emergency light |
#15 |
1 |
Failed 90 Min Test |
LVX |
- |
Y |
|
High Bay Light |
Warehouse |
1 |
Flickering |
VIBE |
- |
Y |
|
|
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
LED Panel |
Warehouse |
1 |
Faulty |
Y |
N |
N |
|
Domestic Power boards |
Shop Floor |
Unkown |
Large Amount of Domestic Power Boards Used On Site With No Surge Protection |
N |
TBA |
TBA |
Recommend Surge Protection. Added To Fortnightly Repairs List. |
Maintenance Logbook Foler |
FOH |
1 |
Missing |
Y |
N |
N |
New folder created and sent to store. |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 10/04/2024 |
---|
| |
---|
| |