| Partner Name | Built Services |
|---|
| State | NSW |
|---|
| Date of Visit | 13/10/2023 |
|---|
| Technician's Name | Sean Ladds |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 50F0015/0092 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in NSW | coffs_harbour |
|---|
|
|
|---|
| Location Name | Coffs Harbour |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | 12 Monthly (90 minutes) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| RCD Details (Initial/12 Months) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB1 |
14 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
18 |
Y |
P |
|
|
|
44 |
Y |
P |
|
|
|
46 |
Y |
P |
|
|
|
48 |
Y |
P |
|
|
|
50 |
Y |
P |
|
|
|
52 |
Y |
P |
|
|
|
54 |
Y |
P |
|
|
|
56 |
Y |
P |
|
|
|
58 |
Y |
P |
|
|
|
60 |
Y |
P |
|
|
|
62 |
Y |
P |
|
|
|
64 |
Y |
P |
|
|
|
66 |
Y |
P |
|
|
|
68 |
Y |
P |
|
|
|
70 |
Y |
P |
|
|
|
72 |
Y |
P |
|
|
| DB2 |
2 |
Y |
P |
|
|
|
4 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
18 |
Y |
P |
|
|
|
22 |
Y |
P |
|
|
| DB3 |
2 |
Y |
P |
|
|
|
4 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
13 |
Y |
P |
|
|
|
14 |
Y |
P |
|
|
|
15 |
Y |
P |
Staff have reported tripping |
|
|
16 |
Y |
P |
|
|
|
17 |
Y |
P |
|
|
|
18 |
Y |
P |
|
|
|
20 |
Y |
P |
|
|
|
22 |
Y |
P |
|
|
|
23 |
Y |
P |
|
|
|
24 |
Y |
P |
|
|
| DB4 |
1 |
Y |
P |
|
|
|
2 |
Y |
P |
|
|
|
3 |
Y |
P |
|
|
|
4 |
Y |
P |
|
|
|
5 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
7 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
9 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
18 |
Y |
P |
|
|
|
19 |
Y |
P |
|
|
|
20 |
Y |
P |
|
|
|
21 |
Y |
P |
|
|
|
22 |
Y |
P |
|
|
|
24 |
Y |
P |
|
|
|
26 |
Y |
P |
|
|
|
27 |
Y |
P |
|
|
|
28 |
Y |
P |
|
|
|
29 |
Y |
P |
|
|
|
30 |
Y |
P |
|
|
|
31 |
Y |
P |
|
|
|
32 |
Y |
P |
|
|
|
33 |
Y |
P |
|
|
|
34 |
Y |
P |
|
|
|
11 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
13 |
Y |
P |
|
|
|
14 |
Y |
P |
|
|
|
15 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
17 |
Y |
P |
|
|
|
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB1 |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
3 |
R |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
N |
N |
F |
Failed 90 Min Test |
Y |
N |
|
7 |
S |
Y |
N |
N |
F |
Failed 90 Min Test |
Y |
N |
|
8 |
S |
Y |
N |
N |
F |
Failed 90 Min Test |
Y |
N |
|
9 |
S |
Y |
N |
N |
F |
Failed 90 Min Test |
Y |
N |
|
10 |
S |
Y |
N |
N |
F |
Failed 90 Min Test |
Y |
N |
|
12 |
S |
Y |
N |
N |
F |
Failed 90 Min Test |
Y |
N |
|
13 |
S |
Y |
N |
N |
F |
Failed 90 Min Test |
Y |
N |
|
17 |
S |
Y |
N |
N |
F |
Failed 90 Min Test |
Y |
N |
| DB2 |
18 |
R |
Y |
Y |
Y |
P |
|
|
|
|
20 |
R |
Y |
Y |
Y |
P |
|
|
|
|
21 |
R |
Y |
Y |
Y |
P |
|
|
|
|
22 |
R |
Y |
Y |
Y |
P |
|
|
|
|
23 |
R |
Y |
Y |
Y |
P |
|
|
|
|
25 |
R |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB1 |
1 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
N |
N |
F |
Failed 90 Min Test |
Y |
N |
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
14 |
Y |
Y |
Y |
P |
|
|
|
|
15 |
Y |
N |
N |
F |
Failed 90 Min Test |
Y |
N |
|
16 |
Y |
N |
N |
F |
Failed 90 Min Test |
Y |
N |
| DB2 |
19 |
Y |
Y |
Y |
P |
|
|
|
|
24 |
Y |
Y |
Y |
P |
|
|
|
|
26 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| 2x36W Lamps |
Y |
| Hi Bays |
Y |
| 18W PL Lamp |
Y |
| 1x36W Lamps |
Y |
| LED Down Lights |
Y |
| 1x18W Lamps |
Y |
| 2x18W Lamps |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| Surface mount emergency light |
#5 |
1 |
Failed 90 min test |
Y |
N |
N |
|
| Surface mount emergency light |
#7 |
1 |
Failed 90 min test |
Y |
N |
N |
|
| Surface mount emergency light |
#8 |
1 |
Failed 90 min test |
Y |
N |
N |
|
| Surface mount emergency light |
#9 |
1 |
Failed 90 min test |
Y |
N |
N |
|
| Surface mount emergency light |
#10 |
1 |
Failed 90 min test |
Y |
N |
N |
|
| Surface mount emergency light |
#12 |
1 |
Failed 90 min test |
Y |
N |
N |
|
| Surface mount emergency light |
#13 |
1 |
Failed 90 min test |
Y |
N |
N |
|
| Surface mount emergency light |
#17 |
1 |
Failed 90 min test |
Y |
N |
N |
|
| Exit light |
#4 |
1 |
Failed 90 min test |
Y |
N |
N |
|
| Exit light |
#15 |
1 |
Failed 90 min test |
Y |
N |
N |
|
| Exit light |
#16 |
1 |
Failed 90 min test |
Y |
N |
N |
|
| 2ft Fluro lamp |
Mobile phone area |
2 |
Not working |
N |
TBA |
TBA |
Added to fortnightly repairs list as works have already exceeded limit. |
| 4ft Fluro lamp |
Printer area |
2 |
Not working |
N |
TBA |
TBA |
Added to fortnightly repairs list as works have already exceeded limit. |
| LED troffer |
Lunchroom |
1 |
Not working |
N |
TBA |
TBA |
Added to fortnightly repairs list as works have already exceeded limit. |
| Weatherproof batten |
South entry - external |
1 |
Not working |
N |
TBA |
TBA |
Added to fortnightly repairs list as works have already exceeded limit. |
| High bay |
Above LG fridges |
1 |
Not working |
N |
TBA |
TBA |
Added to fortnightly repairs list as works have already exceeded limit. |
|
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Next Test Due in 6 months | 13/04/2024 |
|---|
| |
|---|
| |