Partner NameCommlec Electrical PTY LTD
StateNSW
Date of Visit15/02/2024
Technician's NameMitch Cutts
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50f0015/0237
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWmaitland_east

Location NameMaitland East
HTML Block
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB1 2 Y P
DB1 4 Y P
DB1 6 Y P
DB1 8 Y P
DB1 10 Y P
DB1 30 Y P
DB1 32 Y P
DB1 34 Y P
DB1 36 Y P
DB1 38 Y P
DB1 40 Y P
DB1 42 Y P
DB1 44 Y P
DB1 46 Y P
DB1 48 Y P
DB1 50 Y P
DB1 52 Y P
DB1 54 Y P
DB1 56 Y P
DB1 58 Y P
DB1 60 Y P
DB2 2 Y P
DB2 4 Y P
DB2 6 Y P
DB2 8 Y P
DB2 38 Y P
DB2 39 Y P
DB2 40 Y P
DB2 41 Y P
DB2 42 Y P
DB2 43 Y P
DB2 45 Y P
DB2 47 Y P
DB2 49 Y P
DB3 5 Y P
DB3 7 Y P
DB3 8 Y P
DB3 9 Y P
DB3 11 Y P
DB3 12 Y P
DB3 13 Y P
DB3 14 Y P
DB3 16 Y P
DB3 18 Y P
DB3 21 Y P
DB3 25 Y P
DB3 33 Y P
DB4 1 Y P
DB4 2 Y P
DB4 3 Y P
DB4 4 Y P
DB4 5 Y P
DB4 6 Y P
DB4 7 Y P
DB4 8 Y P
DB4 9 Y P
DB4 10 Y P
DB4 11 Y P
DB4 12 Y P
DB4 13 Y P
DB4 14 Y P
DB4 15 Y P
DB4 16 Y P
DB4 17 Y P
DB4 18 Y P
DB4 19 Y P
DB4 21 Y P
DB4 23 Y P
DB4 25 Y P
DB4 27 Y P
DB4 29 Y P
DB4 31 Y P
DB4 33 Y P
DB4 35 Y P
SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 6 DOUBLE SPOT Y Y Y P
DB1 7 DOUBLE SPOT Y Y Y P
DB1 8 DOUBLE SPOT Y Y Y P
DB1 9 DOUBLE SPOT Y Y Y P
DB1 13 S Y Y Y P
DB3 12 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB3 1 Y Y Y P
DB3 2 Y Y Y P
DB1 3 Y Y Y P
DB1 4 Y Y Y P
DB1 5 Y Y Y P
DB1 10 Y Y Y P
DB1 11 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
30W LED batten Y
30w LED Panel Y
150w LED Hi-Bay Y
Are there any Warranty items needing to be repaired?No
Site Status SelectorStore now fully compliant
Next Test Due in 6 months15/08/2024