Partner Name | Transit Electrical Pty Ltd |
---|
State | WA |
---|
Date of Visit | 12/04/2024 |
---|
Technician's Name | Connor Stevens |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0023/0113 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in WA | midland |
---|
|
|
---|
Location Name | Midland |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB 01 |
1B |
Y |
P |
|
|
DB 01 |
2B |
Y |
P |
|
|
DB 01 |
3R |
Y |
P |
|
|
DB 01 |
3W |
Y |
P |
|
|
DB 01 |
3B |
Y |
P |
|
|
DB 01 |
4R |
Y |
P |
|
|
DB 01 |
4W |
Y |
P |
|
|
DB 01 |
4B |
Y |
P |
|
|
DB 01 |
5R |
Y |
P |
|
|
DB 01 |
5W |
Y |
P |
|
|
DB 01 |
5B |
Y |
P |
|
|
DB 01 |
6R |
Y |
P |
|
|
DB 01 |
6W |
Y |
P |
|
|
DB 01 |
6B |
Y |
P |
|
|
DB 01 |
7R |
Y |
P |
|
|
DB 01 |
25B |
Y |
P |
|
|
DB 01 |
26R |
Y |
P |
|
|
DB 01 |
26W |
Y |
P |
|
|
DB 01 |
26B |
Y |
P |
|
|
DB 01 |
27R |
Y |
P |
|
|
DB 01 |
29R |
Y |
P |
|
|
DB 01 |
29W |
Y |
P |
|
|
DB 01 |
29B |
Y |
P |
|
|
DB 01 |
31R |
Y |
P |
|
|
DB 01 |
31W |
Y |
P |
|
|
DB 01 |
31B |
Y |
P |
|
|
DB 01 |
32W |
Y |
P |
|
|
DB 01 |
32B |
Y |
P |
|
|
DB 01 |
33R |
Y |
P |
|
|
DB 01 |
33WB, 35R |
Y |
P |
|
|
DB 01 |
36B |
Y |
P |
|
|
DB 01 |
37W |
Y |
P |
|
|
DB 01 |
37B |
Y |
P |
|
|
DB 01 |
38R |
Y |
P |
|
|
DB 01 |
38W |
Y |
P |
|
|
DB 01 |
38B |
Y |
P |
|
|
DB 01 |
39W |
Y |
P |
|
|
DB 01 |
39B |
Y |
P |
|
|
DB 01 |
40R |
Y |
P |
|
|
DB 01 |
40W |
Y |
P |
|
|
DB 01 |
40B |
Y |
P |
|
|
DB 02 |
2W |
Y |
P |
|
|
DB 02 |
7R |
Y |
P |
|
|
DB 02 |
7W |
Y |
P |
|
|
DB 02 |
7B |
Y |
P |
|
|
DB 02 |
8W |
Y |
P |
|
|
DB 02 |
9W |
Y |
P |
|
|
DB 02 |
10R |
Y |
P |
|
|
DB 02 |
10W |
Y |
P |
|
|
DB 02 |
10B |
Y |
P |
|
|
DB 02 |
11W |
Y |
P |
|
|
DB 02 |
11B |
Y |
P |
|
|
DB 02 |
12R |
Y |
P |
|
|
DB 02 |
12W |
Y |
P |
|
|
DB 02 |
12B |
Y |
P |
|
|
DB 02 |
13R |
Y |
P |
|
|
DB 02 |
13W |
Y |
P |
|
|
DB 02 |
13B |
Y |
P |
|
|
DB 02 |
14R |
Y |
P |
|
|
DB 02 |
14W |
Y |
P |
|
|
DB 02 |
14B |
Y |
P |
|
|
DB 02 |
15R |
Y |
P |
|
|
DB 02 |
15W |
Y |
P |
|
|
DB 02 |
15B |
Y |
P |
|
|
DB 02 |
14B |
Y |
P |
|
|
DB 02 |
16R |
Y |
P |
|
|
DB 02 |
16W |
Y |
P |
|
|
DB 02 |
16B |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
2 |
S-2 by 36w batten |
Y |
Y |
Y |
P |
|
|
|
|
3 |
S-2 by 36w batten |
Y |
Y |
Y |
P |
|
|
|
|
4 |
S-2 by 36w batten |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
6 |
R |
Y |
Y |
Y |
P |
|
|
|
|
7 |
R |
Y |
Y |
Y |
P |
|
|
|
|
8 |
R |
Y |
Y |
Y |
P |
|
|
|
|
9 |
R |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
11 |
S |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S-2 by 36w batten |
Y |
Y |
Y |
P |
|
|
|
|
13 |
R |
Y |
Y |
Y |
P |
|
|
|
|
14 |
S |
Y |
Y |
Y |
P |
|
|
|
|
15 |
S |
Y |
Y |
Y |
P |
|
|
|
|
16 |
S |
Y |
Y |
Y |
P |
|
|
|
|
19 |
S-2 by 36w batten |
Y |
Y |
Y |
P |
|
|
|
|
24 |
S-2 by 36w batten |
Y |
Y |
Y |
P |
|
|
|
|
25 |
R |
Y |
Y |
Y |
P |
|
|
|
|
26 |
S |
Y |
Y |
Y |
P |
|
|
|
|
27 |
R |
Y |
Y |
Y |
P |
|
|
|
|
28 |
R |
Y |
Y |
Y |
P |
|
|
|
|
29 |
R |
Y |
Y |
Y |
P |
|
|
|
|
30 |
R |
Y |
Y |
Y |
P |
|
|
|
|
31 |
R |
Y |
Y |
Y |
P |
|
|
|
|
32 |
R |
Y |
Y |
Y |
P |
|
|
|
|
43 |
S |
Y |
Y |
Y |
P |
|
|
|
|
44 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
1 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
17 |
Y |
Y |
Y |
P |
|
|
|
|
18 |
Y |
Y |
Y |
P |
|
|
|
|
21 |
Y |
Y |
Y |
P |
|
|
|
|
22 |
Y |
Y |
Y |
P |
|
|
|
|
23 |
Y |
Y |
Y |
P |
|
|
|
|
24 |
Y |
Y |
Y |
P |
|
|
|
|
33 |
Y |
Y |
Y |
P |
|
|
|
|
34 |
Y |
Y |
Y |
P |
|
|
|
|
35 |
Y |
Y |
Y |
P |
|
|
|
|
36 |
Y |
Y |
Y |
P |
|
|
|
|
37 |
Y |
Y |
Y |
P |
|
|
|
|
38 |
Y |
Y |
Y |
P |
|
|
|
|
39 |
Y |
Y |
Y |
P |
|
|
|
|
40 |
Y |
Y |
Y |
P |
|
|
|
|
41 |
Y |
Y |
Y |
P |
|
|
|
|
42 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
400 MH Hibay |
Y |
LED Hibay |
Y |
150w MH shop light |
Y |
50w 12v down lights |
Y |
Jumbo exit |
Y |
Exit |
Y |
Twin par 38 flood light |
Y |
400w low bay |
Y |
60w ES bunker light |
Y |
2 by 36w defused batten |
Y |
1 by 36w defused batten |
Y |
LED oyster light |
Y |
Spitfire emergency |
Y |
2 by 36w defused emergency batten |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Haier Oven Display Lighting |
Haier Oven Display |
1 |
None of the lighting works, has power |
N |
N |
N |
Unable to gain access due to the way cabinet is built. Have made Compliance aware. They will contact Supplier. |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 12/10/2024 |
---|
| |
---|
| |