Carry out push button test and record the results below.
THERMOGRAPHIC TEST RESULTS
THERMOGRAPHIC TEST RESULTS
RCD Details (6 Month)
Distribution Board No.
Circuit No.
Push Button (YorN)
Pass / Fail (PorF)
Fault?
Repaired on Site (YorN)
DB 01
3W
Y
P
DB 01
3B
Y
P
DB 01
5R
Y
P
DB 01
5W
Y
P
DB 01
5B
Y
P
DB 01
6B
Y
P
DB 01
7R
Y
P
DB 01
8B
Y
P
DB 01
9R
Y
P
DB 01
9W
Y
P
DB 01
10R
Y
P
DB 01
10W
Y
P
DB 01
10B
Y
P
DB 01
11R
Y
P
DB 01
11W
Y
P
DB 01
11B
Y
P
DB 01
12R
Y
P
DB 01
12W
Y
P
DB 01
12B
Y
P
DB 01
13R
Y
P
DB 01
13W
Y
P
DB 01
R14
Y
P
DB 01
15R
Y
P
DB 01
15W
Y
P
DB 01
19R
Y
P
DB 01
19W
Y
P
DB 01
20W
Y
P
DB 01
20B
Y
P
DB 01
23R
Y
P
DB 01
23W
Y
P
DB 01
24W
Y
P
DB 01
24B
Y
P
DB 01
26RWB
Y
P
DB 01
27R
Y
P
DB 01
30R
Y
P
DB 01
31R
Y
P
DB 01
31B
Y
P
DB 01
32R
Y
P
DB 01
32W
Y
P
DB 01
32B
Y
P
DB 01
33R
Y
P
DB 01
33W
Y
P
DB 01
33B
Y
P
DB 01
34R
Y
P
DB 01
34W
Y
P
DB 01
34B
Y
P
DB 02
3W
Y
P
DB 02
3B
Y
P
DB 02
5R
Y
P
DB 02
5W
Y
P
DB 02
5B
Y
P
DB 02
6R
Y
P
DB 02
6W
Y
P
DB 02
6B
Y
P
DB 02
7R
Y
P
DB 02
7W
Y
P
DB 02
7B
Y
P
DB 02
8R
Y
P
DB 02
8W
Y
P
DB 02
8B
Y
P
DB 02
9R
Y
P
DB 02
9W
Y
P
DB 02
9B
Y
P
DB 02
10R
Y
P
DB 02
13W
Y
P
DB 02
17R
Y
P
DB 02
18W
Y
P
DB 02 - B
1W
Y
P
DB 02 - B
1R
Y
P
DB 02 - B
1B
Y
P
DB 02 - B
2R
Y
P
DB 02 - B
2W
Y
P
DB 02 - B
3R
Y
P
DB 02 - B
11RWB
Y
P
SF43 Exit/Emergency
SF43 EXIT/EMERGENCY LIGHTING
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Timers
Check timers for correct operation and timing
Switched Socket Outlets
Carry out visual check on SSOs for signs of misuse, blackening or deterioration
Check and report any outlets with multiple power boards overloading
Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No.
ID No.
Surface mounted or recessed? (SorR)
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DB 01
2
R
Y
Y
Y
P
DB 01
3
S
Y
Y
Y
P
DB 01
4
S
Y
Y
Y
P
DB 01
5
S
Y
Y
Y
P
DB 01
6
S
Y
Y
Y
P
DB 01
7
S
Y
Y
Y
P
DB 01
8
S
Y
Y
Y
P
DB 01
9
S
Y
Y
Y
P
DB 01
10
Twin tubed batten
Y
Y
Y
P
DB 01
11
S
Y
Y
Y
P
DB 01
12
Twin tubed batten
Y
Y
Y
P
DB 02
13
R
Y
Y
Y
P
DB 02
14
R
Y
Y
Y
P
DB 02
15
R
Y
Y
Y
P
DB 02
17
R
Y
Y
Y
P
DB 02
19
R
Y
Y
Y
P
DB 02
20
R
Y
Y
Y
P
DB 02
22
S
Y
Y
Y
P
DB 02
23
S
Y
Y
Y
P
DB 02
24
S
Y
Y
Y
P
DB 02
25
S
Y
Y
Y
P
HTML Block
EXIT LIGHTS
Distribution Board No.
ID No.
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DB 01
1
Y
Y
Y
P
DB 01
16
Y
Y
Y
P
DB 02
18
Y
Y
Y
P
DB 02
21
Y
Y
Y
P
DB 02
22
Y
Y
Y
P
DB 02
26
Y
Y
Y
P
SF44 General Lighting & Works
SF44 GENERAL LIGHTING & WORKS
General Checklist
Check correct operation of all luminaries
Report on any faulty luminaries/control gear
Provide costing to repair/replace
HTML Block
General Operation/Additional items
Check with Store Manager to ensure there are no other issues
Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au
Yes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten)
Existing (YorN)
400w Low Bay
Y
LED Low Bay
Y
40w Oyster Light
Y
LED Batten Lights
y
LED Hibays
Y
Exit
Y
Emergency Surface Mount
Y
Emergency Recessed
Y
LED Track Lighting
Y
LED Spot Lights
Y
LED Bunker Light
Y
Par 38 Twin Spots
Y
LED Downlight
Y
Are there any Warranty items needing to be repaired?
No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
SAL Bronx Wall Lights
Front Entry
3
2x Strobing, 1x Flickering
N
Y
TBA
All three are next to each other. Quote #998 sent to compliance for consideration
Kitchen Aid
Small Appliances
1
Strobing
Y
N
N
Faulty power supply
Awning Flood Lights
Front Entry
6
Not Illuminated
N
Y
TBA
Out of the 11 Flood Lights 6 have failed and aren't illuminated. Recommend replacing all 11 as remaining 5 are old and close to end of life. Quote #998 sent to compliance for consideration
SAL Bronx Wall
Rear Loading Dock
4
Not Illuminated
N
Y
TBA
Quote #998 sent to compliance for consideration
Batten Screw Globe
Front Awning
1
Not Illuminated
N
Y
TBA
Recommend replacing all 30 as the remaining are yellowing. Quote #998 sent to compliance for consideration
Site Status Selector
Store now fully compliant
Next Test Due in 6 months
17/10/2024
The Built Services Group seeks to apply innovation and technology for greater client services, business efficiencies and thinking Green.