Partner NameTransit Electrical Pty Ltd
StateWA
Date of Visit22/04/2024
Technician's NameConnor Stevens
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0023/0114
EmailEmail hidden; Javascript is required.
The Good Guys Site in WAcockburn

Location NameCockburn
HTML Block
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB 01 Chassis 1 1R Y P
DB 01 1W Y P
1B Y P
3R Y P
3W Y P
3B Y P
5R Y P
5W Y P
5B Y P
7R Y P
7W Y P
7B Y P
9R Y P
9W Y P
9B Y P
11R Y P
11W Y P
11B Y P
13R Y P
13W Y P
13B Y P
15R Y P
15B Y P
2R Y P
2W Y P
2B Y P
4R Y P
4W Y P
4B Y P
6R Y P
6W Y P
6B Y P
8R Y P
8W Y P
8B Y P
10B Y P
12R Y P
12W Y P
12B Y P
14R Y P
14W Y P
14B Y P
DB 01 Chassis 2 17R Y P
17W Y P
17B Y P
RWB19, RW21 Y P
21B Y P
31R Y P
31W Y P
31B Y P
18R Y P
18W Y P
18B Y P
20R Y P
20W Y P
20B Y P
22R Y P
22W Y P
22B Y P
DB 02 1R Y P
1W Y P
1B Y P
3R Y P
3W Y P
3B Y P
5R Y P
5W Y P
5B Y P
7W Y P
7B Y P
RWB9, RW11 Y P
RWB13, RW15 Y P
2R Y P
2W Y P
2B Y P
4R Y P
4W Y P
4B Y P
6R Y P
6W Y P
6B Y P
8R Y P
8W Y P
10R Y P
WB10, RWB12 Y P
W14 Y P
B14 Y P
R16 Y P
W16 Y P
B16 Y P
DB 04 1R Y P
1W Y P
1B Y P
3R Y P
3W Y P
3B Y P
5R Y P
5W Y P
5B Y P
2R Y P
2W Y P
2B Y P
4R Y P
4W Y P
4B Y P
6R Y P
6W Y P
6B Y P
DB 03 1 Y P
3 Y P
4 Y P
6 Y P
7 Y P
8 Y P
8B N F Failed push button test Y
9 Y P
11 Y P
13 Y P
15 Y P
17 Y P
19 Y P
21 Y P
22 Y P
23 Y P
24 Y P
25 Y P
26 Y P
27 Y P
28 Y P
29 Y P
30 Y P
31 Y P
32 Y P
34 Y P
36 Y P
SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB 01 5 S Y Y Y P
6 S Y Y Y P
7 S Y Y Y P
11 S Y Y Y P
12 S Y Y Y P
13 R Y Y Y P
15 R Y Y Y P
16 R Y Y Y P
20 R Y Y Y P
21 R Y Y Y P
22 R Y Y Y P
23 R Y Y Y P
24 R Y Y Y P
25 R Y Y Y P
26 S Y Y Y P
28 R Y Y Y P
31 S Y Y Y P
33 S Y Y Y P
34 S Y Y Y P
35 S Y Y Y P
37 S Y Y Y P
39 R Y Y Y P
40 S Y Y Y P
43 S Y Y Y P
44 S Y Y Y P
50 S Y Y Y P
52 S Y Y Y P
53 S Y Y Y P
54 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB 01 1 Y Y Y P
2 Y Y Y P
3 Y Y Y P
4 Y Y Y P
8 Y Y Y P
9 Y Y Y P
10 Y Y Y P
14 Y Y Y P
DB 03 17 Y Y Y P
18 Y Y Y P
19 Y Y Y P
DB 01 27 Y Y Y P
28 Y Y Y P
29 Y Y Y P
30 Y Y Y P
32 Y Y Y P
36 Y Y Y P
38 Y Y Y P
41 Y Y Y P
42 Y Y Y P
45 Y Y Y P
46 Y Y Y P
47 Y Y Y P
48 Y Y Y P
49 Y Y Y P
51 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
40w B27 batten globe Y
250w MH flood light Y
80w MH bunker light Y
250w lowbay recessed Y
80w MH shop light Y
400w hibay Y
Emergency batten 2 by 36w Y
LED down light 10w Y
Bare batten tv wall Y
Exits Y
400w lowbay Y
1 by 36w defused batten Y
100w LED flood light Y
Twin par 38 flood lightb Y
Oyster light 18w 4 pin plc lamp Y
1 by 18w bare batten Y
Emergency spitfire Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
RCBO #8B DB 03 1 Failed push button test Y N N
Site Status SelectorStore now fully compliant
Next Test Due in 6 months21/10/2024