Partner Name | Sturdie Trade Services |
---|
State | VIC |
---|
Date of Visit | 30/04/2024 |
---|
Technician's Name | Nathan McBain |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0017/0274 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in VIC | ballarat |
---|
|
|
---|
Location Name | Ballarat |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
Sub Board 2A |
04 |
Y |
P |
|
|
Sub Board 2A |
06 |
Y |
P |
|
|
Sub Board 2A |
08 |
Y |
P |
|
|
Sub Board 2A |
10 |
Y |
P |
|
|
Sub Board 2A |
12 |
Y |
P |
|
|
Sub Board 2A |
14 |
Y |
P |
|
|
Sub Board 2A |
16 |
Y |
P |
|
|
Sub Board 2A |
18 |
Y |
P |
|
|
Sub Board 2A |
20 |
Y |
P |
|
|
Sub Board 2A |
22 |
Y |
P |
|
|
Sub Board 2A |
24 |
Y |
P |
|
|
Sub Board 2A |
28 |
Y |
P |
|
|
Sub Board 2A |
29 |
Y |
F |
Failed push button test |
N |
Sub Board 2A |
30 |
Y |
P |
|
|
Sub Board 2A |
31 |
Y |
P |
|
|
Sub Board 2A |
32 |
Y |
P |
|
|
Sub Board 2A |
34 |
Y |
P |
|
|
Sub Board 2A |
35 |
Y |
P |
|
|
Sub Board 2A |
36 |
Y |
P |
|
|
Sub Board 2A |
37 |
Y |
P |
|
|
Sub Board 2A |
38 |
Y |
P |
|
|
Sub Board 2A |
39 |
Y |
P |
|
|
Sub Board 2A |
40 |
Y |
P |
|
|
Sub Board 2A |
41 |
Y |
P |
|
|
Sub Board 2A |
42 |
Y |
P |
|
|
Sub Board 2A |
43 |
Y |
P |
|
|
Sub Board 2A |
44 |
Y |
P |
|
|
Sub Board 2A |
45 |
Y |
P |
|
|
Sub Board 2A |
46 |
Y |
P |
|
|
Sub Board 2A |
47 |
Y |
P |
|
|
Sub Board 2A |
48 |
Y |
P |
|
|
Sub Board 2 |
20 |
Y |
P |
|
|
Sub Board 2 |
24 |
Y |
P |
|
|
Sub Board 2 |
26 |
Y |
P |
|
|
Sub Board 2 |
28 |
Y |
P |
|
|
Sub Board 2 |
40 |
Y |
P |
|
|
Sub Board 2 |
42 |
Y |
P |
|
|
Sub Board 2 |
44 |
Y |
P |
|
|
Sub Board 2 |
46 |
Y |
P |
|
|
Sub Board 2 |
48 |
Y |
P |
|
|
Sub Board 1 |
09 |
Y |
P |
|
|
Sub Board 1 |
11 |
Y |
P |
|
|
Sub Board 1 |
12 |
Y |
P |
|
|
Sub Board 1 |
15 |
Y |
P |
|
|
Sub Board 1 |
17 |
Y |
P |
|
|
Sub Board 1 |
31 |
Y |
P |
|
|
Sub Board 1 |
32 |
Y |
P |
|
|
Sub Board 1 |
40 |
Y |
P |
|
|
Sub Board 1 |
42 |
Y |
P |
|
|
Sub Board 1 |
44 |
Y |
P |
|
|
Sub Board 1 |
46 |
Y |
P |
|
|
Sub Board 1 |
47 |
Y |
P |
|
|
Sub Board 1 |
48 |
Y |
P |
|
|
Sub Board 1 |
50 |
Y |
P |
|
|
Sub Board 1 |
54 |
Y |
P |
|
|
Sub Board 1 |
57 |
Y |
P |
|
|
Sub Board 1A |
01 |
Y |
P |
|
|
Sub Board 1A |
04 |
Y |
P |
|
|
Sub Board 1A |
05 |
Y |
P |
|
|
Sub Board 1A |
07 |
Y |
P |
|
|
Sub Board 1A |
10 |
Y |
P |
|
|
Sub Board 1A |
13 |
Y |
P |
|
|
Sub Board 1A |
16 |
Y |
P |
|
|
Sub Board 1A |
22 |
Y |
P |
|
|
Sub Board 1A |
27 |
Y |
P |
|
|
Sub Board 1A |
29 |
Y |
P |
|
|
Sub Board 1A |
31 |
Y |
P |
|
|
Sub Board 1A |
32 |
Y |
F |
Failed push button test |
N |
Sub Board 1A |
33 |
Y |
P |
|
|
Sub Board 1A |
34 |
Y |
P |
|
|
Sub Board 1A |
35 |
Y |
P |
|
|
Sub Board 1A |
36 |
Y |
P |
|
|
Sub Board 1A |
37 |
Y |
P |
|
|
Sub Board 1A |
38 |
Y |
P |
|
|
Sub Board 1A |
39 |
Y |
P |
|
|
Sub Board 1A |
40 |
Y |
P |
|
|
Sub Board 1A |
41 |
Y |
P |
|
|
Sub Board 1A |
42 |
Y |
P |
|
|
Sub Board 1A |
43 |
Y |
P |
|
|
Sub Board 1A |
44 |
Y |
P |
|
|
Sub Board 1A |
45 |
Y |
P |
|
|
Sub Board 1A |
46 |
Y |
P |
|
|
Sub Board 1A |
47 |
Y |
P |
|
|
Sub Board 1A |
48 |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
Sub Board 2 |
1 |
R |
Y |
Y |
Y |
P |
|
|
|
|
2 |
R |
Y |
Y |
Y |
P |
|
|
|
|
3 |
R |
Y |
Y |
Y |
P |
|
|
|
|
4 |
S |
Y |
Y |
Y |
P |
|
|
|
|
5 |
R |
Y |
Y |
Y |
P |
|
|
|
|
6 |
R |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
8 |
R |
Y |
Y |
Y |
P |
|
|
|
|
9 |
R |
Y |
Y |
Y |
P |
|
|
|
|
10 |
R |
Y |
Y |
Y |
P |
|
|
|
|
11 |
R |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
13 |
R |
Y |
Y |
Y |
P |
|
|
|
|
14 |
R |
Y |
Y |
Y |
P |
|
|
|
|
15 |
R |
Y |
Y |
Y |
P |
|
|
|
|
16 |
R |
Y |
Y |
Y |
P |
|
|
|
|
17 |
R |
Y |
Y |
Y |
P |
|
|
|
|
18 |
R |
Y |
Y |
Y |
P |
|
|
|
|
19 |
R |
Y |
Y |
Y |
P |
|
|
|
|
20 |
R |
Y |
Y |
Y |
P |
|
|
|
|
21 |
R |
Y |
Y |
Y |
P |
|
|
|
|
22 |
S |
Y |
Y |
Y |
P |
|
|
|
|
23 |
S |
Y |
Y |
Y |
P |
|
|
|
|
24 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
Sub Board 2 |
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
10 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
Y |
Y |
Y |
P |
|
|
|
|
13 |
Y |
Y |
Y |
P |
|
|
|
|
14 |
Y |
Y |
Y |
P |
|
|
|
|
15 |
Y |
Y |
Y |
P |
|
|
|
|
16 |
Y |
N |
Y |
F |
Failed 90mins discharge test |
Y |
N |
|
17 |
Y |
Y |
Y |
P |
|
|
|
|
18 |
Y |
Y |
Y |
P |
|
|
|
|
19 |
Y |
Y |
Y |
P |
|
|
|
|
20 |
Y |
Y |
Y |
P |
|
|
|
|
21 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
LED Lights |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Exit Light No.16 |
BOH Downstairs |
1 |
Failed 90mins discharge test |
Y |
N |
N |
|
CB - 29 |
Sub board 2A |
1 |
Failed push button test |
Y |
N |
N |
|
CB - 32 |
Sub Board 1A |
1 |
Failed push button test |
Y |
N |
N |
|
70mm Downlight |
BOH Upstairs |
2 |
Failed to illuminate |
Y |
N |
N |
|
LED Batten |
Fridges |
1 |
Hanging |
Y |
N |
N |
Re-clipped hanging LED batten |
CB43 |
Sub board 2A |
1 |
Tripping on morning start up of store |
N |
N |
N |
Circuit overloaded. No room in trade switchboards. Added to fortnightly repairs list |
CB29 |
Sub board 2A |
1 |
Tripping on morning start up of store |
N |
N |
N |
Circuit overloaded. No room in trade switchboards. Added to fortnightly repairs list |
Tripping circuits |
Sub board 2A |
3-5 |
Tripping |
N |
N |
N |
After completing circuit layout tv area/ fridges, found circuits are overloaded. Additional circuits required. Added to fortnightly repairs list |
Sub Board 1A main connection |
Sub Board 1A |
1 |
No protection on mains |
N |
N |
N |
Install heat shrink. Added to fortnightly repairs list |
Sub Board 2A main connection |
Sub Board 2A |
1 |
No protection on mains |
N |
N |
N |
Install heat shrink. Added to fortnightly repairs list |
Unbalanced circuits |
Sub Board 2A |
1 |
Unbalanced circuits |
N |
N |
N |
Red phase 17A/ White phase 38.1A/ Blue phase 35.6A. Phases to be balanced, works to be performed before trade. Added to fortnightly repairs list |
Ceiling tiles |
Fridges(32)Dishwasher(4)Front entrance(5)/Washing machines(1)/Irons(6)/Heating/Cooling(2)/Small tvs(9)/Audio(14) |
73 |
Damaged/Water damage present |
N |
N |
N |
Observation |
Plaster ceiling |
Mini/Micro Audio |
1 |
Water damage |
N |
N |
N |
Observation |
LED Hi-Bay |
TV Accessories |
2 |
Failed to illuminate |
N |
N |
N |
Added to fortnightly repairs list |
LED Hi-Bay |
TV bulk stack |
1 |
Failed to illuminate |
N |
N |
N |
Added to fortnightly repairs list |
|
---|
Site Status Selector | Completed but with repairs required |
---|
Next Test Due in 6 months | 30/10/2024 |
---|
| |
---|
| |