Partner NameSturdie Trade Services
StateVIC
Date of Visit29/05/2024
Technician's NameAmazigh Tari
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number50F0017/0275
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICnarre_warren

Location NameNarre Warren
HTML Block
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB-13 13 Y P
DB-13 15 Y P
DB-13 17 Y P
DB-13 19 Y P
DB-13 21 Y P
DB-13 23 Y P
DB-13 30 Y P
DB-13 34 Y P
DB-13 35 Y P
DB-13 43 Y P
DB-13 44 Y P
DB-13 45 Y P
DB-13 46 Y P
DB-13 47 Y P
DB-13 48 Y P
DB-13A 1 Y P
DB-13A 2 Y P
DB-13A 3 Y P
DB-13A 4 Y P
DB-13A 5 Y P
DB-13A 6 Y P
DB-13A 7 Y P
DB-13A 8 Y P
DB-13A 10 Y P
DB-13A 12 Y P
DB-13A 13 Y P
DB-13A 15 Y P
DB-13A 17 Y P
DB-13A 19 Y P
DB-13A 21 Y P
DB-13A 23 Y P
DB-13A 25 Y P
DB-13A 26 Y P
DB-13A 28 Y P
DB-13A 29 Y P
DB-13A 30 Y P
DB-13A 31 Y P
DB-13A 32 Y P
DB-13A 33 Y P
DB-13A 34 Y P
DB-13A 35 Y P
DB-13A 36 Y P
DB-13A 37 Y P
DB-13A 39 Y P
DB-13A 41 Y P
DB-12 6 Y P
DB-12 18 Y P
DB-12 21 Y P
DB-12 22 Y P
DB-12 23 Y P
DB-12 27 Y P
DB-12 28 Y P
DB-12 29 Y P
DB-12 30 Y P
DB-12 33 Y P
DB-12 34 Y P
DB-12 35 Y P
DB-12 36 Y P
DB-12 38 Y P
DB-12 47 Y P
DB-12 48 Y P
DB-12B 2 Y P
DB-12B 3 Y P
DB-12B 4 Y P
DB-12B 5 Y P
DB-12B 6 Y P
DB-12B 7 Y P
DB-12B 8 Y P
DB-12B 9 Y P
DB-12B 10 Y P
DB-12B 11 Y P
DB-12B 12 Y P
DB-12B 13 Y P
SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-12 2 S Y Y Y P
DB-12 3 S N N N F Failed 90min discharge test Y N
DB-12 5 S Y Y Y P
DB-12 6 S Y Y Y P
DB-12 7 R Y Y Y P
DB-12 9 R Y Y Y P
DB-13 11 S N N N F Failed 90min discharge test Y N
DB-13 12 S Y Y Y P
DB-13 14 S Y Y Y P
DB-13 15 S Y Y Y P
DB-13 18 R Y Y Y P
DB-13 19 R Y Y Y P
DB-13 20 R Y Y Y P
DB-13 21 R Y Y Y P
DB-13 22 R Y Y Y P
DB-13 23 R Y Y Y P
DB-13 24 R Y Y Y P
DB-13 25 R Y Y Y P
DB-13 26 S Y Y Y P
DB-13 28 R Y Y Y P
DB-13 30 S N N N F Failed 90min discharge test Y N
DB-13 31 S Y Y Y P
DB-13 32 S Y Y Y P
DB-13 33 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-12 1 Y Y Y P
DB-12 4 Y Y Y P
DB-12 8 Y Y Y P
DB-13 10 Y Y Y P
DB-13 13 Y Y Y P
DB-13 16 N N N F Failed 90min discharge test Y N
DB-13 17 N N N F Failed 90min discharge test Y N
DB-13 27 Y Y Y P
DB-13 29 Y Y Y P
DB-13 34 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Hi - bays Y
Single defused T5 Y
Double bare batton twin T5 Y
Led down lights Y
2ft square defused Y
LED Batten 1200mm Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
12W Vibe LED Linkables Small appliance 8 Flickering Y N N
Exit Light No.16 BOH store entry 1 Failed 90min discharge test Y N N
Exit Light No.17 Staff office/lunch room entry 1 Failed 90min discharge test Y N N
Surface Mount Emergency Light No.3 Washing machines 1 Failed 90min discharge test Y N N Scissor lift was required
Surface Mount Emergency Light No.11 Vacuums 1 Failed 90min discharge test Y N N Scissor lift was required
Surface Mount Emergency Light No.30 BOH 1 Failed 90min discharge test Y N N Scissor lift was required
TV area lighting TV area 1 Lighting insufficient to illuminate area properly N N N Observation
Site Status SelectorStore now fully compliant
Next Test Due in 6 months29/11/2024