Partner Name | Sturdie Trade Services |
---|
State | VIC |
---|
Date of Visit | 29/05/2024 |
---|
Technician's Name | Amazigh Tari |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50F0017/0275 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in VIC | narre_warren |
---|
|
|
---|
Location Name | Narre Warren |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB-13 |
13 |
Y |
P |
|
|
DB-13 |
15 |
Y |
P |
|
|
DB-13 |
17 |
Y |
P |
|
|
DB-13 |
19 |
Y |
P |
|
|
DB-13 |
21 |
Y |
P |
|
|
DB-13 |
23 |
Y |
P |
|
|
DB-13 |
30 |
Y |
P |
|
|
DB-13 |
34 |
Y |
P |
|
|
DB-13 |
35 |
Y |
P |
|
|
DB-13 |
43 |
Y |
P |
|
|
DB-13 |
44 |
Y |
P |
|
|
DB-13 |
45 |
Y |
P |
|
|
DB-13 |
46 |
Y |
P |
|
|
DB-13 |
47 |
Y |
P |
|
|
DB-13 |
48 |
Y |
P |
|
|
DB-13A |
1 |
Y |
P |
|
|
DB-13A |
2 |
Y |
P |
|
|
DB-13A |
3 |
Y |
P |
|
|
DB-13A |
4 |
Y |
P |
|
|
DB-13A |
5 |
Y |
P |
|
|
DB-13A |
6 |
Y |
P |
|
|
DB-13A |
7 |
Y |
P |
|
|
DB-13A |
8 |
Y |
P |
|
|
DB-13A |
10 |
Y |
P |
|
|
DB-13A |
12 |
Y |
P |
|
|
DB-13A |
13 |
Y |
P |
|
|
DB-13A |
15 |
Y |
P |
|
|
DB-13A |
17 |
Y |
P |
|
|
DB-13A |
19 |
Y |
P |
|
|
DB-13A |
21 |
Y |
P |
|
|
DB-13A |
23 |
Y |
P |
|
|
DB-13A |
25 |
Y |
P |
|
|
DB-13A |
26 |
Y |
P |
|
|
DB-13A |
28 |
Y |
P |
|
|
DB-13A |
29 |
Y |
P |
|
|
DB-13A |
30 |
Y |
P |
|
|
DB-13A |
31 |
Y |
P |
|
|
DB-13A |
32 |
Y |
P |
|
|
DB-13A |
33 |
Y |
P |
|
|
DB-13A |
34 |
Y |
P |
|
|
DB-13A |
35 |
Y |
P |
|
|
DB-13A |
36 |
Y |
P |
|
|
DB-13A |
37 |
Y |
P |
|
|
DB-13A |
39 |
Y |
P |
|
|
DB-13A |
41 |
Y |
P |
|
|
DB-12 |
6 |
Y |
P |
|
|
DB-12 |
18 |
Y |
P |
|
|
DB-12 |
21 |
Y |
P |
|
|
DB-12 |
22 |
Y |
P |
|
|
DB-12 |
23 |
Y |
P |
|
|
DB-12 |
27 |
Y |
P |
|
|
DB-12 |
28 |
Y |
P |
|
|
DB-12 |
29 |
Y |
P |
|
|
DB-12 |
30 |
Y |
P |
|
|
DB-12 |
33 |
Y |
P |
|
|
DB-12 |
34 |
Y |
P |
|
|
DB-12 |
35 |
Y |
P |
|
|
DB-12 |
36 |
Y |
P |
|
|
DB-12 |
38 |
Y |
P |
|
|
DB-12 |
47 |
Y |
P |
|
|
DB-12 |
48 |
Y |
P |
|
|
DB-12B |
2 |
Y |
P |
|
|
DB-12B |
3 |
Y |
P |
|
|
DB-12B |
4 |
Y |
P |
|
|
DB-12B |
5 |
Y |
P |
|
|
DB-12B |
6 |
Y |
P |
|
|
DB-12B |
7 |
Y |
P |
|
|
DB-12B |
8 |
Y |
P |
|
|
DB-12B |
9 |
Y |
P |
|
|
DB-12B |
10 |
Y |
P |
|
|
DB-12B |
11 |
Y |
P |
|
|
DB-12B |
12 |
Y |
P |
|
|
DB-12B |
13 |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB-12 |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-12 |
3 |
S |
N |
N |
N |
F |
Failed 90min discharge test |
Y |
N |
DB-12 |
5 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-12 |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-12 |
7 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-12 |
9 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
11 |
S |
N |
N |
N |
F |
Failed 90min discharge test |
Y |
N |
DB-13 |
12 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
14 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
15 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
18 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
19 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
20 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
21 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
22 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
23 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
24 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
25 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
26 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
28 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
30 |
S |
N |
N |
N |
F |
Failed 90min discharge test |
Y |
N |
DB-13 |
31 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
32 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
33 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB-12 |
1 |
Y |
Y |
Y |
P |
|
|
|
DB-12 |
4 |
Y |
Y |
Y |
P |
|
|
|
DB-12 |
8 |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
10 |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
13 |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
16 |
N |
N |
N |
F |
Failed 90min discharge test |
Y |
N |
DB-13 |
17 |
N |
N |
N |
F |
Failed 90min discharge test |
Y |
N |
DB-13 |
27 |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
29 |
Y |
Y |
Y |
P |
|
|
|
DB-13 |
34 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
Hi - bays |
Y |
Single defused T5 |
Y |
Double bare batton twin T5 |
Y |
Led down lights |
Y |
2ft square defused |
Y |
LED Batten 1200mm |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
12W Vibe LED Linkables |
Small appliance |
8 |
Flickering |
Y |
N |
N |
|
Exit Light No.16 |
BOH store entry |
1 |
Failed 90min discharge test |
Y |
N |
N |
|
Exit Light No.17 |
Staff office/lunch room entry |
1 |
Failed 90min discharge test |
Y |
N |
N |
|
Surface Mount Emergency Light No.3 |
Washing machines |
1 |
Failed 90min discharge test |
Y |
N |
N |
Scissor lift was required |
Surface Mount Emergency Light No.11 |
Vacuums |
1 |
Failed 90min discharge test |
Y |
N |
N |
Scissor lift was required |
Surface Mount Emergency Light No.30 |
BOH |
1 |
Failed 90min discharge test |
Y |
N |
N |
Scissor lift was required |
TV area lighting |
TV area |
1 |
Lighting insufficient to illuminate area properly |
N |
N |
N |
Observation |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 29/11/2024 |
---|
| |
---|
| |